|
Mechanical Engineers
Mechanical
Engineer –SS001-08
Personal Bio- Data
NAME
|
JANNAT GUL KHAN KHATTAK
|
|
FATHER’S NAME
/ MOTHER'S MAIDEN
NAME
|
MIAN
GUL KHAN KHATTAK
/ NAIK-A-AMALA
|
|
N.I.C #
|
138-55-212545
|
|
DATE OF BIRTH
|
12-04-1955
|
|
RELIGON
|
ISLAM
|
MARITAL STATUS
|
MARRIED,HAVING FOUR
CHILDERN
|
|
NATIONALITY
|
PAKISTANI
|
PROFESSIONAL QUALIFICATION: B.Sc.
B.E (Mechanical Engineering) Graduated in January1978 with first division from
University of Engineering and Technology Peshawar, Pakistan.
(Member Pakistan
Engineering Council Registration
# 73–Engg.Mech-2190):COMPUTER
LITERACY:
Good Command On
Microsoft Word & Microsoft Excel. FoxPro. LANGUAGES PROFICIENCY:Can read, write
and speak English, Russian, Arabic, Urdu, Hindi & Afghani
. I have a
total of 25 yeas experience
in the field of Mechanical Engineering. Have
worked on various construction projects like Pakistan Steel Mills
Complex, Indus Super Highway Board, Dr. A.Q. Khan’s Nuclear Research
Laboratories, Mazari Oil & Gas Facility and Sawan Gas Field
development in Pakistan.In the State of Kuwait and Kingdom of Saudi
Arabia, I have worked with Arabian American Oil Company in their
refineries,Gas plants and bulk plants, both in construction as well as
in HSE Department. Also worked with SABIC and
Al-Rajhi Group of companies at Managerial positions.Presently
working in Muscat, Sultanate of Oman with Al-Hassan Group of Companies
as HSE Advisor for Petroleum Development Oman projects, a subsidiary
of Shell international exploration & production, Holland.PROFESSIONAL EXPERIENCE:
AL-HASAN
ENGINEERING COMPANY, MUSCAT SULTANATE OF OMAN
.Duration:November2003. Till date
..Client:Petroleum
Development Oman,(PDO)
:Project:Construction
of 14’’ Dia. And 16’’Dia. Under ground GRE lines 35Km long for
Thuleilat water injection phase II project at Marmul. Construction of
6” Diameter carbon steel gathering line 7 Km from Marmul A to Marmul
Main Pumping Stataion. Installation
of fiber- optic cable for communication among stations.
Position:HSE
ADVISOR
:PIPELINK
CONSTRUCTION (PRIVATE) LIMITED, KARACHI PAKISTAN.
Duration:
August 2001 to October 2003.
Main
Contractor:Clough
Engineering (Australia) Limited. Karachi
Client:OMV
(Austria )Ltd.
Project:
Sawan Gas Field Development Project. # 4672Installation of
20” Diameter carbon steel under ground Sale gas Pipeline
(Transmission
line) 50 kilometers and 8”, 10” Diameters Duplex stainless steel
Flow lines 100 kilometers from
various wells to central
processing plant.Testing and commissioning of the pipeline.
Position:PROJECT
MANAGER.
:Client:B.P.
Exploration & Production Inc. .Pakistan.
Project
:Mazari
Oil & Gas Facility
Upgrade Job # 134 Installation of 8/10/18’’ Diameter carbon steel
Pipeline about 4 kilometers inside the plant Installation of flare
stack, knockout drum, IP / AG Scrubbers, Gas compressors, glycol
contactor, regenerator and cooler, flash separator and control panels.
Commissioning of new systems.
Position:H.S.E.Q.
MANAGER.AGAP ARABIA LTD & NATIONAL ENGINEERING SERVICES AND MARKETTING LTD
SAUDI ARABIA.
Duration:June 1998 to June 2001.Main
Contractor:Technip
ItalyClient:Saudi
Arabian American Oil Company (Aramco)
Project
:Replace
electric generators at Abqaiq plants Erection and installation of a
fullfledged. Power house comprising of 4 combustible gas
turbinegenerators( CGTG) with four heat recovery steam generators
(HRSG) on turn key basis.
Position:SENIOR
SAFETY OFFICER
:Main
Contractor: Saudi
Arabian Bechtel Company Ltd. Saudi
Arabia
Client:
Saudi
Saline Water Conversion Corporation (Swcc)
Project
: Design
& installation of central air conditioning system and
automatic fire fighting system for their new desalination plant
at Shuaiba, Saudi Arabia.Position:PROJECT ENGINEER
MECHANICAL
:Client:Saudi Arabian Mobil Refinery(SAMREF)/ YANPET at Yanbu..Project:Various
Short Form Contracts For Plants Upgrade
Position:PIPING
ENGINEER Client:Saudi
Aramco Rabigh Refinery
..Project:Kerosene
and Naphtha Upgrade Project
.Installation of 10 kilometer 8 and 12 inch
stainless pipeline inside the plant for kerosine
and naphta. Relocation of two heat exchangers and pumps.
Commissioning of the new system. Position:SENIOR
HSE ADVISOR:Client:Saudi
Arabian American Oil Company (Aramco)
Project:upgrade
safety and fire fighting facilities at duba and tabuk bulk plants,
saudi arabia.construction of
firewater tanks and installation of pumps and necessary
rtr piping, sprinklers, hydarnts and control panels. Position:LOSS
PREVENTION ENGINEER
Client:Arabian Petrochemical Company Ltd (Petorkemya)
Project:Pvc Plant Upgrade Project.
Installation of vinyl monomer vessel, piping and control
units. Commissioning of the plant. Position:PROJECT
CO-ORDINATOR
.Client:Al-Jubail
Petrochemical company (KEMYA)PROJECT
Project:H.D.P.E.
Plant upgrade
Installation of pumps, tanks and piping inside the plant.
Position:PROJECT
ENGINEER MECHANICAL
Company:Al-Rajhi Company
For Construction Materials K.S.A.
Duration:(Jan.1991-Nov.1997)Projects:Construction of structure and skids for various plants and ware-houses
for Al-Rajhi Group of Companies.
Maintenance
of workshop equipment like lathe, milling, planner, grinders, presses,
bending machines, overhead cranes, gantry, forklifts, loaders,
generators and other tools, tackles etc.Manufacturing of air
conditioners and desert coolers. Manufacturing of wire mesh for
temporary fencing.
Position:WORKSHOP MANAGER
..Company:Faisal
S.Al-Naimi Establishment
..Duration:(Jan. 1989-Nov.90)Client:Chiyoda
Petro-Star Ltd, Yanbu K.S.A.
Project:Luberef
Expansion Project
..Position:SAFETY ENGINEER .Company:Al-Taif company for operation , maintenance and contracting Ltd, Riyadh
K.S.A.
