Overseas Employments Promoters License No. 1886 / Karachi

 
       Home        Data Bank / View Resumes             Clients             Contact Us               Visa Processing
 

Thanks To Visit First       Pakistani   On Line.......Super Services, Manpower Consultants..........Overseas Employment Promoters and Importer, Exporters.

 
Contact Super Services At ssmanpower@ssmanpower.org Please Be Sure Mention the Worker Code e.g  Electrical Eng:.SS-001-08.

                       (Electrical Engineers)

Electrical Engineer: SS001-08

ATTA-U-REHMAN    

Objective:To work in progressive organization offering challenging career opportunities and congenial work environment

Education: B.E Electrical Engineering: from Quaid-e-Awam University of engineering science & Technology Nawabshah, 1st division (67.9%), year 2007 on the basis of Cumulative Result from 1st Year to final Year under weightage system. Intermediate (HSC): 2nd division, year 2002, from B.I.S.E Sukkur, Sindh Matric (SSC): 1St division, year 2000, from B.I.S.E Sukkur, Sindh .   Working Experience :D esignation “Trainee Engineer (Electrical)” MM Pakistan (P v t) Ltd. @ 220MW Combined Cycle Power Plant Korangi Project . (August: 2007 –to date).Industrial training: Four weeks Internship at 150MW, Lakhira power house based on FBC technology.Thesis/Project: Power system control through PLC and DCS at Regional control centre (South) @ Jamshoro Sindh .Computer Skills: Windows 98, XP, 2000 ,MS-Office,Electronic Workbench. Net Surfing. Personal: S/O: Muhammad Ismail Memon,  D.O.B:2/5/1985 , Single,Muslim,  Pakistani,C.N.I.C# 41306-9877812-1. Languages: English, Urdu, Sindhi.

 Industrial Visits: Pakistan Steel Mill, Karachi, Thermal Power Station, Jamshoro,Bin Qasim Thermal power station KESC,Lakhira Power house based on FBC technology,Regional control centre (SOUTH) Jamshoro Sindh,132/11 kv Society Gird station Nawabshah.

                                                                    ……………….………………………

Electrical Engineer: SS002-08

ASIF AKHTAR

OBJECTIVE: To seek a career position in a progressive organization which should be challenging and demanding,where I can practice and learn new skills.

EDUCATIONAL QUALIFICATION:

N.E.D UNIVERSITY OF ENGG. & TECH. (1999-2003) Department Of Electrical Engineering. B.E (ELECTRICAL). Secured First Division in all years. ADAMJEE GOVT SCIENCE COLLEGE.(1997-1998).Intemediate-Engineering :Passed with an aggregate 79%. (A-Grade). SAQIB PUBLIC SCHOOL. (1995-1996)Matric-Science.Passed with 86.94%. (A-One Grade). TOTAL EXPERIENCE (3.7Years): United Bank Limited: United Bank Limited (UBL) is one of the largest commercial banks in Pakistan having more than 1,000 branches inside the country and 15 branches outside the country. Responsibilities:  I am working in UBL Network Data Center ( NDC) as a Electrical Engineer. Responsible for the Electrical System of NDC, Maintenance Operation and Troubleshooting(i.e. UPS, Line conditioner, Rectifier, Air-conditioning System, Generator, Fire Suppression and Fire Alarm System, Arrangement of Power connection of new server installation in NDC and Test Lab.  Operation, Maintenance & Troubleshooting Experience of 2x60 KVA Online Liebert Emerson Network Power Uninterruptible Power Supply (UPS) which is used for critical online servers. Installation, Operation and Erection Experience in Siemens Generator 300KVA for NDC and 1000KVA for UBL Head Office Building. Installation and Operation Experience in American Power Conversion (APC) UPS’s. which is used for UBL Test Lab Servers and for entire building critical applications. Can read UPS, generator, Electrical distribution of building power and control diagrams .Orient Energy System: Orient Energy Systems (OES) is authorized dealer of GE Jenbacher gas engines for Pakistan, GE Jenbacher is a part of GENERAL ELECTRIC USA. Responsibilities: I worked in Orient Energy System in Operation Dept. Operation and Maintenance Experience in Natural Gas Fuel Power Plant such as Jenbacher generating set with Stamford Alternator. Monitoring Dia.ne Xt system parameters of Jenbacher gas engine which is used for rapid problem solving.Dia.ne Xt system is the new GE Jenbacher management system.The system comprises powerful central industrial controls that handle master control and feed back control for the engine plant and visualization.Participated in Commissioning of 2 x JGS-320 1 Mega Watt Gas Engine each in Dawood Cotton Mill Ltd. Schedule/preventive maintenance of generating sets & auxiliaries of plants.Can Read Electrical Plans, Schematic Diagrams and Control Diagrams etc.Troubleshooting of electrical system of PLC based Power Plants.  Can Read PLC Diagram also. Al-Abid Silk Mills Ltd: Al-Abid is a leading manufacturer of Home Textile Products. The manufacturing processes are certified on ISO 9002 standards. Designation:Electrical Engineer of Maintenance Department.Reports To:Maintenance Manager. Responsibilities: I worked in Al-Abid Silk Mill Ltd in Maintenance Department. Troubleshooting of Textile Machineries there. Can read Electrical Diagrams. Experience in  Generating-Sets. Made in U.S.A. One Gas Generator 1.1 Megawatt and Two Diesel Generator (500/365) KVA .Rahman Industries (Pvt.) Limited:  Rahman Industries (Pvt.) Limited is the Textile Unit OF Pakistan. Designation:Electrical Engineer OF Maintenance Departments. .Reports To: Production Director. Responsibilities: I worked as a Electrical Engineer in Maintenance Department. Carried out daily/weekly/monthly/annual preventive maintenance as per maintenance  plan/Schedule   according to ISO-9001:2000 Standard. Schedule/preventive maintenance of Generating sets. ERECTION OF TEXTILE MACHINERY EXPERIENCE:Erection of BRUCKNER (Stenter), Made in West. Germany.Erection of Gaston County Dyeing Machine, Made in U.S.A. FINAL YEAR PROJECT:  ANALYSIS AND POST PROCESSING OF KARACHI MULTI EXCHANGE AREA NETWORK. This Project is about telephone traffic evaluation in different Exchanges (Based E-10, OCB283)  of ALCATEL PAKISTAN in Karachi. PROFESSIONAL REGISTRATION: Pakistan Engineering Council (PEC): Life Member of PEC, Registration NO: ELECT/18842.COMPUTER SKILLS: Microsoft Word, Microsoft Excel,Microsoft Office Outlook, Power Point, Internet, Email, Browsing. 

