Overseas Employments
Promoters License No. 1886 / Karachi
|
|
|
|
| |
|
|
(Electrical Engineers)
Electrical
Engineer: SS001-08
ATTA-U-REHMAN
Objective:To
work in progressive organization offering challenging career opportunities and
congenial work environment
Education:
B.E
Electrical Engineering: from Quaid-e-Awam University of
engineering science &
Technology Nawabshah, 1st
division (67.9%), year 2007 on the
basis of Cumulative Result from 1st
Year to final Year under weightage system.
Intermediate (HSC): 2nd division,
year 2002, from B.I.S.E Sukkur, Sindh Matric
(SSC): 1St division, year 2000,
from B.I.S.E Sukkur, Sindh .
Working
Experience
:D
esignation Trainee Engineer
(Electrical) MM Pakistan (P v t) Ltd. @ 220MW Combined Cycle Power
Plant Korangi Project . (August: 2007
to date).Industrial
training:
Four weeks Internship at 150MW, Lakhira power house
based on FBC technology.Thesis/Project:
Power system control through PLC and DCS at Regional control
centre (South) @ Jamshoro Sindh .Computer
Skills:
Windows 98, XP, 2000
,MS-Office,Electronic Workbench.
Net Surfing. Personal:
S/O: Muhammad
Ismail Memon,
D.O.B:2/5/1985
, Single,Muslim,
Pakistani,C.N.I.C# 41306-9877812-1.
Languages:
English, Urdu, Sindhi.
Industrial Visits:
Pakistan
Steel Mill, Karachi,
Thermal Power Station, Jamshoro,Bin Qasim Thermal power station
KESC,Lakhira Power house based on FBC technology,Regional control centre (SOUTH)
Jamshoro Sindh,132/11 kv Society Gird station Nawabshah.
.
Electrical
Engineer: SS002-08
ASIF
AKHTAR
OBJECTIVE:
To
seek a career position in a progressive organization which should be challenging
and demanding,where I can practice and learn new skills.
EDUCATIONAL
QUALIFICATION:
N.E.D
UNIVERSITY OF ENGG. & TECH.
(1999-2003)
Department
Of Electrical Engineering.
B.E (ELECTRICAL).
Secured First Division in all
years.
ADAMJEE GOVT SCIENCE COLLEGE.(1997-1998).Intemediate-Engineering
:Passed
with an aggregate 79%.
(A-Grade).
SAQIB
PUBLIC SCHOOL. (1995-1996)Matric-Science.Passed
with 86.94%.
(A-One
Grade).
TOTAL
EXPERIENCE (3.7Years):
United
Bank Limited:
United
Bank Limited (UBL) is one
of the largest commercial banks in Pakistan
having more than 1,000 branches inside the country and 15 branches outside the
country.
Responsibilities:
I
am working in UBL Network Data Center ( NDC) as a
Electrical Engineer.
Responsible
for the Electrical System of NDC, Maintenance Operation and Troubleshooting(i.e.
UPS, Line conditioner, Rectifier, Air-conditioning System, Generator, Fire
Suppression and Fire Alarm System, Arrangement of Power connection of new server
installation in NDC and Test Lab.
Operation, Maintenance & Troubleshooting Experience of 2x60 KVA Online
Liebert Emerson Network Power Uninterruptible Power Supply (UPS) which is used
for critical online servers.
Installation,
Operation and Erection Experience in Siemens Generator 300KVA for NDC and
1000KVA for UBL Head Office Building.
Installation and Operation
Experience in American Power Conversion (APC) UPSs. which is used for UBL
Test Lab Servers and for entire building critical applications.
Can read UPS, generator, Electrical distribution of building power and
control diagrams
.Orient
Energy System:
Orient Energy Systems (OES)
is authorized dealer of GE Jenbacher gas engines for Pakistan, GE Jenbacher is a
part of GENERAL ELECTRIC USA.
Responsibilities:
I
worked in Orient Energy System in Operation Dept. Operation
and Maintenance Experience in Natural Gas Fuel Power Plant such as Jenbacher
generating set with Stamford Alternator.
Monitoring Dia.ne Xt system parameters
of Jenbacher gas engine which is used for rapid problem solving.Dia.ne Xt system
is the new GE Jenbacher management system.The system comprises powerful central
industrial controls that handle master control and feed back control for the
engine plant and visualization.Participated in Commissioning of 2
x JGS-320 1 Mega Watt Gas Engine
each in Dawood Cotton Mill Ltd.
Schedule/preventive
maintenance of generating sets & auxiliaries of plants.Can Read
Electrical Plans, Schematic Diagrams and Control Diagrams etc.Troubleshooting of
electrical system of PLC based Power Plants.
Can Read PLC Diagram also. Al-Abid
Silk Mills Ltd:
Al-Abid is a
leading manufacturer of Home Textile Products. The manufacturing processes are
certified on ISO 9002 standards.
Designation:Electrical
Engineer of Maintenance Department.Reports
To:Maintenance Manager.
Responsibilities:
I worked in Al-Abid Silk
Mill Ltd in Maintenance Department.
Troubleshooting of Textile Machineries there.
Can read Electrical Diagrams. Experience
in
Generating-Sets.
Made in U.S.A.
One Gas Generator 1.1 Megawatt and Two Diesel Generator (500/365) KVA .Rahman
Industries (Pvt.) Limited:
Rahman Industries (Pvt.) Limited is the Textile
Unit OF Pakistan. Designation:Electrical
Engineer OF Maintenance Departments. .Reports
To: Production
Director.
Responsibilities:
I worked as a Electrical
Engineer in Maintenance Department.
Carried out daily/weekly/monthly/annual preventive maintenance as per
maintenance plan/Schedule
according to ISO-9001:2000
Standard.
Schedule/preventive
maintenance of Generating sets. ERECTION
OF TEXTILE MACHINERY EXPERIENCE:Erection
of BRUCKNER (Stenter),
Made in West. Germany.Erection
of Gaston
County Dyeing Machine, Made in U.S.A. FINAL
YEAR PROJECT:
ANALYSIS
AND POST PROCESSING OF KARACHI MULTI EXCHANGE AREA NETWORK. This
Project is about telephone traffic evaluation in different Exchanges
(Based E-10, OCB283) of ALCATEL
PAKISTAN in Karachi. PROFESSIONAL
REGISTRATION:
Pakistan Engineering
Council (PEC): Life Member of PEC, Registration NO: ELECT/18842.COMPUTER
SKILLS:
Microsoft Word, Microsoft
Excel,Microsoft Office Outlook, Power Point, Internet, Email, Browsing.