Duration:Jan. 1987-Dec.88..Client:Saudi Youth Welfare Club
Project:Construction
of Al-Khaleej sports club at Seyhat &Re-construction of Dammam
stadium Maintenance
of workshop equipment like lathe, milling, planner, grinders, presses,
bending machines, overhead / tower
cranes,
gantry, forklifts, loaders, graders, dump trucks concrete transit
mixers, pumps, compressors, generators, jack
hammers,
hiltis, pumps and other tools, tackles etc. Maintenance of residential
buildings and offices utilities units like
HVAC
systems, room heaters, water coolers, geysers, flood lights towers,
sanitary and plumbing systems.
Position:WORKSHOP
MANAGER
.Duration:Jan.1983-Dec.1986:Company:Pakistan
Steel Mills Corporation Ltd, Karachi. Pakistan
Client:Tiazh-Prom-Export
Moscow, Former U.S.S.R.
Project: Construction
Of Pakistan Steel Mills Complex
:Obtained on the job training for assembling and
commissioning of Belarus tractors, bulldozers, loaders at USSR.
Worked as deputy manager in workshop for assembling /
commissioning of tractor bulldozers, loaders, other heavy equipment.
Was also looking after the service and maintenance of these equipment
during operation.
Worked
in Metallurgical Repairs and Heat Treatment Shop as Deputy Manager and
was responsible for construction of
heavy
industrial units and spare parts required during the capital repairs
of the Steel plant.
Position :
Joined as Assistant Executive Engineer and then promoted to The post of
Deputy Manager.
Duration:Feb.1978 – Dec. 1982
Company:National Highway Authority Client:Offermat Damat, France
Project:Indus
Super Highway 1000 Km.ConstructionWorked as Mechanical Eengineer with
the responsibilities
of repair
and
maintenance of large fleet of construction equipment like road
rollers,dozers,loaders,scrapers, excavators, crushing
plants,
precoaters, asphalt pavers
plants and vehicles.
Position: Mechanical
Engineer Workshop.
MAJOR
RESPOSIBILITIES AS A PROJECT MANAGER
Close
co-ordination with client Project
correspondence comprising of progress reporting, task risk assesments,
procedures for various activities like welding, open cut, thrust
boring rigging etc. Insepction request form submittals 24 hours in
advance for all line related activities Planning of daily work as per
construction schedule 24 hours in advance. Consumables demands and
acknowledgement of receipt.Two days look ahead plan submittal and
it’s implementation Callibration of gauges and psv and recorder for
all hydro-testing Water sample testing through laboratory, for
hydro-testing R.t. requests submittals R.t. reports
receipt
and preparation of weld maps and their verification by client.
Arrangements for all project activities and ensuring constant
supervision.Inspection of all quality documents on daily basis
Corrective actions for ncr and quality alerts / hse default and their
closing asap. Punchlist preparation and completion of the punchlist
items Co-ordination with landowners and taking corrective actions for
better community relations. Cordination with land department for water
courses and canal crossing Coordination with client / rig authorities
for open road cuts etc. Practical hazard identifications, risk
assesment and controls for new facility
MAJOR
RESPOSIBILITIES AS A MECHANICAL ENGINEER: Scheduling
and execution of various construction activities. Schedule maintenance
and repair of plants equipments like generators, compressors, boilers,
heat exchangers, fin fan units, diesel and petrol
engines, vehicles , construction equipments hvac and plumbing /
sanitary systems.Inspection and load testing of cranes, rigging gears.
Installation of plants, piping inside plants and cross-country
pipelines Commissioning of various plants and refineries equipment
.B.o.q. preparation and material takeover for various
projects.Arrangement for recovery of breakdown vehicles / equipments
.Spot purchasing locally available spares. Development of not
available spares through local vendors.Operation / maintenance of
large fleet of vehicles, roadconstruction equipment like rollers,
dozers, scrapers, graders, loaders, excavators, dumpers and big plants
like crushing plants, asphalt plants. Quality
control of various products at local vendors facilities.
MAJOR
RESPONSIBILITIES AS H.S.E. EXECUTIVE
:Lead
initiative to enhance consultant and contractor hse
performanc.Implement and assure achievement of corporate and pakistan
hse strategies, key performance indicators and procedures.Develop and
implement facility hse monitoring plan. Monthly hse statistics and
trend analysis recording & submittal to client. Implement and
monitor accident and incident notification and investigation
procedures and corrective actions. Develop and manage audit programmes
to monitor compliance with corporate and statuary hse requirements
Provide specialist
advice to line management teams and subcontractors as and when
required and regularly disseminate hse information.
Audit hse system
effectiveness, develop solutions and provide training to achieve and
record enhanced level of employees competency.
Assure compliance
with occupational health requirements incorporating field and
corporate medical advice.
Hazard and effects
management system application for all activities.
Safety induction of
all levels of employees on every project.
Hazard identification plan, write-up for all projects.
Training of various tradesmen for proper use of all sorts of tools and
special safety gears.
Indoctrination of all employees for recognizing of health, safety and
environmental hazards. Controlling of hazards through stop.
VARIOUS SAFETY AND MANAGEMENT COURSES ATTENDED
:8 safety golden rules course at british petroleum head office, karachi.
Task risk assesment course at british petroleum khaskheli, badin.
Work permit receiver’s course at rabigh refinery, saudi arabia.
Hazard recognition course at rabigh refinery, saudi arabia.
Hydrogen sulphide awareness and escape course at pdo training centre
nimr, oman.
Hydrogen flouride safety course at samref yanbu, saudi arabia.
C.p.r. course at abbott laboratories karachi, pakistan.
Fire fighting training at arabian petrochemical company, jubail, s.
Arabia.
Toxic chemical handling course at glaxo laboratories pakistan.
Actual fire fighting and controlling at azoctalsteel plant, ukraine,
ussr.
Problem solving and decision making course at p.i.m., karachi.
Iso-9000 awareness and understanding course at Karachi
First aid course at sawan, through saint. John’s ambulance services,
arranged by clough engineering field doctors.
H.s.e. induction senior level course at pdo traiing center nimr
sultanate of oman.
Supervising safety course at pdo traiing center nimr sultanate of oman.
Permit to work signatories course at pdo traiing center nimr sultanate
of oman.
Fire warden course at pdo traiing center nimr sultanate of oman.
Incident investigation and reporting course at pdo traiing center nimr
sultanate of oman.
Basic life saving course at pdo traiing center nimr sultanate of oman.
Basic gas teting course at pdo traiing center nimr sultanate of oman.
Enhanced safety supervision workshop at pdo traiing center nimr
sultanate of oman
Occupational road show attended at pdo traiing center nimr sultanate.
of oman.
……………….………………………
Mechanical Engineer –SS002-08
KHAN, FARRUKH SHARIF
EDUCATIONAL
QUALIFICATION: Degree of Bachelor of Engineering (Mechanical) from NED University of
Engineering & Technology, Karachi. (Pakistan). Year of passing.1995
SKILLS: Excellent
skills of operation, maintenance, installation and commissioning of
plant equipments specially HVAC systems in industrial, commercial
& healthcare buildings.