 PERSONAL:  Father’s Name :Saleem Akhtar N.I.C NO:42101-1526424-1  Date of Birth:13 January, 1980. Place of Birth:Karachi. .Domicile: Karachi. Marital Status: Single. Religion: Islam. REFERENCE:   Available On Request.    

                                                                        ……………….………………………

Electrical Engineer: SS003-08

 

AZFAR MAHMOOD    

Objective: Technology savvy, highly motivated electrical engineering graduate, willing to relocate with interest in project design, implementation and research. Strengths include good communication skills, attention to details and ability to work well within teams.

Personal Information: Father's Name: Mohammad Abu Mahmood Feroz Syed Date & Place of Birth:July 29th, 1984 in Karachi, Pakistan. Language Ability: English, Urdu. 

Educational Qualification:

Year

Qualifications

Institutions

1999

Matriculation

Saudi Arabian International School, Al-Khobar, Saudi Arabia

2001

Intermediate

Saudi Arabian International School, Al-Khobar, Saudi Arabia

2006

Bachelors of Science in Electrical Engineering (BE) from USA.

University of Houston, Houston, Texas, USA.
Graduation : December 2006

Professional Experience:  Circuit Analysis, Numerical Methods for Engineers, Applied Electromagnetism, Wave theory, Signals and Systems, Advanced Circuits and Systems, Three Phase Systems, Electronics, Digital Logic Design, Solid State Devices, Digital Electronics, Analog Electronics, Automatic Control Systems, State Space Control Systems, Data Communications and Internet Protocols, Telecommunications, Microwave Engineering,  Programming in C/C++, FORTRAN, Motorola Assembly language and Matlab, Thermodynamics, Engineering Statistics .Software developer and system analyst. specialized in data warehousing concepts. eteam, Inc. south plain field, new jersey. December 2006 - may 2007. Responsible for Requirements gathering, Data Quality Analysis and Business Analysis. Performed Logical and Physical Database design and developed the models. Worked closely with the Data Architect to assist in Physical Modeling and to develop schemas, data types, primary and foreign keys, default values, table spaces, hashing, partitioning, etc. Design and create mapping documents for extracts from systems of record to data warehouses and data hubs. Analyze relationships in Data models and demoralizing tables into third normal form to support extract files. Extensively used ETL Informatica Powercenter for the extraction, transformation and load of source databases. Worked with various active transformations in Informatica PowerCenter like Union, Filter Transformation, Aggregator Transformation, Joiner Transformation, Normalizer Transformation, Rank Transformation, Router Transformation, Sorter Transformation, Source Qualifier, and Update Strategy Transformation. Worked extensively with various Passive transformations in Informatica PowerCenter like Expression Transformation, Sequence Generator, Sorter Transformation, and Lookup Transformation. Extensively worked with both Connected and Un-Connected Lookups Extensively worked with aggregate functions like Avg, Min, Max, First, Last, Std Deviation in the Aggregator Transformation. Extensively made use of sorted input option for the performance tuning of aggregator transformation. Used Filter transformation at the early stages of the mapping for the performance tuning of the mapping. Extensively used SQL Override, Sorter, and Filter in the Source Qualifier Transformation. Extensively used Normal Join, Full Outer Join, Detail Outer Join, and master Outer Join in the Joiner Transformation. Responsible for the Data Cleansing of Source Data using Ltrim and Rtrim operations of the Expression Transformation. Also used Trillium 7.0 and its components Geo-Coder, Parser, Matcher and converter for cleansing the data. Extensively worked with Slowly Changing Dimensions Type1, Type2, and Type3 for Data Loads. Responsible for Error Handling using session logs, debugger, and tracing level Responsible for Performance tuning in Informatica Powercenter at the Target Level, Source level, Mapping Level, Session Level, and System Level. Extensively worked with Lookup Caches like Persistent Cache, Static Cache, Dynamic Cache, and Shared Cache. Developed Reusable Mapplets and Transformations for calculated business units. Developed Workflows containing different Tasks like Worklets, and Sessions Extensively worked with Database Triggers, Stored Procedure, and Procedures.   Worked hand in hand with the reporting team for the creation of Monthly/Quarterly/Yearly reports using Business Objects. Wrote UNIX shell scripts, SQL Statements and Stored Procedures (PL/SQL). Handled Unit and Regression testing of the mappings. Assisted in UAT Testing . Assisted in providing Production support and handling related issues. Tech. Support and Cataloging Specialist. M.D. Anderson Library, University of Houston :June 2005 – December 2006 Operated the Computer Lab/Library, Media Services and Helpdesk for students, faculty and Administrative staff and senior management Assisted the Library Circulation, Reserve Material and Reference materials Maintained database of the processed book in the library Classified different inventory as Innopac and OCLC  based on the tracking system provided .Electrical Engineering intern. .Jones and carter, Houston, TX .may 2004 – august 2004 Appointed as ‘Lead Intern’ to facilitate interaction between all interns in the program with various departments Applied basic circuit knowledge into practical use to solve problems and to calibrate some delicate instruments Supplied electro-mechanical parts to the industry, as needed Applied the fundamental concepts of Electrostatics and Thermodynamics Customer Service Rep and Cashier. University of Houston bookstore, Houston, tx .July 2003 – october 2003 Managed the inventory for the bookstore/Worked in customer service department/Managed cash for the shift Student Course-Work Projects Spring 2003- December 2006 Used C, C++ and Fortran and Matlab for several problem solving projects throughout the semester Applied basic numerical techniques for the completion of assigned projects
Recognized the importance of error estimates Designed a Bandpass/Bandstop Filter using Matlab, and circuit components  Implemented a program in Matlab to determine the voltages and currents in a complex network
•Designed and assembled a four way traffic light signal using flip-flops and circuit components
Designed and simulated Blood Transportation System along with Data acquisition using LabVIEW Designed various electronics and circuit layouts using CALP and simulated in Winspice software Researched and analyzed various waveforms and frequency spectrums using EMONA/TIMS .301c System Unit.