PERSONAL:
Fathers
Name :Saleem
Akhtar N.I.C NO:42101-1526424-1
Date of Birth:13 January, 1980.
Place of Birth:Karachi.
.Domicile: Karachi. Marital Status:
Single.
Religion: Islam. REFERENCE:
Available On Request.
.
Electrical
Engineer: SS003-08
AZFAR
MAHMOOD
Objective:
Technology
savvy, highly motivated electrical engineering graduate, willing to relocate
with interest in project design, implementation and research. Strengths include
good communication skills, attention to details and ability to work well within
teams.
Personal
Information: Father's
Name: Mohammad Abu Mahmood Feroz Syed Date
& Place of Birth:July
29th, 1984 in Karachi, Pakistan. Language Ability: English,
Urdu.
Educational
Qualification:
|
Year
|
Qualifications
|
Institutions
|
|
1999
|
Matriculation
|
Saudi
Arabian International School, Al-Khobar, Saudi Arabia
|
|
2001
|
Intermediate
|
Saudi
Arabian International School, Al-Khobar, Saudi Arabia
|
|
2006
|
Bachelors
of Science in Electrical Engineering (BE) from USA.
|
University
of Houston, Houston, Texas, USA.
Graduation : December 2006
|
Professional
Experience:
Circuit Analysis, Numerical
Methods for Engineers, Applied Electromagnetism, Wave theory, Signals and
Systems, Advanced Circuits and Systems, Three Phase Systems, Electronics,
Digital Logic Design, Solid State Devices, Digital Electronics, Analog
Electronics, Automatic Control Systems, State Space Control Systems, Data
Communications and Internet Protocols, Telecommunications, Microwave
Engineering, Programming in C/C++,
FORTRAN, Motorola Assembly language and Matlab, Thermodynamics, Engineering
Statistics
.Software
developer and system analyst. specialized in data warehousing concepts.
eteam, Inc. south plain field, new jersey.
December
2006 - may 2007.
Responsible for Requirements
gathering, Data Quality Analysis and Business Analysis.
Performed Logical and Physical
Database design and developed the models.
Worked closely with the
Data Architect to assist in Physical Modeling and to develop schemas,
data types, primary and foreign keys, default values, table spaces, hashing,
partitioning, etc.
Design
and create mapping documents for
extracts from systems of record to data warehouses and data hubs.
Analyze relationships in Data models
and demoralizing tables into third normal form to support extract files.
Extensively used ETL
Informatica Powercenter for the extraction, transformation and load of
source databases.
Worked with various active
transformations in Informatica PowerCenter like Union, Filter
Transformation, Aggregator Transformation, Joiner Transformation, Normalizer
Transformation, Rank Transformation, Router Transformation, Sorter
Transformation, Source Qualifier, and Update Strategy Transformation.
Worked extensively with various Passive
transformations in Informatica PowerCenter like Expression Transformation,
Sequence Generator, Sorter Transformation, and Lookup Transformation.
Extensively worked with both Connected
and Un-Connected Lookups
Extensively worked with aggregate
functions like Avg, Min, Max, First, Last, Std Deviation in the Aggregator
Transformation.
Extensively made use of sorted input option for the performance tuning of
aggregator transformation.
Used
Filter transformation at the early
stages of the mapping for the performance tuning of the mapping.
Extensively used SQL Override, Sorter, and Filter in the Source
Qualifier Transformation.
Extensively used Normal Join, Full Outer
Join, Detail Outer Join, and master Outer Join in the Joiner
Transformation.
Responsible for the Data Cleansing of
Source Data using Ltrim and Rtrim operations of the Expression
Transformation. Also used Trillium 7.0
and its components Geo-Coder, Parser, Matcher and converter for cleansing the
data.
Extensively worked with Slowly Changing
Dimensions Type1, Type2, and Type3 for Data Loads.
Responsible for Error Handling using
session logs, debugger, and tracing level
Responsible for Performance tuning
in Informatica Powercenter at the Target Level, Source level, Mapping Level,
Session Level, and System Level.
Extensively worked with Lookup Caches
like Persistent Cache, Static Cache, Dynamic Cache, and Shared Cache.
Developed Reusable Mapplets and Transformations
for calculated business units.
Developed Workflows containing different Tasks like Worklets, and Sessions
Extensively worked with Database
Triggers, Stored Procedure, and Procedures.
Worked
hand in hand with the reporting team for the creation of
Monthly/Quarterly/Yearly reports using Business
Objects.
Wrote
UNIX shell scripts, SQL Statements and Stored Procedures (PL/SQL).
Handled Unit and Regression testing of the mappings. Assisted in UAT Testing
.
Assisted
in providing Production support and handling related issues.
Tech.
Support and Cataloging Specialist.
M.D. Anderson Library, University of Houston
:June
2005 December 2006
Operated
the Computer Lab/Library, Media Services and Helpdesk for
students, faculty and Administrative staff and
senior management
Assisted the Library Circulation, Reserve Material and Reference
materials
Maintained database of the processed book in the library
Classified
different inventory as Innopac and OCLC based
on the tracking system provided
.Electrical
Engineering intern.
.Jones
and carter, Houston, TX
.may
2004 august 2004
Appointed
as Lead Intern to facilitate interaction between all interns in the
program with various departments
Applied basic circuit knowledge into practical use to solve problems and
to calibrate some delicate instruments
Supplied electro-mechanical parts to the industry, as needed
Applied
the fundamental concepts of Electrostatics and Thermodynamics
Customer
Service Rep and Cashier.