FIELD
EXPERIENCE: Currently working in AGA KHAN
UNIVERSITY HOSPITAL in the capacity of MECHANICAL
ENGINEER since June’ 04 with following responsibilities:
Review of Design Drawings, Specifications and BOQ
from consultants
Supervision of all Mechanical & HVAC works at
site according to drawings & specifications
Review of submittals from different vendors for owner
furnished material and contractor supplied items
Installation of all mechanical & HVAC equipments
Testing & Commissioning of the system
Handing over to Maintenance Department Worked in GETZ
PHARMA PAKISTAN (PVT) LTD. in the capacity of UTILITY
ENGINEER for six months (Nov’03 to June’04). Responsibilities
included
Operation & Maintenance of Chillers, Cooling
Towers, Air Handling Units, Boilers, Air Compressors,
Air Dryers, Split A/Cs, Window A/Cs, reparation of Maintenance
schedules and reports Keep record
of inventory for spare parts and consumable items
Worked in AGA
KHAN UNIVERSITY HOSPITAL in the capacity of AIR-CONDITIONING ENGINEER for two years (Oct’01 to Nov’03).
Responsibilities included
Operation & Maintenance of Chillers, Cooling
Towers, Pumps, Air Handling Units, Fan Coil Units, Air Compressors,
Air Dryers, Ultra Low Freezers, Split A/Cs, Window A/Cs etc.
Operation of Siebe BMS system Operation of Water
Treatment system
Preparation of Maintenance schedules and reports
Keep record of inventory for spare parts and
consumable items
Worked in BARRETT
HODGSON PAKISTAN (PVT) LTD. in the capacity of EXECUTIVE ENGINEER for
three years (Feb’ 99 to Sept’01). Responsibilities included
Operation & Maintenance of Chillers, Cooling
Towers, Pumps, Air Handling Units, Fan Coil Units, Boilers, Air
Compressors, Air Dryers, De-humidifiers, Split A/Cs, Window A/Cs etc.
Operation of Siebe BMS system Operation
of Water Treatment system Preparation of Maintenance schedules and
reports Keep record of inventory for spare parts and consumable items
Worked in
NATIONAL
ENGINEERING SERVICES in the capacity of SITE ENGINEER for
four years (Jan’95 to Feb’99). Responsibilities included: Review
of Design Drawings, Specifications, BOQ from consultants
Supervision of all Mechanical Works at site according
to drawings & specifications Co-ordination b/w MEP contractors to
resolve on-site issues Installation of all mechanical & HVAC
equipments Testing & Commissioning of the system Handing over to
Maintenance Department
PERSONAL DETAILS: Date of Birth
25-11-1971 Marital Status:
Married
. PROFESSIONAL
MEMBERSHIP: Pakistan Engineering Council
.COMPUTER
KNOWLEDGE: MS Word, MS Excel, PowerPoint, AutoCAD
……………….………………………
Mechanical Engineer –SS003-08
Mohammad
Ather Abdul Warsi
Father’s
Name M. H. Warsi
Date of Birth:01/06/1961 Marital Status: Married
Religion:Islam Nationality:Pakistani
. ACADEMIC
PROFILE
:B.Sc (Mechanical Engineering) First Division, From
University of Engineering and Technology (UET) Lahore in year of 1985.
: H. S. C. (Pre-Engg) First Division from Karachi Board
in the year 1978
:S. S.C.(Science ) Second Division from Karachi Board
in the year 1976.
PROFESSIONAL
PROFILE :
Compressor Operation & maintenance. Manager
Safety Performance.Basic Secondary Spinning.Practical training
Completed in PIA Engine-Overhauling shop Karachi. Maintenance
Training in Karachi Shipyard and Engineering Works.On Job Training in
Utility Section of Abbot Laboratories, Karachi. I.T.
SKILLS :MS
Windows,MS Office,Internet & Email,Auto CAD
.ACHIEVEMENT
/ PROJECT COMPLETED : As a Graduate Mechanical Engineer, I started
my carrier from ADAMJEE COTTON MILLS, Karachi, in 1984, as a TRAINEE
ENGINEER in their A/C Area.For Broad spectrum / Multi experience, I
quit from ADAMJEE Mills and joined a Local polyester Producing process industry called
M/s National Fibers in 1985, as an Assistant
Manager in
their Utilities
Dept, and
completed successfully
my 1stDE-BOTTLE NECKING project over there with the
collaboration of M/s SAM
YOUNG Co Korea. In 1991 I proceeded to U.S.A for further Education in Advance
Engineering, but
joined Artesia Dying & Printing Inc.L.A U.S.A as Utility Engineer.
In 1994–95. I returned back to Pakistan without
enhancement in my
Degree / qualification and joined local textile industry in Pakistan.
During 20 Years of Technical Experience / tenure I had completed three
major projects in GREY & DENIM FABRICS from inception stages
(LAND SCAPING) till Production Start up. After post Erection I was
responsible for smooth operation of entire Utility dept. Including
Power House and Work - shop in the vicinity.Currently working in LOCAL
TEXTILE MILSS As General Manager Engineering. Responsible for all
Engineering Activities. Tips of Project Completed,Complete Design
& Installation of Power House, Boiler house, Chiller/
Humidification plant, Compressor house, R.O Plant , Effluent Treatment
plants, Indigo dying , Sizing , Finishing etc. etc.Transportation
of Stream/Condensate piping lay out is my subject of interest Searching
for more grooming in Engineering aspects, since Engineering is said to
be Devine. EMPLOYMENT
PROFILE :
Above Ten years experience in Petro
Chemical Plant, namely NATIONAL FIBERS LTD. (NFL) The main product of
NFL are synthetic polyester Staple fiber + filament yarn through Batch
process. I started my Engineering career as an Assistant – Manager
& resigned as Manager Engineering Brief details of Job
description/assignments are as under. ASSISTANT
MANAGER (UTILITY) IN NATIONAL FIBRE.
From
January 1985 – 1988:Being as Engineer, my first assigned department
was Utility department. In Utility Section
complete engineering
and engineering equipment was available for professional
growth. Initially my
job description was to check parameters and maintains the A/C section
& accessories.As a shift engineer my duties, entailed man –
Management of work force, proper utilization of
Man hour and logging of parameters/Events. The main target was
predictive maintenance of plant hard ware in cooperation, with The
Engineering Staff.
DEPUTY
MANAGER (UTILITY) IN NATIONAL FIBRE.
From January 1989 – 1991:During my
tenure as
a Deputy Manager.
I was responsible of Operation and Maintenance of Utility
Plant.Following assignments / targets completed successfully.