HonorS: Houston Community College (Honor Roll) Spring 2002-Fall 2003 Obtained First Position on National Scientific Model Making Contest held on 2001.Membership :Institute of Electrical and Electronics Engineering (IEEE). – Executive Officer of the local chapter for three years .

Computer/IT skills :Knowledgeable in programming, database and networking technologies In depth, hands on experience in the following: Operating Systems : UNIX, DOS, Windows NT, LINUX, Virtual Machines .Programming Languages : MATLAB, C, C++, FORTRAN, LabVIEW, Calps,Cadence, Winspice, MS SQL Server, Toad, BTEQ .Relational Databases : Oracle, Teradata, Sybase, MS SQL Server, DB2 .Application Softwares : Simuaid, Logicaid, MATLAB, MS Office, Autosys, Control M, Maestro, Erwin 4.5, Business Objects 6.5 and xi, Cognos, Informatica, Trillium, First Logic.Others:  Telnet, File Transfer Protocol .Microsoft office suite, including Word, Excel, PowerPoint, and Access .Other:Valid Driving License of  Texas, USA .References: Available on request.

                                                                              ……………….………………………

Electrical Engineer: SS004-08

FAWAD SARWAR SHAIKH

Academic Education: Intermediate from Public School, Hyderabad, in the year 1993, secured (79.9% marks). Matriculation from St. Bonaventure's high School, Hyderabad, in the year 1991, secured (81.11% marks). Bachelor of Electrical Engineering in the year 2000, from Mehran University of Engineering and Technology, secured (FIRST DIVISION 75.67% marks)

Computer Skills: 2 Years Diploma in Computer Science from FAITH College of IT, Hyderabad, obtained "A" Grade. CCNA 2.0 from EAST WEST UNIVERSITY, CHICAGO (KARACHI CAMPUS) in August 2002. AUTOCAD and good knowledge of HVAC , SAP (Version 4.8) – (Module: Plant Maintenance) - attain on Job training. (4th June – 8th June, 2007) Technical Experience:  30th OCT 2002 – Till Present:KARACHI ELECTRIC SUPPLY CORPORATION : Working for Karachi Electric Supply Corporation in the capacity of "Assistant Manager" in Engineering (Project Implementation) Department. Key responsibilities are to monitor and ensure the smooth execution of different projects as a team leader which included: Installation of Bus-bar (housed in a chamber box), Energy meters, Circuit Breakers and Rehabilitation of wiring in Multistory Buildings in KARACHI. (Current project) .Installation of C.T operated meters, CT Operated GPRS meters and L.T. breakers on Pole Mounted Transformers. Installation of Capacitors on L .T and H.T on primary and secondary distribution system to reduce distribution  losses Installation of Earth Fault Indicator and Knife Switches on H.T cables in order to reduce the clearing time of fault .Inspection of material used by K .E. S. C  (Such as Transformers, LT Cable, Bus-bars, Capacitors, Energy Meters, Insulators etc)  in different projects. (As per IEC and British standards). General Administration: to administer a team of Sub-engineer/s,  Supervisors and other staff  engage in the project. Check their punctuality, attendance and place them in an appropriate way to obtain  maximum output. 12th DEC 2000 – 31st AUG 2002:   PEARL CONTINENTAL HOTEL (KARACHI AIRPORT) Worked for Pearl     Continental Hotel Karachi’s Airport Operations as a Human Resource Officer and then promoted to “Assistant Personnel Manager”. Reasons for Leaving: Company’s Airport Operations suspended. Personal Details: Father's Name: (Late) Ghulam Sarwar Sheikh . Mother's Maiden Name:Dilshad Sheikh   Marital Status: Married . Nationality: PAKISTAN . Passport Number: BM 5194971 Date of Availability (In-case of selection):  One Month.

                                                                       ……………….………………………

Electrical Engineer: SS005-08

MUHAMMAD USMAN MAHMOOD

EDUCATION :Bachelor of Science in Electrical Engineering From University of Engineering and Technology Taxila .Graduation:Sept 2001.Specialization: Communications