University of Houston bookstore, Houston, tx
.July
2003 october 2003
Managed
the inventory for the bookstore/Worked in customer service department/Managed
cash for the shift Student
Course-Work Projects
Spring
2003- December 2006
Used C, C++
and Fortran and Matlab for several problem solving projects throughout the
semester Applied
basic numerical techniques for the completion of assigned projects
Recognized the importance of error estimates Designed a Bandpass/Bandstop Filter
using Matlab, and circuit components Implemented a program in Matlab to
determine the voltages and currents in a complex network
Designed and assembled a four way traffic light signal using flip-flops and
circuit components
Designed and
simulated Blood Transportation System along with Data acquisition using LabVIEW
Designed various
electronics and circuit layouts using CALP and simulated in Winspice software
Researched and
analyzed various waveforms and frequency spectrums using EMONA/TIMS
.301c System Unit.
|
HonorS:
Houston Community College (Honor Roll) Spring 2002-Fall
2003 Obtained First Position on National Scientific Model Making Contest
held on 2001.Membership
:Institute
of Electrical and Electronics Engineering (IEEE). Executive
Officer of the local chapter for three years
.
|
Computer/IT
skills :Knowledgeable
in programming, database and networking technologies In depth, hands on
experience in the following:
Operating
Systems : UNIX,
DOS, Windows NT, LINUX, Virtual Machines
.Programming
Languages : MATLAB,
C, C++, FORTRAN, LabVIEW, Calps,Cadence, Winspice, MS SQL Server, Toad, BTEQ
.Relational
Databases :
Oracle, Teradata, Sybase, MS SQL Server, DB2
.Application
Softwares : Simuaid,
Logicaid, MATLAB, MS Office, Autosys, Control M,
Maestro,
Erwin 4.5, Business Objects 6.5 and xi, Cognos,
Informatica,
Trillium, First Logic.Others:
Telnet, File Transfer
Protocol
.Microsoft
office suite, including Word, Excel, PowerPoint, and Access
.Other:Valid
Driving License of Texas, USA
.References:
Available on
request.
.
Electrical
Engineer: SS004-08
FAWAD SARWAR SHAIKH
Academic Education:
Intermediate
from Public School, Hyderabad, in the year 1993, secured (79.9% marks).
Matriculation from St. Bonaventure's high
School, Hyderabad, in the year 1991, secured (81.11% marks).
Bachelor of Electrical Engineering in
the year 2000, from Mehran University of Engineering and Technology, secured
(FIRST DIVISION 75.67% marks)
Computer Skills:
2 Years Diploma
in Computer Science from FAITH College of IT, Hyderabad, obtained
"A" Grade.
CCNA 2.0 from EAST WEST UNIVERSITY, CHICAGO
(KARACHI CAMPUS) in August 2002.
AUTOCAD and good knowledge of HVAC
, SAP (Version 4.8)
(Module: Plant Maintenance) - attain on Job training. (4th
June 8th June, 2007)
Technical Experience:
30th OCT 2002 Till
Present:KARACHI ELECTRIC SUPPLY CORPORATION
: Working for Karachi Electric
Supply Corporation in the capacity of "Assistant Manager"
in Engineering (Project Implementation) Department. Key responsibilities are to
monitor and ensure the smooth execution of different projects as a team leader
which included:
Installation of Bus-bar (housed in a chamber box), Energy meters, Circuit
Breakers and Rehabilitation of wiring in Multistory Buildings in KARACHI.
(Current project)
.Installation of C.T operated
meters, CT Operated GPRS meters and L.T. breakers on Pole Mounted Transformers.
Installation of Capacitors on L .T and H.T on primary and secondary distribution
system to reduce distribution losses
Installation of Earth Fault Indicator and Knife Switches on H.T cables in
order to reduce the clearing time of fault
.Inspection
of material used by K .E. S. C (Such as Transformers, LT Cable, Bus-bars,
Capacitors, Energy Meters, Insulators etc) in different projects. (As per
IEC and British standards).
General Administration: to administer a team of Sub-engineer/s,
Supervisors and other staff engage in the project. Check their
punctuality, attendance and place them in an appropriate way to obtain
maximum output.
12th DEC 2000 31st AUG 2002:
PEARL CONTINENTAL HOTEL (KARACHI AIRPORT)
Worked for Pearl
Continental Hotel Karachis Airport Operations as a Human Resource
Officer and then promoted to Assistant Personnel Manager.
Reasons for Leaving: Companys Airport Operations suspended.
Personal Details:
Father's Name: (Late) Ghulam Sarwar Sheikh
. Mother's Maiden Name:Dilshad
Sheikh
Marital Status: Married
. Nationality:
PAKISTAN
. Passport Number: BM
5194971
Date of Availability (In-case of selection): One
Month.
.
Electrical
Engineer: SS005-08
MUHAMMAD
USMAN MAHMOOD
EDUCATION
:Bachelor
of Science in Electrical Engineering
From University of
Engineering and Technology Taxila
.Graduation:Sept 2001.Specialization:
Communications
EXPERIENCE:
National
Telecommunication Corporation ( NTC )
Assistant Divisional Engineer(NGN)
May 2005-August 2007 (still
on job)
Next
Generation Network(NGN)My
Duties include:
Operation
and Maintenance of Huawei Softswitch
(SoftX 3000) which includes activities like Creation and administration of
number prefixes (codes)
Creation and administration of Trunk Groups
Creation and administration of
charging/zoning
Creation of Signaling Links which
includes C7 Links,M2UA & M3UA Links
Administration of CDRs[call detail records Monitoring
of traffic on the Trunk Groups and carrying out traffic analysis for capacity
planning based on the traffic ERLANGS.
Creation of subscribers and
configuring different services as per the requirement of
subscribers
Troubleshooting of problems related to speech and signaling
Operation
and Maintenance of Huawei Universal Media Gateways
(UMG 8900) which includes
Administration of E1s terminating on UMG
Administration of trunks
Operation
and Maintenance of Huawei Signalling Gateway
(SG 7000) which includes Creation of signaling links ie C7 Links,M3UA Links Maintenance
of Electric Power arrangement for
the NGN setup which includes
Operation and Maintenanace of rectifier
Operation and Maintenance of batteries Operation and Maintenance of Huawei NMS(
I Manager2000) from which the whole network can be administered
Furthermore
I performed the provisional acceptance testing (PAT) of the of SoftX 3000, UMG
8900 and SG 7000.
have foreign training on NGN from Huawei
Institute in Shenzhen China.
I also happened to conduct pre-installation
surveys of sites for NGN to
Determine the electric power requirements based on equipment load
Determine the capacity of generator required based on load
Capacity of battery banks require Asst
Divisional Engineer (TAC)(Sept
2004-May 2005
)INTERCONNECT
EXPOSURE
As Asst
Divisional Engineer (TAC)
I prepared interconnect agreements with mobile operators, local loops and
LDIs.