Q.C of intermediate and final product. (Team Leader)
In 1990 took active part in De-bottle necking project of fiber plant
with the collaboration of Sam Yang Co, Korea.To improve quantity and
quality assignment assisted UNIDO expert.Developed system under
“Process Control Optimization” slogan. During expansion project
under foreign principal, Coordinate / followed all the instruction of
erectors, regarding flow operation and safety checks. Orientation
of “Safety pobups and check program” design and implemented.Vigilance
Manager duties
ENGINEER
WARE HOUSE (MECHANICAL)
From January 1992-1994:In 1992 I proceeded to
United State for further study I had joined Textile Mills,
namely Artesia
dying & Printing Inc 1005 East Artesia, Blvd, Carson, California,
U.S.A. as a Warehouse Engineer, my job was to maintain, the
Inventory level, check – in & check-out of engineering items
according to their specification. Coordinate with floor and
Engineering staff, & to maintain Data Book Technical Library /
Manual etc.
MANAGER
(ENGINEERING) IN NATIONAL FIBRE.
From 1994 – 2000:In 1994, rejoined NFL
as Manager (Engineering) and was responsible for all Engineering
aspects & maintenance of entire plant.Pin points of Job
description are: Procurement and arrangement of all spares (local
& imported)Preparation / planning and Execution of plant turn
around. Annual Shutdown of whole plant job included, Evaluation /
planning of B.M.R.
(Techno-Economics)Dealing with consultants, contractors and
Government institution.To manage and supervise contractors at site.Parity statement, Bid evaluation & awarding, technical specification,
parts Inspection, inventory control, Bin cards system /
warehouse inspection.Team member during annual audit of the
factory.Arrangement of training facilities for junior Engineers &
staff. SITE ENGINEER / INCHARGE HVAC From
2000 – 2002:In 2000, I joined YUNUS TEXTILE MILLS, LANDHI, As in
charge Utility section, successfully completed erection of:CHILLER’S PLANT,A/C
SYSTEM (LUWA),COMPRESOR’S HOUSE,POWER HOUSE,BOILER HOUSE After
post erection, responsible of smooth operation of Entire Utility Plant
PROJECT ENGINEER / MANAGER UTILITIES From
2002 – 2004:Join NAVEENA
TEXTILE (DENIM UNIT) During Job Tenure Successfully Completed erection
of entire utilities section.
After post erection, Responsible of Smooth Operation of
Utilities Section PROJECT ENGINEERING From
2005 – 2006:Join AFROZ TEXTILE (TOWEL UNIT) as Manager Engineering.
Responsible for all Engineering
activities Required in Towel Unit (weaving & Processing
both).
GENERAL
MANAGER TECHICAL From
2006 – Till Date: Joined ADNAN APPREL, F.B Industrial Area Karachi
as GM Tech, and Responsible for all Mills Activities.
……………….………………………
Mechanical Engineer –SS004-08
MUHAMMAD AHMAD WASI
Father’s Name: Shaikh Muhammad Wasi Marital
Status: Married Date Of
Birth: 14th
August, 1968 Work Summary Most
Recent 8 Years Mechanical Engineer … Application Engineer HVAC
System Mechanical Engineer . HVAC System
|
Experience: From
January 2005
Pakistan Airconditiong & Mfg. Corp. Pak Application
Engineer Preparation of quotation and
supporting sales staff for selection of equipments, Building or
space load calculation, duct design and layout, Pumps and
Cooling Tower selection. Selection of
Chillers including EBARA, Japan Absorption chillers of all types
(Gas, Steam, Hot water) and coordinating with the parent co.
liaison office in Dubai for the product specification and
compliance with the project specification.September 2000 to July
2004 Saudi Airconditiong Mfg. Co.
Saudi Arabia. Product Engineer
Study the product, detailed drawings, preparation of product
structure (BOM), specification
of purchased and fabricated parts. Provide assistance to
Production, Materials Procurement & Marketing for the smooth
operation of the Plant. Study and review requests for
engineering modification/changes and deviations against standard
product. Worked as Project Coordinator for the Technology
Transfer of Carrier package unit model 50ZP series (3 to 5 TR)
and the necessary design modification and development for the
export market. October 1998 to July 2000
Arabian Air Conditioning Co. Jeddah, KSA .Application
Engineer Product study and selection, preparation of quotations
and submittals, Study the project specification Completed Basic
System Design Training (BSDC), conducted by CARRIER for the
building heat load estimation, psychometric and knowledge of
various air conditioning systems and familiarization of CARRIER
products and the use of computer selection program. Maintaining
product catalog, computer selection program and their
distribution record. Maintaining quotation database for the
branch. July 1997 to October 1998 Marine Services (Pvt) Ltd.Pakistan Sales
Officer Marketing technical products
including hydraulic and pneumatic seals, lubricants, grease, and
special protective coatings. Study for the product
implementation and application. December 1994 to July 1997
Pakistan Steel Mills Corp. Ltd
Pakistan Mechanical EngineerWorked in the hydraulic and
pneumatic section of Cold Rolling Mills The Mill includes
Pickling unit section, Reversible mill, Temper mill, Galvanizing
unit, slitting unit, and special profile forming section.Performed
regular visual inspection and preventive maintenance of the
equipment comprising hydraulic and pneumatic cylinders,
electromagnetic valves and actuators for the cylinder.December
1991 to November 1992 Sogea, a French Co.PakistanJr. Mechanical
EngineerWorked at Karachi International Airport with the SOGEA -
Quality Control Dept. Performed the receiving inspection of the
HVAC materials. The duct fabrication, the erection of duct
works, testing and final inspection.Participate in the final
inspection & testing of AHU & FCU.April 1993
NED University of Engineering & Tech.Karachi,
Pakistan.Bachelor
of Engineering (Mechanical),
P.E. Mechanical No. Mech/10679 |
|
April
1993 NED
University of Engineering & Tech.Karachi, Pakistan.Bachelor
of Engineering (Mechanical),
P.E. Mechanical No. Mech/10679HVAC
Basic System design training, Carrier E20-II program for heat
load calculation and ECAT equipment selection software programs.
YORK air-side equipment Selection Software. Nicotra fan
selection, Copeland compressor selection software. A. O. Smith
Motor Mastery. Roof Top Package Unit. MS Word, MS Excel, MS
Power point, AutoCAD 2000 (intermediate level).
MS Word, MS Excel, AutoCAD 2000 (intermediate level)
|
……………….………………………
Mechanical
Engineer –SS005-08
MUHAMMAD ISHAQUE
Objective: A
professional career in a competitive environment that demands
excellence in performance and provide opportunities to attune
professional growth based on the individual’s merit. Performance and
capabilities.
Professional
Experience: 2-years Professional Experience in Construction
/ Commissioning in Oil & Gas Fields.
Education:
|
EDUCATION
|
YEAR
OF COMPLETION
|
UNIVERSITY/INSTITUTE
|
|
B.E.
Mechanical
|
2005
|
QUEST
Engineering University Nawabshah
|
|
Intermediate
|
2000
|
B.I.S.E
Tando Mohd Khan
|
|
Matriculation
|
1998
|
B.I.S.E
Tando Mohd Khan
|
Poproject
theses: HVAC
of Automobile Air Conditioning Computer
skills:AutoCAD
2004 and Mechanical Desktop.Project Planner Primavera (P3) Process
(DCS, DPMS, MMS)Microsoft Excel,Microsoft Window.