EXPERIENCE: National Telecommunication Corporation ( NTC ) Assistant Divisional Engineer(NGN)    May 2005-August 2007  (still on job) Next Generation Network(NGN)My Duties include: Operation and Maintenance of Huawei Softswitch (SoftX 3000) which includes activities like Creation and administration of number prefixes (codes) Creation and administration of Trunk Groups Creation and administration of charging/zoning Creation of Signaling Links which includes C7 Links,M2UA & M3UA Links Administration of CDRs[call detail records Monitoring of traffic on the Trunk Groups and carrying out traffic analysis for capacity planning based on the traffic ERLANGS. Creation of subscribers and configuring different services as per the requirement of  subscribers Troubleshooting of problems related to speech and signaling Operation and Maintenance of Huawei Universal Media Gateways (UMG 8900) which includes Administration of E1s terminating on UMG Administration of trunks Operation and Maintenance of Huawei Signalling Gateway (SG 7000) which includes Creation of signaling links ie C7 Links,M3UA Links Maintenance of Electric Power arrangement for the NGN setup which includes Operation and Maintenanace of rectifier Operation and Maintenance of batteries Operation and Maintenance of Huawei NMS( I Manager2000) from which the whole network can be administered Furthermore I performed the provisional acceptance testing (PAT) of the of SoftX 3000, UMG 8900 and SG 7000. have foreign training on NGN from Huawei Institute in Shenzhen China. I also happened to conduct pre-installation surveys of sites for NGN  to Determine the electric power requirements based on equipment load Determine the capacity of generator required based on load Capacity of battery banks require Asst Divisional Engineer (TAC)(Sept 2004-May 2005 )INTERCONNECT EXPOSURE As Asst Divisional Engineer (TAC) I prepared interconnect agreements with mobile operators, local loops and LDI’s. Negotiated the services(origination,termination,transit,leasing of domestic private leased circuits,provisioning of collocations etc etc) with different operators based on the interconnect agreement and arranged for the implementation of the same. Negotiated the billing and settlement procedures with the operators SIEMENS EWSD EXCHANGE EXPOSURE Looked after the operations of Siemens EWSD exchanges and administered 13 EWSD Exchanges from EWSD Net Manager (Network Management System).O&M activities included Creation/Administration of number prefixes & Trunkgroups Monitoring of traffic on the Trunk Groups and carrying out traffic analysis for capacity planning based on the traffic ERLANGS. Creation/Administration of Signaling Links Creation/Administration of charging Administration of CDRs[call detail recordsTroubleshooting of problems related to speech and signaling. Dancom Pakistan Pvt Ltd:Senior systems Engineer (May 2003-Sept 2004 )Looked after the Dancom DSL(Digital Subscriber Line) operations. Worked on IP DSLAM’s and Cisco IP Routers. Prepared NGN RFP being a member of NGN design team. Sysnet Pakistan Pvt Ltd.Network Engineer (Nov 2001-May 2003 )Installed Wide Area Network (WAN) for HBL to interconnect their ATM Machines throughout Pakistan. During the course, I happened to work on the Cisco equipment like Cisco 1751 Routers, Cisco 2600 Routers, Cisco 3600 Routers.The WAN consisted of diverse transmission mediums like Digital Access Cross Connect, Leased Lines and Wireless. COURSES / TRAININGS: NGN Operations Training from Training Center Huawei Technologies Shenzhen China Traffic Fundamentals and Forecasting from Institute of Communication Technologies Islamabad Pakistan A short course on NGN from Telecom Staff College Haripur Pakistan Siemens Net Manager Training.PROFESSIONAL ASSOCIATIONS: I happened to be a member of Institute of Electrical and Electronic Engineers(IEEE) from 1997-2000.

                                                                                 ……………….………………………

Electrical Engineer: SS006-08

MUHAMMAD SUBHAN SOLANGI (MATERIAL AND PROJECT ENGINEER)

  JOB EXPERIENCE WITH JAL INTERNATIONAL KSA : (JUNE 2006 TO JUNE 2007) WORKED AS MATERIAL ENGINEER at SAUDI IRON AND STEEL COMPANY (HADEED) JUBAIL INDUSTRIAL CITY KINGDOM OF SAUDI ARABIA. Responsibilities: Handling the all material including unloading at store yard and loading for site. Coordination with Owner and user store staff. Keeping all the records of incoming and issuing material. Making the shortcoming list of materials and inform to management on time. (DEC 2005 TO JUNE 2006) WORKED AS MATERIAL ENGINEER AT GULF FARABI PETROCHEMICAL PLANT AT JABAIL KINGDOM OF SAUDI ARABIA. Responsibilities: Handling the all material including unloading at store yard and loading for site. Coordination with Owner and user store staff. Keeping all the records of incoming and issuing material. Making the shortcoming list of materials and inform to management on time. Making MTO from the drawings. JOB EXPERIENCE WITH KARACHI ELECTRIC SUPPLY CORPORATION LTD: (NOV 2004 TO DEC 2005) Worked as Assistant Executive Engineer with KARACHI ELECTRIC SUPPLY CORPORATION at (DID) –III at State Life Building Abdullah Haroon Road Karachi. Responsibilities: Over all Under Ground Cable Laying in charge of 11KV Feeders in the different areas of the City in D-II. Coordination with other area Engineers. Cable termination, jointing and installation of RMU (Ring man units) of 11KV. JOB  EXPERIENCE  WITH  TECHNO  ENGINEERING  SERVICES   (PVT)  LTD: (SEP 2003 TO OCT 2004) Worked as Electrical Engineer (Cathodic Protection Engineer) at white oil pipeline project (WOPP) at section III & IV Shikarpur to Mehmood kot. (A PROJECT OF PARCO). Responsibilities: Over all in charge of temporary cathodic protection of pipeline and also permanent cathodic protection of pipeline. Installation of Solar Panels & rectifiers in the remote areas. Additional charge of all CP materials store to control the minimum wastage at site.  