Negotiated the
services(origination,termination,transit,leasing of domestic private leased
circuits,provisioning of collocations etc etc) with different operators
based on the interconnect agreement and arranged for the implementation of the
same.
Negotiated
the billing and settlement procedures with the operators
SIEMENS EWSD
EXCHANGE EXPOSURE
Looked
after the operations of Siemens EWSD exchanges
and administered 13 EWSD Exchanges from EWSD Net Manager (Network Management
System).O&M activities included
Creation/Administration of number prefixes & Trunkgroups
Monitoring
of traffic on the Trunk Groups and carrying out traffic analysis for capacity
planning based on the traffic ERLANGS.
Creation/Administration
of Signaling Links
Creation/Administration of charging
Administration of CDRs[call detail recordsTroubleshooting of problems related to
speech and signaling.
Dancom Pakistan Pvt Ltd:Senior systems
Engineer (May 2003-Sept 2004
)Looked after the Dancom
DSL(Digital Subscriber Line) operations.
Worked on IP DSLAMs and Cisco IP Routers.
Prepared NGN RFP being a member of NGN design team.
Sysnet Pakistan Pvt Ltd.Network
Engineer (Nov 2001-May 2003
)Installed Wide Area Network
(WAN) for HBL to interconnect their ATM Machines throughout Pakistan. During the
course, I happened to work on the Cisco equipment like Cisco 1751 Routers, Cisco
2600 Routers, Cisco 3600 Routers.The WAN consisted of diverse transmission
mediums like Digital Access Cross Connect, Leased Lines and Wireless.
COURSES
/ TRAININGS:
NGN Operations Training from Training
Center Huawei Technologies Shenzhen China
Traffic Fundamentals and Forecasting from Institute of Communication
Technologies Islamabad Pakistan
A short course on NGN from Telecom Staff College Haripur Pakistan
Siemens Net Manager Training.PROFESSIONAL
ASSOCIATIONS:
I happened to be a member of Institute of Electrical and Electronic
Engineers(IEEE) from 1997-2000.
.
Electrical
Engineer: SS006-08
MUHAMMAD SUBHAN
SOLANGI
(MATERIAL AND PROJECT ENGINEER)
JOB
EXPERIENCE WITH JAL INTERNATIONAL KSA
: (JUNE 2006 TO
JUNE 2007)
WORKED AS MATERIAL ENGINEER at
SAUDI IRON AND STEEL COMPANY (HADEED) JUBAIL INDUSTRIAL CITY KINGDOM OF SAUDI
ARABIA.
Responsibilities:
Handling the all
material including unloading at store yard and loading for site.
Coordination with Owner and user store staff.
Keeping all the records of incoming and issuing material.
Making the shortcoming list of materials and inform to management on time.
(DEC 2005 TO JUNE 2006)
WORKED AS MATERIAL ENGINEER AT GULF
FARABI PETROCHEMICAL PLANT AT JABAIL KINGDOM OF SAUDI ARABIA.
Responsibilities:
Handling
the all material including unloading at store yard and loading for site.
Coordination with Owner and user store staff.
Keeping all the records of incoming and issuing material.
Making the shortcoming list of materials and inform to management on time.
Making MTO from the drawings.
JOB
EXPERIENCE WITH KARACHI ELECTRIC SUPPLY CORPORATION LTD:
(NOV 2004 TO DEC 2005)
Worked as Assistant Executive
Engineer with KARACHI ELECTRIC SUPPLY
CORPORATION at (DID) III at State Life Building Abdullah Haroon Road
Karachi.
Responsibilities:
Over all Under Ground
Cable Laying in charge of 11KV Feeders in the different areas of the City in
D-II.
Coordination with other area Engineers.
Cable termination, jointing and installation of RMU (Ring man units) of
11KV.
JOB
EXPERIENCE WITH
TECHNO ENGINEERING
SERVICES (PVT)
LTD:
(SEP 2003 TO OCT 2004)
Worked as Electrical Engineer
(Cathodic Protection Engineer) at white oil pipeline project (WOPP) at section
III & IV Shikarpur to Mehmood kot. (A
PROJECT OF PARCO).
Responsibilities:
Over all in charge of temporary cathodic protection of pipeline and also
permanent cathodic protection of pipeline.
Installation of Solar Panels & rectifiers in the remote areas.
Additional charge of all CP materials store to control the minimum wastage at
site.
JOB
EXPERIENCE WITH
VAROW INTERNATIONAL
PAKISTAN: (AUG
2002 TO JUL 2003) Worked as Project
Engineer at SAWAN
GAS FIELD DEVELOPMENT PROJECT (A PROJECT OF OMV PAKISTAN)
Responsibilities:
INCHARGE, MANAGER ALL ACTIVITIES AND MONITORING FOR FOLLOWING
DISCIPLINRS. Installation
of Sub-Station with Transformers and Switchgears (3.3 KV/440V )
Erection of Perimeter Lighting, Street Lighting, Building Lighting Cricket
Ground Lighting.
Installation of P.A & FNG System
Installation of BDs inside & outside Building
(JAN 2002 TO JUL 2002)
Worked in Head office responsible for MTO, BOQ, & Procurement for
different Projects of the companies running in Pakistan.
JOB
EXPERIENCE WITH
DESCON ENGINEERING
LIMITED:
(APR 2001 TO DEC 2001)
Worked as Electrical Engineer at
OMV PAKISTAN EPC PROJECT at KADANWARI GAS FIELD.
Responsibilities:
Cathodic
Protections of pipe Lines.
Erection of all kinds MCCs Control Panels inside Sub-Station & out side in
Process area.
Cable Routing, Cable laying & Earthing of the whole Plant.
Lighting system of the Plant.
Installation of the field instrumentation.
(OCT 2000 TO MAR 2001
) Worked as Electrical Engineer at BOUROGE
PETROCHEMICAL PLANT & MARINE HANDLING FACILITY AT RUWAIS, ABU DHABI (U.A.E.)
Responsibilities:
Cable Routing, Cable laying & Earthing of the whole Plant.
Lighting system of the Plant
Installation of P.A & FNG System
.Installation of 25 meter high (6x1000W) Lighting Tower Masts.
Installation of transformers & sub station Panels 33KV/6KV & 6KV/440V.