Professional Training: Training of CTMP (Construction, Technology ,
Management & Planning) from Descon Engineering Ltd at Head Office
P3 Course from Head of Descon
Ltd Personal Information:
Father’s
Name:Muhammad Ayoob.
Date of Birth:August 26, 1982 NIC.No.41308-3812725-9
Nationality:Pakistani Professional
Experience:
EMPLOYER:
Descon
Engineering Limited
PROJECT: BHP BILLITON (ZAMZAMA PHASE 2 HCV
DEVELOPMENT) POSITION: Area
Planner of (Piping , equipment and Structure) DURATION: September, 2006 to –to date (Presently
working) Responsibilities:
- Involved
in execution activities of piping & Steel Structure Fabrication
and erection.Estimation of manpower requirements, histogram, s-curves.Preparation/update
of projects schedules, progress reports, follow-up sheets, task
orders, check lists, work breakdown structures, flow charts and
progress curves.Coordination of project activities with different
departments, suppliers and subcontractors.Prepare the detailed
schedule for the project, including time schedule, resources schedule,
and plant schedule.Collect data through site visits and prepare
status.Analyze the projects status and set the corrective action
needed. Prepare the organization chart & mobilization schedule for
project. Prepare weekly & monthly reports for the project.
Monitoring projects’ actual progress and cost. Preparation of
monthly statements and invoices. Work with the Discipline In charge
for preparation of daily and weekly schedules based on, 4-week and
three months look ahead plans.Distribute daily, weekly and Monthly
Targets to Discipline Engineers.Roll up area wise plan on weekly basis
and monthly basis to regenerate the forward planning In Primavera
Project Planner.Plan out the daily job on supervisor level as per
the work front availability.Monitor and analyze various aspects of
progress of all activities on daily basis with the implementation of
Daily Schedule & Time sheet. Closely watch booking of man-hours in
appropriate and correct cost centers in Daily Schedule & Time
sheet.Cold and Hot Insulation ( Nitrogen Removal Unit ) as a Execuator
EMPLOYER:Royal Engineering Ltd PROJECT:Attock Oil and Gas Refinery POSITION:Area
Planner DURATION:December,
2005 to July 2006
Responsibilities: - Planning & Scheduling of Equipement, Piping &
Strcutre.Coordination with Client regarding equipement , piping and
strctrue & Execution work.Estimation of manpower requirements,
histogram, s-curves.Prepare the detailed schedule for the project,
including time schedule, resources schedule, and plant
schedule.Collect data through site visits and prepare status.
Prepare
weekly & monthly reports for the project. Monitoring projects’
actual progress and cost. Distribute daily, weekly and Monthly Targets
to Discipline Engineers. Roll up area wise plan on weekly basis and
monthly basis to regenerate the forward planning In Primavera
Project Planner. Plan out the daily job on supervisor level as per
the work front availability.Closely watch booking of man-hours in
appropriate and correct cost centers in Daily Schedule & Time
sheet.
……………….………………………
Mechanical
Engineer –SS006-08
MUHAMMAD REHAN ALI
CAREER
OBJECTIVE
:Keen
to achieve a career in a leading, progressive and demanding
organization providing ample growth and learning opportunities with an
aim to contribute positively towards its goal to the best of my
capabilities.
ACADEMIC QUALIFICATION Bachelor of Engineering (MECHANICAL)
passed with 1st Division, 70.7% marks from NED University
of Engineering & Technology (2002-2005):
Intermediate with Pre-Engineering, Passed with Grade -A, 74.8% marks from Govt. Delhi college
(1999-2001):Matriculation
with Science, Passed with Grade -A, 79.7% marks from Gulshan
Cambridge school (1997-1999). PROFESSIONAL EXPEREINCE Presently working in MAPAK Qasim Bulkers (Pvt.) Limited as
a Terminal Maintenance and Project Engineer since
September, 2006.
Responsibilities: Prepare feasibility for
the upcoming Projects for Management review.Coordinate
with Contractors, materials procurement, verification of invoices,
financial monitoring and supervise works of on-going Projects like
Erection of piping, Construction/Fabrication of Storage tanks, Sand
Blasting, Painting, Welding, Calibration and Hydrotesting of Tanks and
prepare progress reports.Prepare BOQs, Cost estimation, Review and
evaluation of Bids.
Maintain
records and carry out preventive maintenance of Pump, Compressor,
Boiler and Generator.
Worked
in Gatron Industries Limited as a Trainee Engineer (Maintenance) in Spinning
department for 08 months (i.e. Jan – Sep, 2006) SKILLS Familiar
with API Standard 650 and P&Ids,Auto CAD,MS Office
PRACTICAL TRAINING:Analyzed
production, workshop practice, shutdown operations & plant
maintenance at National
Refinery Limited, NRL (June-July, 2004) FINAL
YEAR MECHANICAL PROJECT:Design
of Hydrogen Generation System using solar energy. PROJECT DESCRIPTION:Electricity
is generated by means of photovoltaic cells.Electricity generated is
utilized for hydrogen production by electrolytic cell.The system
includes the selection of appropriate photovoltaic cells, electrolytic
cell, pumps & compressor. It also includes the designing of piping
system, storage tanks & supports.
PERSONAL INFORMATION Father's
Name: Muhammad Salman
Date of Birth:27th September – 1983
N.I.C #: 42201-1552296-7 Place
of Birth: Karachi Marital
Status : Single
Languages: English, Urdu Religion: Islam
……………….………………………
Mechanical
Engineer –SS007-08
KUMAR
KHATRI
OBJECTIVES
:To
work in a progressive field, where by I can use my abilities and
knowledge to future my career aspiration. Seeking the position of
mechanical field to utilize my potential and enhance technical skills
in a progressive and goal oriented organization.
Father’s
name: Dev Kirshan Khatri Qualification: B. E( Mechanical)
.Experience:
6 years in
processing textile sector Date of birth: 02-04-1974
.NIC
no: 42201-2748326-5
Academic
Qualification
Matriculation:1990 A Grade
,
Intermediate:1992
A
Grade
,
B
.E Mechanical:
2000 2NDDivision
Final
Year Project
:Maintenance
of machinery in weaving section of Fateh textile mills Hyderabad.
Experience:
From December 2006 in AL-ABID Silk mills Karachi
(as a mechanical engineer ) 3 years in Rauf textile and
printing mills Karachi (as a maintenance engineer) One year in Dalal industries
Karachi (as a maintenance
engineer) Six months in A.M textile mills Kotri
(as a trainee maintenance engineer) Six month in Fateh textile
mills Hyderabad (as a trainee maintenance engineer)
Technical Skills
Experience in rotary
equipment ,electro pneumatic and hydraulic system Experience in
documentation of preventive ,corrective and predictive maintenance Experience in plumbering,fabricating and manufacturing shop
work Experience in heat exchanger and cooling towers Experience in reciprocating and centrifugal pumps
Experience in design and installation ,project work of
steam,air,chemical, water, and gas piping works.