JOB  EXPERIENCE  WITH  VAROW  INTERNATIONAL  PAKISTAN:  (AUG 2002 TO JUL 2003) Worked as Project Engineer at SAWAN GAS FIELD DEVELOPMENT PROJECT (A PROJECT OF OMV PAKISTAN) Responsibilities: INCHARGE, MANAGER ALL ACTIVITIES AND MONITORING FOR FOLLOWING DISCIPLINRS. Installation of Sub-Station with Transformers and Switchgears (3.3 KV/440V ) Erection of Perimeter Lighting, Street Lighting, Building Lighting Cricket Ground Lighting. Installation of P.A & FNG System Installation of BDs inside & outside Building (JAN 2002 TO JUL 2002) Worked in Head office responsible for MTO, BOQ, & Procurement for different Projects of the companies running in Pakistan. JOB  EXPERIENCE  WITH  DESCON  ENGINEERING  LIMITED: (APR 2001 TO DEC 2001) Worked as Electrical Engineer at OMV PAKISTAN EPC PROJECT at KADANWARI GAS FIELD. Responsibilities:   Cathodic Protections of pipe Lines. Erection of all kinds MCCs Control Panels inside Sub-Station & out side in Process area. Cable Routing, Cable laying & Earthing of the whole Plant. Lighting system of the Plant. Installation of the field instrumentation. (OCT 2000 TO MAR 2001 ) Worked as Electrical Engineer at BOUROGE PETROCHEMICAL PLANT & MARINE HANDLING FACILITY AT RUWAIS, ABU DHABI (U.A.E.) Responsibilities: Cable Routing, Cable laying & Earthing of the whole Plant. Lighting system of the Plant Installation of P.A & FNG System .Installation of 25 meter high (6x1000W) Lighting Tower Masts. Installation of transformers & sub station Panels 33KV/6KV & 6KV/440V. (MAY 2000 TO SEP 2000) Worked as Electrical Engineer at PTC PLANT (UPGRADING) AKORA KHATAK. Responsibility: Responsible for over all activities as In charge of the project. (APR 1999 TO JAN 2000) Worked as Electrical Engineer with DESCON & SBG Joint Venture in JUBAIL PETROCHEMICAL COMPANY AT JUBAIL (KSA). Responsibilities: Cable Routing, Cable laying & Earthing of the whole Plant ,Erection of all kinds MCCs Control Panels inside Sub-Station & out side in Process area. ,Meggaring, Testing & Commissioning of all electrical equipments. Installation of lighting system in the Plant Cathodic Protections of the concrete Structure of Sea water intake & Outlet structure. (OCT 1998 TO APR 1999) Worked as Electrical Engineer at ATTOCK OIL REFINERY LTD MORGAH, RAWALPINDI AT HEAVY CRUDE OIL DEPARTMENT. Responsibilities: Erection of all kinds MCCs Control Panels inside Sub-Station & out side in Process area Cable Routing, Cable laying & Earthing of the whole Plant Meggaring, Testing & Commissioning of all electrical equipments. Installation of lighting system in the Plant. (APR 1998 TO SEP 1998.) Worked as Electrical Engineer at FAUJI JORDEN FERTILIZER COMPLEX BIN QASIM KARACHI. Responsibilities: Erection of all kinds MCCs Control Panels inside DAP Sub-Station & out side in Process area ,Cable Routing (Including fabrication of cable tray &conduit installation), Cable laying & Earthing of the whole Plant ,Meggaring, Testing & Commissioning of all electrical equipments. Installation of lighting system in the DAP Plant area. Cathodic Protection of the pipelines. (JUN 1997 TO APR 19980) Worked as Electrical Engineer at 727 MW AES LAL PIR THERMAL POWER PLANT. Responsibilities: Cable Routing (Including fabrication of cable tray &conduit installation), Cable laying & Earthing of the FGD Plant Area. Installation with commissioning of all MCCs & control Panels of LIMESTONE HANDLING SYSTEM. Installation of lighting system in the LIMESTONE HANDLING Plant area. Maintenance & Operation of the LIMESTONE HANDLING Plant area. Know how about Win word & Excel programme on Computer. (SEP 1996 TO MAY 1997) Worked as Electrical Engineer at 3000 TPD FAUJI CEMENT PLANT JHANG BAHATER. Responsibilities: Erection of all kinds MCCs Control Panels inside Sub-Station & out side in Process area Cable Routing, Cable laying & Earthing of the whole Plant Meggaring, Testing, initial operation & Commissioning of all electrical equipments. Installation of lighting system in the Plant. Installation of 132 KV grids Station with 20 MVA transformers. (JUN 1995 TO AUG 1996) Worked as Electrical Engineer at 3000 TPD LUCKY CEMENT PLANT PEZU. Responsibilities: Installation & commissioning of all Electrical rooms / sub stations. Installation & testing of all Low Voltage Transformers. Installation of lighting & lightening system at Plant. Earthing of the whole plant equipments Cable laying of the plant Cable routing with cable trays and conduits. (JAN 1994 TO JUN 1995) Worked as Assistant Electrical Engineer at QADIR PUR GAS FIELD near GHOTKI. Responsibilities: Erection of outfield equipments. Earthing of the whole plant equipments. Installation of PA & Fire Alarm System. Cathodic Protection of the pipelines. Primary commissioning of the Plant . SAFTY AWARDS AND APPRECIATIONS: Awarded by CLOUGH ENGINEERING LTD AT SAWANGAS FIELD. Awarded by SNC LAVILAN LTD AT N-PARAFIN PLANT AT JUBAIL. Awarded by JAL INTERNATIONAL JUBAIL. COMPUTER SKILLS. MICROSOFT OFFICE WORK. PERSONAL INFORMATION :   FATHER’S NAME:                         MUHAMMAD YOUSIF SOLANGI DATE OF BIRTH:Dec 01, 1967 LANGUAGE:URDU, ENGLISH, SINDHI, PUNJABI & SERAIKI N.I.C:45101-0632839-7 PAKISTANI P.E.C.No:ELECTRICAL/8701(LIFE TIME MEMBER) PASSPORT No:AA5708391 QUALIFICATION:B.E (ELECTRICAL) EXPERIENCE: - 12 Years. ACADEMIC QUALIFICATION :

INSTITUTE                EXAMS:                                      PASSING YEAR      DIVISION

GPHS DAHARKI    SECONDARY SCHOOL                     1982                        1ST

GDC GHOTKI             HIGHER SEC.SCHOOL                 1984                        1ST

MUET JAMSHORO    B.E ELECTRICAL                            1990                        1ST  

                                                                                ……………….………………………

Electrical Engineer: SS007-08

 

MUHAMMAD ATHAR (Senior  Resident  Engineer (Electrical)  

National Bank Of Pakistan Engineering (Department  Head Office Karachi)

 ACADEMIC DATA: Master  in  Engineering :

  Place:NED University of  Engineering & Technology ( Main  Campus ) Karachi.                                      

Field:ELECTRICAL  ENGINERING

CGPA: 2.91 Duration: August 1997   to   December 2000

Bachelor  of  Engineering:

Place:NED University of Engineering and Technology, Karachi( Main  Campus )

Field: Electrical Engineering Grade:FIRST  DIVISION ( Securing 90.7 % marks in the Final Year ) Duration:1984-1989

Project: Electrification of Bolan Casting ( an industrial unit ) at Hub, Baluchistan.