(MAY 2000 TO SEP 2000) Worked
as Electrical Engineer at PTC
PLANT (UPGRADING) AKORA KHATAK.
Responsibility:
Responsible for over all
activities as In charge of the project.
(APR 1999 TO JAN 2000) Worked
as Electrical Engineer with DESCON
& SBG Joint Venture in JUBAIL PETROCHEMICAL COMPANY AT JUBAIL (KSA).
Responsibilities:
Cable Routing, Cable laying & Earthing of the whole Plant
,Erection of all kinds MCCs
Control Panels inside Sub-Station & out side in Process area.
,Meggaring, Testing & Commissioning of all electrical equipments.
Installation of lighting system in the Plant
Cathodic Protections of the concrete Structure of Sea water intake &
Outlet structure.
(OCT 1998 TO APR 1999) Worked
as Electrical Engineer at ATTOCK
OIL REFINERY LTD MORGAH, RAWALPINDI AT HEAVY CRUDE OIL DEPARTMENT.
Responsibilities:
Erection of all kinds MCCs Control Panels inside Sub-Station & out
side in Process area
Cable Routing, Cable laying & Earthing of the whole Plant
Meggaring, Testing & Commissioning of all electrical equipments.
Installation of lighting system in the Plant.
(APR
1998 TO SEP 1998.)
Worked as Electrical Engineer at FAUJI
JORDEN FERTILIZER COMPLEX BIN QASIM KARACHI.
Responsibilities:
Erection of all kinds MCCs Control Panels inside DAP Sub-Station &
out side in Process area
,Cable Routing (Including fabrication of cable tray &conduit installation),
Cable laying & Earthing of the whole Plant
,Meggaring, Testing & Commissioning of all electrical equipments.
Installation of lighting system in the DAP Plant area.
Cathodic Protection of the pipelines.
(JUN 1997 TO APR 19980)
Worked as Electrical Engineer at 727
MW AES LAL PIR THERMAL POWER PLANT.
Responsibilities:
Cable Routing (Including fabrication of cable tray &conduit
installation), Cable laying & Earthing of the FGD Plant Area.
Installation with commissioning of all MCCs & control Panels of LIMESTONE
HANDLING SYSTEM.
Installation of lighting system in the LIMESTONE HANDLING Plant area.
Maintenance & Operation of the LIMESTONE HANDLING Plant area.
Know how about Win word & Excel programme on Computer. (SEP
1996 TO MAY 1997)
Worked as Electrical Engineer at 3000
TPD FAUJI CEMENT PLANT JHANG BAHATER.
Responsibilities:
Erection of all kinds MCCs Control Panels inside Sub-Station & out
side in Process area
Cable Routing, Cable laying & Earthing of the whole Plant
Meggaring, Testing, initial operation & Commissioning of all electrical
equipments.
Installation of lighting system in the Plant.
Installation of 132 KV grids Station with 20 MVA transformers.
(JUN 1995 TO AUG 1996)
Worked as Electrical Engineer at 3000
TPD LUCKY CEMENT PLANT PEZU.
Responsibilities:
Installation & commissioning of all Electrical rooms / sub stations.
Installation & testing of all Low Voltage Transformers.
Installation of lighting & lightening system at Plant.
Earthing of the whole plant equipments
Cable laying of the plant
Cable routing with cable trays and conduits.
(JAN 1994 TO JUN 1995)
Worked as Assistant Electrical Engineer
at QADIR PUR GAS
FIELD near GHOTKI.
Responsibilities:
Erection of outfield equipments.
Earthing of the whole plant equipments.
Installation of PA & Fire Alarm System.
Cathodic Protection of the pipelines.
Primary commissioning of the Plant
. SAFTY AWARDS AND APPRECIATIONS:
Awarded by CLOUGH
ENGINEERING LTD AT SAWANGAS FIELD.
Awarded by SNC LAVILAN LTD AT N-PARAFIN PLANT AT JUBAIL.
Awarded by JAL INTERNATIONAL JUBAIL.
COMPUTER SKILLS.
MICROSOFT OFFICE WORK.
PERSONAL
INFORMATION
:
FATHERS NAME: MUHAMMAD
YOUSIF SOLANGI
DATE OF BIRTH:Dec 01, 1967
LANGUAGE:URDU, ENGLISH, SINDHI, PUNJABI & SERAIKI
N.I.C:45101-0632839-7
PAKISTANI
P.E.C.No:ELECTRICAL/8701(LIFE TIME MEMBER)
PASSPORT No:AA5708391 QUALIFICATION:B.E
(ELECTRICAL) EXPERIENCE:
- 12 Years.
ACADEMIC
QUALIFICATION
:
INSTITUTE
EXAMS:
PASSING YEAR DIVISION
GPHS DAHARKI SECONDARY
SCHOOL
1982
1ST
GDC
GHOTKI
HIGHER SEC.SCHOOL
1984
1ST
MUET
JAMSHORO B.E ELECTRICAL 1990
1ST
.
Electrical
Engineer: SS007-08
MUHAMMAD
ATHAR (Senior
Resident Engineer
(Electrical)
National
Bank Of Pakistan Engineering
(Department Head Office Karachi)
ACADEMIC
DATA: Master
in Engineering
:
Place:NED
University of Engineering &
Technology ( Main Campus ) Karachi.
Field:ELECTRICAL
ENGINERING
CGPA:
2.91
Duration: August 1997
to December 2000
Bachelor
of Engineering:
Place:NED
University of Engineering and Technology, Karachi(
Main Campus )
Field:
Electrical
Engineering
Grade:FIRST
DIVISION ( Securing 90.7
% marks in the Final Year )
Duration:1984-1989
Project: Electrification
of Bolan Casting ( an industrial unit ) at Hub, Baluchistan.
Higher
School Certificate:
College:
Govt Science College, Malir Cantt, Karachi
Field:Pre
Engineering Group
Grade:
FIRST
DIVISION (
69.8
% ) 1982 - 83
Secondary
School Certifcate
School:Govt
High School, Military Farms HQ, Okara , Pakistan
Field:Science
Group
Grade:A
Grade( 74. 8 % )
DIPOMA
IN BANKING ( Part I & II ):
Period:August
1998 To
July 2001
Institution:
Institute
of Bankers in Pakistan ( IBP )
Subjects:
Economics
, Monetary Theory , Foreign Trade
& Foreign Exchange
Higher
Accountancy , Banking Law
& Practice , Commercial
Law
.ENGLISH
PROFICIENCY:
ELTS: Band
: 7
Speaking=9
, Writing=7
, Listening=6 , Reading=6
Test Date: 23-10-2003
TOEFL:
Score: 597
Test Date: April-1995
WORK
EXPERIENCE: NATONAL
BANK OF
PAKISTAN
.1996
ONWARD ( Current Employer )
:
Engineering
Department , Operations Group
, National
Bank of Pakistan.