Maintenance and
Operational Management Skills
Responsibilities
of wet process textile machines
of boiler house + of air generation
Responsibilities of R. O Plant + of waste water treatment plant
+ of fire fighting system
+ of health, safety and environmental
system + of
preventive ,corrective and predictive maintenance + of tools and spare
parts inventory controlling. + of department shifts schedules. +of
project,mini project and Planning. + of drainage system
+of daily reports to G M Maintenance.
Technical
Skills in Machine Erection & Civil Work
:Kusters padsteam dyeing machine 2004 PLC
(Germany) Osthoffsenge machine 2004 PLC based (Germany)
Laffar
peaching machine 2004 PLC based (Italy) ILGI screw air compressors
with air drier and line filters.Beiger mercerize machine 2005 PLC
based(Germany) Jacquard machines in looms shade (Switzerland)
Computer skills
Knowledge of MS
Operating system and MS Office.
……………….………………………
Mechanical
Engineer –SS008
-08
NOMAN
YOUNUS
Father
Name
:
Mohmmad
younus
B.E
MECHANICAL ENGINEERING N.E.D
UNIVERSITY OF ENGG &
TECH 1993-97
DIPLOMA:(SOFTWARE COMPUTERS
PETROMAN INSTITUTE)
( 1996-97) AUTO CAD:SHORT
COURSE 2000-2001
ISO 9002:PHILIPS
ELECTRICAL INDUSTRIES 1998-99
ISO 14001:PHILIPS ELECTRICAL
INDUSTRIES
2000-2001 EHS/HSE:GLAXO-SMITH KLINE PAKISTAN 2002-2003
DOE:PHILIPS ELECTRICAL IND
2000-2001
SPC:
PHILIPS ELECTRICAL IND
2001-02
KAIZAN APPRAOCH:PHILIPS
ELECTRICAL IND 1999-2000
LEAN SIGMA:
GSK 2002-03
JDE /BPCS:PHILIPS
ELECT IND /GSK
2002-03 PRIMAVERA
:EMIRATES
NEON 2003-04
CURRENT-EMPLOYER :
TOYOTA – INDUS MOTORS
PAKISTAN (DEC
2004 till DATE
)MANAGER
PROJECTS & PLANNING:
EX-EMPLOYER: EMIRATES NEON.CO.L.L.C SHARJAH
UAE .
Feb
2003 TILL
September 2004at UNITED ARAB EMIRATES (ShJ).
DEPUTY
MANAGER PROJECT & PLANNING
Ex-EMPLOYER :
GLAXO-SMITH KLINE
(GSK )(February
2002 TILL
January 2003)MAINTENANCE
ENGINEER
E:X
- EMPLOYER:PHILIPS ELECTRICAL
INDUSTRIES PAKISTAN
10TH
JUNE 1998 TILL
30th August 2001
PRODUCTION ENGINEER
(GLS / TL FACTORY )
Job Title
: DEPUTY
MANAGER PROJECT & PLANNING
( P.E ) .
Department:PROJECT / PLANNING /PRODUCTION
Reports to
: GENERAL MANAGER
.Interface
With : QC
, Production Dept. , Logistics
, Accounts. Purchase . Finance Reportees: 12 Engineers
, inhouse Contractors
, consultants , Vendors
Job
Description Supervising
power generation /
co-gen project of
5 MW / 700
Million PKR Supervising New Bumper Booth
painting line
146 Million PKR
Supervising Pre-Engg Building
system , civil foundation work , Road
works , Compresses Air system ,
Boiler , Fire
Fighting works ,
Jigs fabrication, ducting . Prepares
technical proposals for products including a description of the
proposed equipment, , performance,
reliability, materials and other data required to satisfy
customer specifications
Assumes complete program responsibility under the guidance of a General
Manager for
proposals and projects assigned. Coordinates with the representatives
of ,Customer Manufacturing, Quality, and Purchasing to plan and
develop programs.Participate in scheduling of engineering and drafting
activities. and BOQ /BOM .
Perform calculations in accordance with the approved
procedures, assist in developing and maintaining
project specifications and drawings and prepare estimate spread sheets
for project costs as required.
Maintains
technical liaison with customers and vendors working through the
Purchasing Departments.
Prepare
or assist the Lead Technical Professional in preparation of
construction scopes of work Establish
& Maintain Piping
& Ducting system ,Heating Ventilation
& Air Conditioning System (HVAC)
Responsible
for Maintenance & operation of Centrifugal Pump, Valves,
Compressors , Chillers , Cooling Tower , Heat
Exchanger .Recruited, trained, led and motivated personnel with
diverse skills and from different functions..
Executed audits and evaluated operational performance.
Recommendations led to performance cost and
manpower improvement programs.JUNE
1998- August 2001 :
(PHILIPS ELECTRICAL
INDUSTRIES )
Job
Title: PRODUCTION
ENGINEER (GLS
/ TL FACTORY )
Department
:General Light Section Production
, Business Group
Lamps
Reports to : PRODUCTION Manager / Factory
Manager.Interface
With :QCD , MMD ,
Services , Plant Engineering
, Accounts., Services .
Reportees:04 Production
Supervisor ,
60 operators
, 03
Technicians , 01
Electrician
Job
Description:
Responsible
for production of shift wise targets OF GLS Lamps. The monthly targets
are to produce five
million lamps from four
production lines with team of 60
operators and 4 production supervisors in a shift. Working
knowledge of
PLC ,
Planing production
schedules
, Preparing department
budget.
Exercise of quick decision making while managing the shift
production. Using the best results in Asia Pacific region Philips
factories as a benchmark to bring
a turn around in factory results.
Implementation of Design
of experiments( DOE) concepts to identify and address the root cause of chronic and recurring production problems. Training of
operators to maintain the process through Statistical Process Control tools (SPC) and Design of Experiments (
DOE) Use of BEST (Business
Excellence Through Speed and Team Work) Manufacturing Concept.
Implementation of ISO 9002 and ISO 14000
Quality Management System.
……………….………………………
Mechanical
Engineer –SS009-08
SAIFULLAH
Objective To get position as an outstanding Mechanical Engineer in a dynamic and
progressive organization offering sample opportunities for diversified
exposure, enhancement of my professional skills and career growth.
Personal
S/O
Shuhabuddin D.O.B:11-07-1982
Single Muslim
Pakistani C.N.I.C# 41301-7444286-5.Education:
B.E
Mechanical, 2006 (1st
Division) Intermediate, 2nd division, year 1999, from B.I.S.E Hyderabad. Matric, 1st division, year
1997, from B.I.S.E Hyderabad. Computer
Skills Auto CAD 2006 MS
Project and Office Windows
98, X Internet & e-mail. PROFESSIONAL
AFFILIATION Member, American Society of Mechanical Engineer,
New York. Member, Pakistan Engineering Council, Islamabad. TECHNICAL training 4-Weeks Internship at Pakistan International
Airlines (P.I.A) Karachi.