Higher School Certificate: College: Govt Science College, Malir Cantt, Karachi

Field:Pre – Engineering Group Grade: FIRST DIVISION   ( 69.8 % ) 1982 - 83

Secondary   School Certifcate School:Govt High School, Military Farms HQ, Okara , Pakistan

Field:Science Group Grade:‘A’ Grade( 74. 8 % ) DIPOMA IN BANKING  ( Part – I & II ):

Period:August  1998  To  July 2001

Institution: Institute of Bankers in Pakistan ( IBP ) Subjects: Economics , Monetary Theory , Foreign  Trade & Foreign Exchange Higher  Accountancy , Banking  Law  &  Practice , Commercial  Law .ENGLISH  PROFICIENCY: ELTS:  Band : 7 Speaking=9 , Writing=7 , Listening=6 , Reading=6       Test Date: 23-10-2003 TOEFL: Score: 597 Test Date: April-1995   WORK EXPERIENCE: NATONAL  BANK  OF  PAKISTAN .1996  ONWARD ( Current  Employer ) : Engineering Department , Operations Group , National Bank of Pakistan. Designation / Postion : I have been working since Sep-96 onward as Resident Engineer ( Electrical ) after my selection through Pakistan Banking & Finance Services Commission. I was promoted as Senior Resident Engineer ( Electrical )  w.e.f  1-12-2002. Duties / Job Description : PROJECT   PLANNING  &  MANAGEMENT . Designing/Review of Design and planning for Electrical projects of high rise commercial buildings of the National Bank of Pakistan all over the country including .Power Distribution , Load Calculations ,Standby Power Generators , Lifts / Elevators,Fire Detection, Alarm & Suppression , Data Cabling , Un-interruptible Power Supplies Systems ,Procurement of Engineering Equipment/Material , Coordination witl Security Department , Preparing Feasibility , Load Assessment and Cost Estimation of all the electrification projects undertaken by National Bank of Pakistan throughout the country. Pre-qualification and preparation of tenders and contract documents.   Presentation of the design, plan and budget of the project and the submission of reports to the top management for obtaining financial sanctions and to arrange execution of the project within budgetary allocations. Direct supervision of project sites located in Karachi and helping the Regional Head Quarter’s of Bank for sites located outside Karachi  including intermittent visits of site as and when required. Coordination with consultants and contractors for complete supervision and progress of all on-going projects. Review of project plans and scrutiny of contract agreements. Checking and verification of the bills of the contractors and consultants (if any).  Procurement of  Engineering works / projects as per Government policy under Public Procurement Rules  PPRA-2004. Preparation of electrical drawings using AutoCAD. Use of  MS Project & MS Office for managing different phases of a project. Coordination with Government Departments like SSGC, KESC, and CDGK etc.     IMPERIAL  CONSTRUCTION  COMPANY: ( 1990 – 1996 ): From Dec 1990 to Sep1996 I served in the Imperial Construction Co. ( ICC ) as Assistant Divisional Engineer located at 202, Faiyaz Centre, Main Shahra-e-Faisal,Karachi. Duties / Job Description : I worked on various Power Transmission Lines and Distribution Projects of Karachi Electric Supply Corporation ( KESC ) in various parts of Karachi and around including projects funded by the Asian Development Bank (ADB) and Lehmyer (Germany) were the consultant. The name of the projects I worked on are 5th Power Sector Loan Project, 6th unit power transmission line project, T/009 and T/006 Projects. Professional Courses and Trainings:   Advance  project  management(2006  -2006 ) NED University of  Engineering & Technology, Karachi. . Certificate Course in   PLC  Automation (2001-2001)   Institute of Automation & Computer Solution, Karachi. AUTOCAD 2000: (2003-2003) Technoman Institute of Computer Science & Engineering , Karachi GENERATOR PERFORMANCE EVALUATION Date : 24th April 2003 Conducted by:M/s  Wartsila  Pakistan FIRE SAFETY COURSE (2002- 2002)   National Institute of Fire Technology, Islamabad ( NIFT ) COMPUTER  SKILLS. AUTOCAD 2000,MS PROJECT ,MS EXCEL          INTERNET ,MS WORD,MS POWER POINT,VISUAL BASIC 6.0 PERSONAL DATA: Date of Birth:  23-08-1965 , Marital Status:Married ,Citizenship: Pakistan ,Driving License:Yes .