Designation
/ Postion :
I
have been working since Sep-96 onward as Resident
Engineer ( Electrical )
after my selection through Pakistan
Banking & Finance Services Commission. I was promoted as Senior
Resident Engineer ( Electrical )
w.e.f 1-12-2002.
Duties
/ Job Description
:
PROJECT
PLANNING &
MANAGEMENT
.
Designing/Review of Design and planning for Electrical projects of
high rise commercial buildings of the National Bank of Pakistan all over the
country including
.Power
Distribution
,
Load Calculations
,Standby
Power Generators
,
Lifts / Elevators,Fire Detection, Alarm & Suppression
, Data
Cabling
,
Un-interruptible Power Supplies Systems
,Procurement
of Engineering Equipment/Material
,
Coordination
witl Security Department
,
Preparing Feasibility
,
Load Assessment and Cost Estimation of
all the electrification projects undertaken by National Bank of Pakistan
throughout the country. Pre-qualification
and preparation of tenders and contract documents.
Presentation of the design, plan and budget of the project and the submission
of reports to the top management
for obtaining financial sanctions and to arrange execution of the project within
budgetary allocations.
Direct
supervision of project
sites located in Karachi and helping the Regional Head Quarters of Bank for
sites located outside Karachi including intermittent visits of site as and
when required.
Coordination
with consultants and contractors for complete supervision and
progress of all on-going projects. Review of project plans and scrutiny of
contract agreements. Checking and verification of the bills of the contractors
and consultants (if any).
Procurement of Engineering
works / projects as per Government policy under Public Procurement Rules
PPRA-2004.
Preparation
of electrical
drawings
using AutoCAD.
Use
of MS
Project & MS Office
for managing different phases of a project. Coordination
with Government Departments like SSGC, KESC, and CDGK etc.
IMPERIAL
CONSTRUCTION COMPANY:
(
1990 1996 ):
From Dec 1990 to Sep1996 I served in the Imperial Construction Co. (
ICC ) as Assistant Divisional Engineer located at 202, Faiyaz Centre, Main
Shahra-e-Faisal,Karachi. Duties
/ Job Description
:
I worked on
various Power
Transmission Lines and Distribution Projects of Karachi Electric Supply
Corporation ( KESC )
in various parts of Karachi and around including projects funded by the Asian
Development Bank (ADB) and
Lehmyer
(Germany) were
the consultant. The name of the projects I worked on are 5th
Power Sector Loan Project, 6th unit power transmission line project,
T/009 and T/006 Projects. Professional
Courses and Trainings:
Advance
project management(2006
-2006
) NED
University of Engineering &
Technology, Karachi.
. Certificate Course in
PLC Automation
(2001-2001)
Institute of Automation &
Computer Solution, Karachi.
AUTOCAD
2000:
(2003-2003)
Technoman Institute of Computer Science & Engineering ,
Karachi
GENERATOR
PERFORMANCE EVALUATION
Date : 24th
April 2003
Conducted by:M/s Wartsila
Pakistan
FIRE
SAFETY COURSE
(2002-
2002)
National Institute of Fire Technology, Islamabad ( NIFT )
COMPUTER
SKILLS. AUTOCAD
2000,MS PROJECT
,MS EXCEL INTERNET
,MS WORD,MS
POWER POINT,VISUAL
BASIC 6.0 PERSONAL
DATA:
Date of Birth: 23-08-1965
, Marital
Status:Married
,Citizenship: Pakistan
,Driving License:Yes
.
.
Electrical
Engineer: SS008-08
MAJID
ALI BHATTI
OBJECTIVE:To
work for a multinational organization, where I can utilize my competencies in
key areas of process improvement & can interact with executive management
and clients.SUMMAR
Y:
Senior technology professional with more than 16 years of working
experience combining broad based technology, leadership, vision, business acumen
and management expertise in developing and implementing company-wide short and
long-term technology solutions to support and meet the continually evolving
power systems requirements of an organization. PERSONAL:
Fathers Name: Abdul Slam Bhatti.
Date of Birth:
06-06-1964 N. I. C.#:42501-1448685-3.
EDUCATION:
1.Bachelors of Engineering in Electrical Technology from
NED University Karachi in 1990.
2.
Diploma of Associate Engineering from Pak Swedish Inst: in 1986 (Landhi
Karachi).
3.Competency Certificate of Electrical Supervisor from the govt: of sindh in
1993 (Karachi).
COMPUTER
SKILL:
Windows 95 / 98 / XP & Windows N T.
Command on Internet.
M. S. Word.
M. S. Excel.
EXPERIENCE: (Deputy
Manager Electrical) - Dadabhoy Cement Industries
Limited -Feb:2004 -To date
Description: To represent
DGM (E) regarding the matters related to ISO-9001-2000 in his absence.
To get the process, master and other instruments, identified, calibrated,
recorded and properly tagged with in scheduled period .To plan maintain and
monitor preventive and shut down maintenance schedule of electrical department
and keep the proper record duly verified in time. Bring any issue to the
management attention of equipment reliability and its upgrade. To organize
duties and working schedules for the Electrical Department. Take pro-active
actions if any trouble noticed during operation of equipments. Troubleshooting
of plant machinery, maintenance and installation of LT/HT panels, power factor
panels, designing and assembling of control and power panels, troubleshooting of
AC/ DC / HT motors, slip rings/squirrel cadge induction motors, Overhead
Transmission line. Repair & Maintenance of different kinds of Circuit
Breakers & Switchgears like SF6, OCBs, ACBs, & VCBs. Inspection and
maintenance of High Voltage Electrostatic Precipitators (E.P) Pneumatic
Controls, Silo Level / Gauges & etc. Environment
/ Plant & Machinery:
Wartsilla Generators (04 Nos 3.6 mw of 6.3 kv)
,Plant Consuming Load (8.8 mw)
,High
Tension Motors (2300 kw, 1500 kw, 910 kw etc.)