4- Weeks Internship at Jamshoro Power Company (JPCO Thesis/Project Thesis
on “Major Hazards Control in
Oil Fields of Pakistan”.
……………….………………………
Mechanical
Engineer –SS0010-08
SHAHAN
NAFEES
Persona-Details: Marital Status:
Single, Date Of Birth:06-July-1981 Nationality: Pakistani,
Language: English
OBJECTIVE:To use my knowledge and engineering skills for serving mankind and to
earn a contented and honest life to enter in professionals’ life in
order to apply various technical, management and other skills acquired
during the academic career
.EDUCATIONAL DETAILS:
Education:B.E
(Mechanical): Division: First Division.: University: Ned
University Of Engineering & Technology, Karachi,
Study
Period: January
1999 To February 2003
ENGINEERING
PROJECT: Design
of a Gas Engine Plant of 5KW Using Bio-Gas
Under the Supervision of Engineer Ismat Ali, Principal
of Fuel Research
Centre (FRC) Pakistan
Council of Scientific & Industrial Research (PCSIR)
Karachi, Pakistan.
WORK EXPERIENCE:Duration:24th July 2003-to Date: Company: Simcon
International (Pvt.)Ltd.Designation:Deputy Manager.:Department: Design
& Engineering Department :Nature Of Job: Management
Of All Cad/Cam Based Designing And Manufacturing Projects For
Automotive Industry.TECHNICAL
SKILLS:3D Solid and Surface Modeling, 3D
Assembly Modeling.,3D Scanning.,Designing of Plastic Molds, Sheet
Metal Dies, Pressure Die casting Dies, Jigs & Fixtures.,Rapid
Prototype Development.,Supervision of all Manufacturing Projects.,2-D
Drafting, Detailing and GD&T.,NC tool path generation with
reference to CAD model.,Project planning.,System administration &
implementation.,Team building &monitoring.,Trainings of CAD/CAM
software, CNC machine programming & operation. PROFESSIONAL
PROFILE:A result oriented professional with over 4yrs of rich & dynamic
CAD/CAM experience. Adept CAD/CAM operations involving
3-D Modeling, Drafting,Manufacturing & Assembly
Design.Possess understanding of Engineering Drawings & Layouts
oriented with Manufacturing applications.Excellent communication
skills with co-ordination, troubleshooting, Problem defining &
solving capabilities and skills in solving technical issues related
with CAD/CAM.Besides of CAD/CAM, experience in Inspection and Quality
Control.APPLICATION SOFTWARE:Proficient in high end CAD/CAM/CAE softwares given below in detail with
modules.Unigraphics NX4:3D
Solid & Free Form Modeling, Advance, Assembly ,Mold, Wizard,
Sheet, Metal, CAM, Motion,
Solid.Edge.V.19:
3DModeling,Sheet,Metal,Advance Assembly,Drafting.NX
CAM Express:Turning.,3 Axis Machining.,High Speed
Machining.,Machining Simulation.,Programming Automation.,Customization
of CAM Wizard., Customization of Post Processor.,Customization of Shop
Documents.Image Ware:Rapid
surfacing,,High-quality surfacing,,Reverse engineering,,Computer aided
verification,,Polygonal modeling,Rapid prototyping
.Pro-Engineering
2000i:3D Modeling,Drafting,CAM Vericut
V.5.2:Simulates CNC Machining,Optimizes NC Program Cutting Speeds.Master
CAM V.7:CAM.AutoCAD R-14:3D Modeling,2D Drafting.Auto Form:Die Designer,Blank Designer.
Fast
Blank:Surface Output of the Blank for Sheet Metal Parts.,Unfolds Compound
Bends as well as Draw Sheet Metal Parts & formed parts.PROFESSIONAL
TRAININGS:Completed satisfactorily four Weeks’ training (From February
2003 to March 2003) of Specialized Professional Course in
,Computer Aided Manufacturing (CAM) conducted by Precision
Mechanics & Instrumentation Training Centre Karachi,
including the following Course
Contents:Work Coordinate System,CNC Machine Programming ,Drawing Editing,CNC
Machine Operation.,Completed satisfactory two days’ training of
Productivity Improvement conducted by AutomotiveTesting
& Training Centre Ltd.Completed
satisfactorily four days’ training (From 30th Oct. To
2nd Nov.) of Specialized Professional Course in
Computer ,Aided Designing (CAD) From ECSS (Engineering Computer
Services Singapore) conducted by Unigraphics
Solutions Singapore,
including the following Course
Contents:
Solid
Edge Fundamentals.,Advanced Assembly,Sheet Metal. AWARDS
AND HONORS:Certificate awarded by Chairman
of SIMCON International (Pvt.) Ltd. for my overall outstanding
performance.Certificate awarded by Principal
Engineer Ismat Ali of Pakistan Council of Scientific & Industrial
Research on the dedication of final year engineering project.
……………….………………………
Mechanical
Engineer –SS0011.08
ENGG.
SYED HABIBULLAH
HUSSAINY
SUMMARY OF QUALIFICATIONS: Experience includes diverse managerial skills in
project
management,execution,installation,erection,operation
and maintenance of Plant
& Machinery. Experience includes preventive & sheduled repairs
of Diesel Hydraulic Locomotives, Railway Wagons, special Rolling
Stock, Steel Mill’s Hot-Metal & Slag Ladle-Cars. Experience of
organising different type of repairs at various complexes of Steel Mill. Experience
in planning & organising the shift working in
emergencies.Established training programs for Staff & Workers to
attain organization's objectives with initiative & motivation.
EXPERIENCE: a.)
Engineering experience
of 22 years in PAKISTAN
STEEL: As a member of Project Execution
& Management Cell of Pakistan Steel, One year experience for the execution,erection and
installation of steel Structures & Mechanical equipments of “ Converter Slag Processing Plant", as Manager/In charge Mechanical. Now this Project is in operation.(May,1999 to June
2000)One year as Manager Mechanical)
in Central Maintenance Department for the execution, erection and
installation of “Scrap Baling
Press’’ at Scrap Shop of Cold Rolling Mill. Now this project
is also in operation.(1998 – 99)Three
years as Manager (Mechanical) in Central
Maintenance Department. Responsible for the preventive and
schedule repairs of Hot-Strip, Billet Mill and other complexes of
Pakistan Steel. Also responsible to plan shift working during
emergencies.(1995 – 98) Eleven years as the In charge
Maintenance of Heavy and special Rolling Stock of Railway
Department of Pakistan Steel. Responsible for the maintenance of Slag
and Hot- metal Ladle Cars.(1984–95)Two
years as“Asstt.Supdt.’’for
the maintenance of mechanical equipments in Locomotive Repair Shop of
Pakistan Steel. (1982-84)Two years as“Asstt.Supdt.(Mech)’’in
Railway Department of Pakistan Steel. Responsible for the repair,
maintenance and operation of Locomotives
& wagons.(1980-82Two
years as “ Asstt. Executive Engineer.(Mech)’’ in Railway Department of
Pakistan Steel. Responsible for maintenance of Locomotives. (1978-80)(b.)Engineering
experience of 7 years in M/S
SYNZR INDUSTRIA CONSTRUCTION ENGINEERS
as Senior Manager(Mech.).Experience of maintenance,project management,execution,installation and
erection of Plant & Machinery with effect from 15-8-2000 to
07-5-2007 (After the experience of 22 years in PAKISTAN STEEL).EDUCATION:B.E (Mechanical) from NED University Of Engineering &Technology, Karachi in FIRST
Division.B.Sc. (Pass) from Karachi
University in FIRST
Division. Major Subjects---Physics, Statistics &
Mathematics) Inter Science
(Pre. Engg.) from Karachi Board in FIRST Division. Matric
(Science) from Karachi Board in FIRST
Division. Post-Graduate Education:MBA (Marketing) from AIOU, Islamabad. Have passed all 24 subjects.