                                                                                   ……………….………………………

Electrical Engineer: SS008-08

MAJID ALI BHATTI

  OBJECTIVE:To work for a multinational organization, where I can utilize my competencies in key areas of process improvement & can interact with executive management and clients.SUMMAR Y: Senior technology professional with more than 16 years of working experience combining broad based technology, leadership, vision, business acumen and management expertise in developing and implementing company-wide short and long-term technology solutions to support and meet the continually evolving power systems requirements of an organization. PERSONAL: Father’s Name: Abdul Slam Bhatti. Date of Birth: 06-06-1964 N. I. C.#:42501-1448685-3. EDUCATION: 1.Bachelors of Engineering in Electrical Technology from NED University Karachi in 1990. 2. Diploma of Associate Engineering from Pak Swedish Inst: in 1986 (Landhi Karachi). 3.Competency Certificate of Electrical Supervisor from the govt: of sindh in 1993 (Karachi). COMPUTER SKILL: Windows 95 / 98 / XP & Windows N T. Command on Internet. M. S. Word. M. S. Excel. EXPERIENCE: (Deputy Manager Electrical) - Dadabhoy Cement Industries Limited -Feb:2004 -To date Description: To represent DGM (E) regarding the matters related to ISO-9001-2000 in his absence. To get the process, master and other instruments, identified, calibrated, recorded and properly tagged with in scheduled period .To plan maintain and monitor preventive and shut down maintenance schedule of electrical department and keep the proper record duly verified in time. Bring any issue to the management attention of equipment reliability and its upgrade. To organize duties and working schedules for the Electrical Department. Take pro-active actions if any trouble noticed during operation of equipments. Troubleshooting of plant machinery, maintenance and installation of LT/HT panels, power factor panels, designing and assembling of control and power panels, troubleshooting of AC/ DC / HT motors, slip rings/squirrel cadge induction motors, Overhead Transmission line. Repair & Maintenance of different kinds of Circuit Breakers & Switchgears like SF6, OCBs, ACBs, & VCBs. Inspection and maintenance of High Voltage Electrostatic Precipitators (E.P) Pneumatic Controls, Silo Level / Gauges & etc. Environment / Plant & Machinery: Wartsilla Generators (04 Nos 3.6 mw of 6.3 kv) ,Plant Consuming Load (8.8 mw) ,High Tension Motors (2300 kw, 1500 kw, 910 kw etc.) ,Boge Compressors (Screw Type) ,Weigh Feeders (Hesler ) ,Data Acquisition System. (Speedy Automation), Roto Packer (Haver), E . P (Electro Precipitator) , Dust Collectors etc. (Electrical Engineer) National Tiles & Ceramics Limited July 1993 – Feb 2004. Description:  Department in charge of three supervisor, six technician and three assistants, Where the core responsibility of the department is troubleshooting of plant machinery, maintenance and installation of Generators, LT/HT panels, power factor panels, Designing / Assembling of control and power panels. Troubleshooting of AC/ DC motors, Rectification of BURNER panels, maintenance and repairing of compressors, Pneumatic Controls, Silo Levels / Gauges and indications & etc.Environment / Plant & Machinery:   Rolls Royals Generator.:Tunnel Kilns (Hiemsouth). Shaping Handling / Extruder Machine (Grmy):PLCs  (Siemens S/5). Cummins Generators. CAT Generators. AGROB & KELLER (Germany) Plants. IWATTA, INGERSOL RAND (Compressors (Electrical Foreman). Saudi Ceramics Company Limited: Nov 1990 – May 1993. Description:  Worked as a Shift in charge of the Electrical Maintenance department. Where the core responsibility of trouble shooting of plant machineries, Maintenance & overhauling of motors. Designing / assembling of control and power panels. Troubleshooting of AC/ DC motors, Rectification of BURNER panels, maintenance and repairing of compressors, Pneumatic Controls, Silo Levels / Gauges etc.Environment / Plant & Machinery:Tunnel Kiln (Red Hammer, Heim South):Sacmi Press Machine,Crushing Plant :Loading /Unloading Machine,Ball Mills:LAB Equipments. Carmatic Machine :Photo Cells,Intermac Machine:Water Boosting Plant,Hydraulic Machine:LT / HT & Control Panels. Boiler (Bauher).Other Major Projects: Installation, Testing and commissioning of project in SARELA CEMENT LTD  (SIEMENS) Quetta.   Installation, Testing and commissioning of project in MILK PLANT (SIEMENS).Quetta.   Installation and Commissioning of ANWARZAIB WHITE CEMENT Project, (A. E. G.).Bholari Kotri. Installation and Commissioning of HUBCO POWER PLANT (One Turbine of 323 MW).

                                                                     ……………….………………………

Electrical Engineer: SS009-08

S.G.IMAM              

Education:  Bachelor Engineering  (B.E Elect.). NED Engineering University.

 Bachelor of Engineering degree achieved first class standing and accepted by CanadianCouncil of Professional Engineer (CCPE). Bachelor of engineering degree evaluated by University of Toronto as equivalent to Canadian Engineering degree. Training and Skills: One year job training program in petrochemical industry. (National Refinery Ltd.), Attended course” Management training for engineers” NIPA. , Certificate course in Autocad from George Brown College Toronto. 2001,Proficient in computer based program related to my field and knowledge of MS word and Networking Essentials. Professional Association: EIT (Professional Engineer Ontario.) Member Society of American Military Engineers. (SAME) Member of Pakistan Engineering Council. Member Institute Of Engineers Pakistan. Experience: (2001 t0 Date) Alpeza General Contracting, Mississauga, Ontario. Canada. (Project Electrical Engineer)   Currently working with Alpeza General Contracting involved in various on going projects of city of Toronto, housing complex and high rise building projects. Responsibilities include supervision of the electrical power distribution system comprising of medium voltage substation, h .v and l .v switch gear associated control system. Electrification of the high rise building. Supervised several electrical work crews, which installed many-advanced electrical system- Fire Alarm, air conditioning controls, public address and lightning protection system.  Review and prepared shop and design drawing for the various electrical system. Prepare coordination drawing to cope with other utilities. Liaison with the design consultant and client and act as primary contact of the company.(1999 to 2000) ATC- Limited      RIYADH. (Project Electrical Engineer) Worked as electrical engineer supervised, installation , testing , commissioning of medium voltage power distribution system comprising of m.v and l.v switch gear and associated controls. Installation of electrical motors and motor controls system in pump houses. Street and walkway ligting system. Supervised highrise building,sports and housing complexes electrification, Fire Alarm, public address system  and ably motivated several electrical crews to work in a team spirit to meet the targets. Preparation of shop and coordination drawings. Material take off , tendering work for the various  projects.(1983 to 1990)A.H- ADA   Limited    KHOBAR (Electrical Engineer) Electrical Engineer without the construction contractor Al – Husseini ADA        (Saudi Arabia) Ltd., at King Khalid Military City $ 240 Million Family Housing project in north-eastern Saudi Arabia. Successfully performed supervision, installation, testing and commissioning of Electrical power distribution system comprising of power transformers, switch gears, motor controls and motor control centres, pump houses, cathodic protection, Lightning protection, Fire Alarm and Public Address system. Electrification of family housing units and all external cable laying, jointing, termination, street and walk way lighting work. (1976 to 1982) NCC  Limited.   PAK. (Electrical Engineer) Electrical Project Engineer to supervision, installation, testing and commissioning of ZARQA REFINERY EXPANSION PROJECT JORDAN, electrical power distribution system comprising of m.v and l.v substation and associated switch gear and controls, Electrification of the process unit, external utilities, conical and spherical storage tanks, vessels, columns, furnaces for installation of explosion proof fixture, fittings and gub boxes. Motors and motor control center in pump houses, cathodic protection of pipe lines. Worked at NATIONAL REFINERY EXPANSION PROJECT ( KARACHI ). As a electrical engineer to supervision, installation, testing and commissioning of all electrical m .v and l .v system, sub stations, explosion proof lighting, MCC panels adamantly adhered to the fuel oil refinery in the process unit, external utilities, storage tanks, pump houses, LPG vessels, furnace and vertical columns and flare. Also supervised some of the related instrumentation work of process unit by installing flow and pressure transmitters, pressure gauges, level instruments, air regulators, thermometers, orifice plates, thermocouples, tank level indicators, solenoid valves, control valves, copper tubing and air supply piping.