,Boge
Compressors (Screw Type)
,Weigh Feeders (Hesler )
,Data Acquisition System. (Speedy Automation),
Roto Packer (Haver), E . P (Electro Precipitator)
,
Dust Collectors etc. (Electrical
Engineer)
National Tiles
& Ceramics Limited July 1993 Feb
2004.
Description:
Department in charge of three supervisor, six technician and three
assistants, Where the core responsibility of the department is troubleshooting
of plant machinery, maintenance and installation of Generators, LT/HT panels,
power factor panels, Designing / Assembling of control and power panels.
Troubleshooting of AC/ DC motors, Rectification of BURNER panels, maintenance
and repairing of compressors, Pneumatic Controls, Silo Levels / Gauges and
indications & etc.Environment /
Plant & Machinery:
Rolls Royals Generator.:Tunnel Kilns (Hiemsouth).
Shaping Handling / Extruder Machine (Grmy):PLCs
(Siemens S/5).
Cummins Generators.
CAT Generators.
AGROB & KELLER (Germany) Plants.
IWATTA, INGERSOL RAND (Compressors (Electrical
Foreman).
Saudi
Ceramics Company Limited:
Nov 1990
May 1993.
Description: Worked
as a Shift in charge of the Electrical Maintenance department. Where the core
responsibility of trouble shooting of plant machineries, Maintenance &
overhauling of motors. Designing / assembling of control and power panels.
Troubleshooting of AC/ DC motors, Rectification of BURNER panels, maintenance
and repairing of compressors, Pneumatic Controls, Silo Levels / Gauges etc.Environment
/ Plant & Machinery:Tunnel Kiln (Red Hammer, Heim South):Sacmi Press
Machine,Crushing Plant :Loading /Unloading
Machine,Ball Mills:LAB Equipments.
Carmatic Machine :Photo Cells,Intermac
Machine:Water Boosting Plant,Hydraulic Machine:LT / HT & Control Panels.
Boiler (Bauher).Other Major Projects:
Installation, Testing and commissioning of project in SARELA CEMENT LTD
(SIEMENS) Quetta.
Installation, Testing and commissioning of project in MILK PLANT (SIEMENS).Quetta.
Installation and Commissioning of ANWARZAIB WHITE CEMENT Project,
(A. E. G.).Bholari Kotri.
Installation and Commissioning of HUBCO POWER PLANT (One Turbine of 323 MW).
.
Electrical Engineer: SS009-08
S.G.IMAM
Education:
Bachelor
Engineering (B.E Elect.). NED
Engineering University.
Bachelor
of Engineering degree achieved first class standing and accepted by CanadianCouncil
of Professional Engineer (CCPE).
Bachelor
of engineering degree evaluated by University
of Toronto as equivalent to Canadian Engineering degree.
Training
and Skills:
One year job training
program in petrochemical industry. (National Refinery Ltd.), Attended course
Management training for engineers NIPA. , Certificate course in Autocad from
George Brown College Toronto. 2001,Proficient in computer based program
related to my field and knowledge of MS word and Networking Essentials.
Professional Association:
EIT (Professional Engineer
Ontario.)
Member Society of American Military Engineers. (SAME)
Member of Pakistan Engineering Council.
Member Institute Of Engineers Pakistan.
Experience:
(2001 t0 Date) Alpeza General Contracting, Mississauga, Ontario. Canada.
(Project
Electrical Engineer)
Currently working with Alpeza General Contracting involved
in various on going projects of city of Toronto, housing complex and high rise
building projects. Responsibilities include supervision of the electrical power
distribution system comprising of medium voltage substation, h .v and l .v
switch gear associated control system. Electrification of the high rise
building. Supervised several electrical work crews, which installed
many-advanced electrical system- Fire Alarm, air conditioning controls, public
address and lightning protection system. Review
and prepared shop and design drawing for the various electrical system. Prepare
coordination drawing to cope with other utilities. Liaison with the design
consultant and client and act as primary contact of the company.(1999
to 2000)
ATC-
Limited RIYADH.
(Project
Electrical Engineer)
Worked as electrical engineer supervised, installation , testing ,
commissioning of medium voltage power distribution system comprising of m.v and
l.v switch gear and associated controls. Installation of electrical motors and
motor controls system in pump houses. Street and walkway ligting system.
Supervised highrise building,sports and housing complexes electrification, Fire
Alarm, public address system and
ably motivated several electrical crews to work in a team spirit to meet the
targets. Preparation of shop and coordination drawings. Material take off ,
tendering work for the various projects.(1983
to 1990)A.H-
ADA Limited
KHOBAR (Electrical
Engineer)
Electrical Engineer without the construction contractor Al
Husseini ADA
(Saudi Arabia) Ltd., at King Khalid Military City $ 240 Million Family
Housing project in north-eastern Saudi Arabia. Successfully performed
supervision, installation, testing and commissioning of Electrical power
distribution system comprising of power transformers, switch gears, motor
controls and motor control centres, pump houses, cathodic protection, Lightning
protection, Fire Alarm and Public Address system. Electrification of family
housing units and all external cable laying, jointing, termination, street and
walk way lighting work. (1976 to
1982)
NCC Limited.
PAK.
(Electrical
Engineer)
Electrical Project Engineer to supervision, installation, testing and
commissioning of ZARQA
REFINERY EXPANSION PROJECT JORDAN, electrical power distribution
system comprising of m.v and l.v substation and associated switch gear and
controls, Electrification of the process unit, external utilities, conical and
spherical storage tanks, vessels, columns, furnaces for installation of
explosion proof fixture, fittings and gub boxes. Motors and motor control center
in pump houses, cathodic protection of pipe lines.
Worked at NATIONAL
REFINERY EXPANSION PROJECT ( KARACHI ). As a electrical engineer to
supervision, installation, testing and commissioning of all electrical m .v and
l .v system, sub stations, explosion proof lighting, MCC panels adamantly
adhered to the fuel oil refinery in the process unit, external utilities,
storage tanks, pump houses, LPG vessels, furnace and vertical columns and flare.
Also supervised some of the related instrumentation work of process unit by
installing flow and pressure transmitters, pressure gauges, level instruments,
air regulators, thermometers, orifice plates, thermocouples, tank level
indicators, solenoid valves, control valves, copper tubing and air supply
piping.