The Degree will be awarded after the submission of a “Report” on
the marketing activities of any selected organization). FOREIGN
TRAINING: Six
months in U.S.S.R in the
field of “Repair
&Maintenance of Diesel
Hydraulic Locomotives” upon the recommendation
of Pakistan Steel.
(1978-79)COURSES / SEMINARS: Three
months course on “Operation
& Maintenance of steel plant power equipments” held by
Training & Manpower Development Department of Pakistan Steel. Five
days course on “Industrial
Safety & Accident prevention' conducted by the Safety
Department of Pakistan Steel. The following courses/seminars conducted
by the Management Development Center of Pakistan Steel: Participated
Five days course on “Managerial
Skills Development". Participated three days course on “Effective Communication Skills”.
Participated
two days seminar on" Shop Floor Labor Laws” .PROFESSIONAL
AFFILIATIONS:
Life member &
Registered Professional Engineer of Pakistan Engineering Council. Member
of The Institute of Engineers,Pakistan.AVAILABILITY:
After
one month, Availed Voluntary
Retirement Facility of Pakistan Steel with effect from 13-06-2000
in the age of 48 years
due to my own circumstances and served M/S Synzr
Industrial Construction Engineers as Senior
Manager
(Mech.) with effect
from 15-8-2000 to 07-5-2007.Now temporarily engaged in KEN LUBES
International Karachi
as In charge
Technical services. MARITAL
STATUS: Married person with sound health and physique. RELEVANT
DOCUMENTS: Will be furnished at the time of interview.
……………….………………………
Mechanical
Engineer –SS0012-08
ANSAR
UL RASHID
Objective:POSITION
AS MANAGER TECHNICAL/ OPERATION
:
Highlights
of Qualifications
Bachelor
Degree in Mechanical Engineering from NED University of Engineering
& Technology in 1978.
Diploma of Associate in Mechanical Engineering from State Technical
Board Bihar in 1967.Good communication skills and Technical skills in
Engineering disciplines to present solutions to times and resource for
major projects.Positive professional attitude, committed to Quality,
Safety and progress.Attended several courses in PAKISTAN INSTITUTE OF
MANAGEMENT SCIENCE for management skills.
SummaryOver
30 years of international and national supervising experience
in
construction and project management ,cost engineering material
and bid evaluation and procurement, making technical and commercial
proposal, claim settlement in petro chemicals industry. Erection,
commissioning and Maintenance of mainline, transfer and flow lines,
oil production facilities, loading and unloading stations pumps as per
API, ANSI, BS and other relevant standard and procedures.
Experience: Sagri
Associate & Consultant.December
03, 2005 to October 2006(Project
Manager)
Supervision
of 5000 M.T and 2500 M.T.
storage
tank construction and 10” dia &
6” dia piping from Edible oil PQA jetty to station and
construction of office and pump & 400 KVA Generator House, For
MUJAHID OIL TERMINAL at PORT QUASIM
.Pipe
link P/L Construction Co (PCL)September
2004 to july 2005(Project
Manager) Responsible for Construction of well head piping and flow line for gas field for OMV Pakistan Ltd Kadanwari gas field
area. And fabrication of all steel structures.
Techno
Engg & Construction Co:April
2003 to march 2005(Project
Manager /Section Incharge)Responsible for construction, hydro testing
and commissioning of 26”dia pipeline 860 KM pipeline from Karachi to
Muzaffargarh Gujrat.for PAK ARAB REFINARY Ltd.
TOTAL Engg & Inspection Co,Karachi:(June2002
to January 2003) (Manager/Inspection)Overall
Incharge of Inspection of Polyethylene coating 16”dia 2000 nos pipes
at Crescent pipeline Mill at Nooriabad for CLOUGH ENGG AUSTRALIA
LTD.for Sawan gas field.
Pak Arab Refinery Limited:April
1988 to January 2002(Senior
Mechanical Engineer)Responsible for supervision /Project management of
30”dia oil tanker crude unloading line from BOP-1 (Jetty) at Keamari
and Bulk storage tanks (floating Roof Type)
Development of export facilities for Motor Gasoline at Keamari
Maintenance of 16”dia cross country pipeline by Pigging & by
sleeving. Supervision of DKF Project by addition of 50,000 MTstorage
tanks (fixed Cone Roof Type) at korangi
Commissioning of PARCO 16”dia and 8dia mainline & spur line
Karachi to Gujrat and from NRL/PRL TO Korangi
Laying of 1.5 KM 20”dia unloading line from parco Kiamari to
18”dia transfer line to Korangi Installation of additional 500
HPGoulds Pump at Keamari Terminal
ENAR Petro
-Tech Services (Pvt) Ltd:1985
to 1988 (Mechanical
Engineer)Responsible
for bid evaluation of technical and commercial proposals submitted by
contactors.(Resident project Engineer)Incharge of laying 8dia product
transfer line from Attock Refinary toPSO Station at Sihala.
Tamimi,Fawad
Reading & bates co (Saudi Arabia):1983
to 1985.(Sr.Mech Engineer)Responsible
for making Technical and Commercial Proposal and bid costing for
several pipeline project for ARAMCO, SAUDI ARABIA.
Pak Arab Refinery Limited:1979
to 1983.(Mechanical
Engineer)Responsible for almost all pipe line
laying activities such as stringing, ditching ,welding, coating
, laying , hydro testing ,Tie-ing
back filling, and commissioning of 16”dia 864 KM mainline
from Karachi to Muzaffargarh. Shift Engineer In charge
of running of Pumping Station at Korangi for smooth operation.
People
Enterprises Ltd:1978-1979.(Mechanical Engineer) Responsible
for fabrication of steel structures like beams , girders and trusses
etc for Pakistan steel
Pvt .Ltd. NOTE:
More than5 years working experience in EPWAPDA as Sub Astt Engineer,
Mechanical after obtaining Diploma in Mech engineering.
Professional
AffiliationsMember
Pakistan Engineering Council (Life Member ) Member Institute of
Engineers
.References Syed Zakir Hussain Shah (General Manager /
PARCO) ,Noor Muhammad Chandio (General Manager / ENAR)
……………….……………………
Above These we have more
CV,s
|