                                                                      ……………….………………………

Electrical Engineer: SS010-08

TALAT MAHOOD

Personal Information:

Name

Talat  Mahmood

Present Employer

Syed  Bhais (Pvt.) Ltd.

Division

Product Engineering Department

Present Post held

Product Engineer

Total Work Experience

5 Years.

Major Experience Area

Technical Support to Production and Customer and Testing of Electronic Meter

 Academic Information :

Bachelor’s

Subject

Year of passing

Division

Institution

Electrical Engineering (Electronics & Communication)

2002

First Class

University of Engineering & Technology, Lahore, Pakistan.

Intermediate

Subjects

Year of passing

Grade

College

Pre- Engineering

1997

A

Government College, Lahore, Pakistan.

Matriculation

Subjects

Year of passing

Grade

School

Distinction

Science

1995

A+

Pakistan railway High School

Scholarship

 Experience Summary: (Oct 2005 – To Date) Syed Bhai’s Pvt. Ltd.  Lahore Pakistan .(Product Engineer)  Product Introduction:Our group has developed a high class Digital Electronic Meter that is compliant to international meter testing standard (IEC). We have developed a GSM Based Metering Solution and we are also working over Grid Station Metering, Monitoring & Control Unit. Responsibilities Towards Product: Study of newly designed product before coming that to production as per respected IEC and customer specifications. Technical Solutions of problems regarding product during production. Technical Support to Production and Customer (WAPDA, KESC) regarding the product. Recommendations for changes in design if required as per specifications. Compilation and issuance of Engineering Instructions to Production department during production. Designing of equipments used in production (Testing Platforms, Phantom loads) Trouble shooting of Electrical and Electronic Equipments used in production.(3 phase supply sources, Phantom loads). Testing Responsibilities: Testing of Three Phase Vector Energy Meter DSP Engine and Control Division. The meter is approved from WAPDA (Electricity Authority in Pakistan) Design Department. The latest version of the Meter also includes the GSM Compatibility and sends and receives metering information and programmable parameters through GSM Link. The ZigBee based RF Enabled meter is under the process of testing. I have the responsibility of testing of Electronic meters like EMC tests (containing Surge, EFT, ESD, Conducted and Radiated Disturbance, Damped Oscillatory test), Environmental conditions tests, Accuracy tests.(June 2003 to Oct 2005)Water And Power Development Authority Pakistan(WAPDA) (Assistant Director Transmission Lines Design) .Responsibilities. My responsibilities in WAPDA were to Design 220/132 kV T/Lines. The designing process included Technical route approval of T/Line, Route Survey (if required), Material allocation for approved T/Line, Material Procurement for different projects, Tenders Evaluation against different T/Line projects, Technical Communication with Contractor (if involved ), Material Testing as per WAPDA as well as IEC specifications and preparation of new Specifications based upon IEC as well as ANSI specifications. Courses During WAPDA Job:  I also have attended a short course in NUST for 3 months on GIS (Geographical Information System) from IGIS, NUST Islamabad. That was for a project of topographical survey of Indus Valley for a 765KV transmission line from Bhasha to Mansehra. In that course I worked on tools like ARC GIS, Arc View, ARDAS on Bird View Images taken from satellite.And also during that short course, i did a project of Digitization of F-10 map and current situation of WAPDA power distribution system in F-10 subdivision. (July 2002 to June 2003)Cyber Access, a project by ORIX Leasing. (Network Engineer).Responsibilities : Management of Access Server of the System, which gives access to different Bank’s Data Base for their Credit card and Debit Card Access.

                                                                        ……………….………………………

Electrical Engineer: SS011-08

Engr. SAYED  SHAHID HUSSAIN SHAH

OBJECTIVE: Looking for a dynamic position in a fast growing organization to enhance my professional capabilities, and to serve with best of my abilities. PERSONAL : Fathers Name:Sayed Fayaz Hussain Shah. N.I.C. NO:41201-2096184-1(Pakistani) Date of Birth:31-08-1976 Domicile: Dadu (Rural) Material Status:Unmarried Educational Qualification: 2001:B.E Electrical from  M.U.E.T Jamshoro in first division(74.5%) 3-Year Diploma in Electrical Engineer Govt: poly Technic Institute Dadu in First class first division. (86.0%) Matirc (Science) from Govt: High School Phulji Station in Grade ‘A’ .Experiences: (2001-2002)Sapphire Energy Limited(Trainee Electrical Engineer) HESCO (WAPDA)Hyderabad Electrical Supply Company.Assistant Manager (Electrical)15th July 2002 up-to date. RESPONSIBILITIES: Maintenance of Switch Gears, it includes Circuit Breakers, Switches, Fuses, Isolators and Relays. Put in place strategies to improve the availability/ reliability of the electrical system.Support the operation Department by implementing modification to the exiting electrical system including recommendations for design and installation of new equipment.To ensure that the electrical system and associated equipments are managed safely and efficiently. Installation and maintenance of transformers.Operation and maintenance of 11 KV distribution systems.  Operation of protecting/ safety devices troubleshooting and maintenance of distribution system. To ensure that the maintenance policy is managed in accordance with WAPDA safety policy.Suggest and plan activities to manage the technical staff when carrying out maintenance and engineering change.Conducting weekly progress review meeting with engineers, Sub-Contractors, Client Representatives and other parties involved in the Operation System. Preparing Schedule & implementing strictly with coordination of all the technical staff and professionals.Assisting the Electrical Manager, to provide technical support to the electrical crew for the project. Making activity schedule & records of the workers with their respective jobs & activities. Technical Courses:T-500, C-500 & S.w-200 From R.T.C HESCO Jamshoro.Computer Skills: Internet browsing,Ms-Office 2000 / 2003, Electronic work Bench and circuit Maker.Language Proficiency: English (Written & Spoken), Urdu and  Sindhi.

   ……………….………………………

Other CV,s are under processes

 


Work To Do