.
Electrical Engineer: SS010-08
TALAT MAHOOD
Personal
Information:
|
Name
|
Talat
Mahmood
|
|
Present
Employer
|
Syed
Bhais (Pvt.) Ltd.
|
|
Division
|
Product
Engineering Department
|
|
Present
Post held
|
Product
Engineer
|
|
Total
Work Experience
|
5
Years.
|
|
Major
Experience Area
|
Technical
Support to Production and Customer and Testing of Electronic Meter
|
Academic
Information
:
|
Bachelors
|
Subject
Year
of passing
Division
Institution
|
Electrical
Engineering (Electronics & Communication)
2002
First
Class
University
of Engineering & Technology, Lahore, Pakistan.
|
|
Intermediate
|
Subjects
Year
of passing
Grade
College
|
Pre-
Engineering
1997
A
Government
College, Lahore, Pakistan.
|
|
Matriculation
|
Subjects
Year
of passing
Grade
School
Distinction
|
Science
1995
A+
Pakistan
railway High School
Scholarship
|
Experience
Summary: (Oct
2005 To Date)
Syed Bhais Pvt. Ltd.
Lahore Pakistan
.(Product Engineer)
Product
Introduction:Our
group has developed a high class Digital Electronic Meter that is compliant to
international meter testing standard (IEC). We have developed a GSM Based
Metering Solution and we are also working over Grid Station Metering, Monitoring
& Control Unit.
Responsibilities Towards
Product:
Study
of newly designed product before coming that to production as per respected IEC
and customer specifications.
Technical
Solutions of problems regarding product during production.
Technical Support to Production and Customer (WAPDA, KESC) regarding the
product.
Recommendations for changes in design if required as per specifications.
Compilation and issuance of Engineering Instructions to Production department
during production.
Designing of equipments used in production (Testing Platforms, Phantom loads)
Trouble shooting of Electrical and Electronic Equipments used in production.(3
phase supply sources, Phantom loads).
Testing Responsibilities:
Testing of
Three Phase Vector Energy Meter DSP Engine and Control Division. The meter is
approved from WAPDA (Electricity Authority in Pakistan) Design Department. The
latest version of the Meter also includes the GSM Compatibility and sends and
receives metering information and programmable
parameters through GSM Link. The ZigBee based RF Enabled meter is under the
process of testing.
I
have the responsibility of testing of Electronic meters like EMC tests
(containing Surge,
EFT, ESD, Conducted and Radiated Disturbance, Damped Oscillatory test),
Environmental conditions tests, Accuracy tests.(June
2003 to Oct 2005)Water
And Power Development Authority Pakistan(WAPDA)
(Assistant Director Transmission Lines Design)
.Responsibilities.
My responsibilities in WAPDA were to Design 220/132 kV T/Lines. The
designing process included Technical route approval of T/Line, Route Survey (if
required), Material allocation for approved T/Line, Material Procurement for
different projects, Tenders Evaluation against different T/Line projects,
Technical Communication with Contractor (if involved ), Material Testing as per
WAPDA as well as IEC specifications and preparation of new Specifications based
upon IEC as well as ANSI specifications. Courses
During WAPDA Job:
I also have attended a short
course in NUST for 3 months on GIS (Geographical Information System) from IGIS,
NUST Islamabad. That was for a project of topographical survey of Indus Valley
for a 765KV transmission line from Bhasha to Mansehra. In that course I worked
on tools like ARC GIS, Arc View, ARDAS
on Bird View Images taken from satellite.And also during that short course, i
did a project of Digitization of F-10 map and current situation of WAPDA power
distribution system in F-10 subdivision. (July
2002 to June 2003)Cyber
Access, a project by ORIX Leasing. (Network
Engineer).Responsibilities
: Management of Access
Server of the System, which gives access to different Banks Data Base for
their Credit card and Debit Card Access.
.
Electrical Engineer: SS011-08
Engr.
SAYED
SHAHID HUSSAIN SHAH
OBJECTIVE:
Looking
for a dynamic position in a fast growing organization to enhance my professional
capabilities, and to serve with best of my abilities.
PERSONAL
: Fathers
Name:Sayed Fayaz Hussain Shah.
N.I.C. NO:41201-2096184-1(Pakistani)
Date
of Birth:31-08-1976
Domicile:
Dadu (Rural)
Material
Status:Unmarried Educational
Qualification:
2001:B.E
Electrical from M.U.E.T Jamshoro in
first division(74.5%)
3-Year
Diploma in Electrical Engineer Govt: poly Technic Institute Dadu in First
class first division. (86.0%)
Matirc
(Science) from Govt: High School Phulji Station in Grade A
.Experiences:
(2001-2002)Sapphire
Energy Limited(Trainee
Electrical Engineer)
HESCO
(WAPDA)Hyderabad
Electrical Supply
Company.Assistant
Manager (Electrical)15th July 2002 up-to date.
RESPONSIBILITIES:
Maintenance
of Switch Gears, it includes Circuit Breakers, Switches, Fuses, Isolators and
Relays. Put
in place strategies to improve the availability/ reliability of the electrical
system.Support the operation Department by implementing modification to the
exiting electrical system including recommendations for design and installation
of new equipment.To ensure that the electrical system and associated equipments
are managed safely and efficiently.
Installation and maintenance of transformers.Operation and maintenance of
11 KV distribution systems.
Operation of protecting/ safety devices troubleshooting and maintenance
of distribution system.
To ensure that the maintenance policy is managed in accordance with WAPDA
safety policy.Suggest and plan activities to manage the technical staff when
carrying out maintenance and engineering change.Conducting weekly progress
review meeting with engineers, Sub-Contractors, Client Representatives and other
parties involved in the Operation System.
Preparing Schedule & implementing strictly with coordination of all
the technical staff and professionals.Assisting the Electrical Manager, to
provide technical support to the electrical crew for the project.
Making activity schedule & records of the workers with their
respective jobs & activities.
Technical
Courses:T-500,
C-500 & S.w-200 From R.T.C HESCO Jamshoro.Computer
Skills:
Internet
browsing,Ms-Office
2000 / 2003,
Electronic
work Bench and circuit Maker.Language
Proficiency:
English (Written & Spoken), Urdu and
Sindhi.
.
Other CV,s are under
processes
|

Work To Do
|
|
|