| Contact
Super
Services At ssmanpower@ssmanpower.org
Please Be Sure Mention the Worker Code e.g SAFETY.SS-001-08
Safety
Eng/Supervisor:
SAFETY:SS001-08
ABDUL WAHAB
MUHAMMAD IBRAHIM
PROFESSIONAL
QUALIFICATION
B.E.
(Electrical Engineering)
from MUET, Sindh, Pakistan.
PGDPA-
Post Graduate Diploma in Public Administration, from University of
Sindh, Pakistan.
PROFESSIONAL
AFFILIATIONS
Member of Pakistan Engineering Council (PEC), Registration #
Elect/ 08997
COMPUTER
SKILLS
Application
Packages:
MS-Office
(MS-Word, MS-Excel)
·
Operating/ Using of Internet System
TRAININGS/COURSES
·
Qualify PTW
Examination of RLOC Qatar, arranged by Technip
France
·
Qualify“Supervision
and leadership Programme”8 Modules, arranged by JGC
Middle East FZE, Qatar
·
Qualify
“Incident Investigation & Reporting Course, at JGC
Middle East FZE, Qatar.
·
Training H2S at
JGC Middle East FZE,
Qatar.
·
BP’s 8
Golden Safety Rules, Khaskheli Oil Fields, Badin, Sindh,
Pakistan
·
Use of PPE for H2S & H2S Detectors with Breathing
Apparatus (Maritimes Industrial
Services, Dubai, arrangedn by BP,
Oct. 2000)
·
Permit to Work of BP
·
Safety Watch Training at BP
Badin, Sindh, Pakistan.
·
Hazard Identification Training at BP
Badin, Sindh, Pakistan.
·
Task Risk Assessment (TRA) Training at BP
Badin, Sindh, Pakistan.
APPRECIATION/REWARD
·
Appreciation Certificate by TECHNIMONT, Abu Dhabi, UAE
·
HSE Badges “I got HSE Right” (04-Nos) from BP
Pakistan Exploration & Production Inc.
PROFESSIONAL
EXPERIENCE
15-years in
Pakistan and Abroad Professional Experience of the HSE &
Electrical Engineering in with Oil & Gas Fields, Petrochemical,
Oil Refinery & Sugar Industries
HSE
Engineer (September 2006 to March 2007)
Worked
as a HSE Engineer at Power Generation Integration
Project, ADCO Asab, Abu Dhabi, UAE, with CEGELEC France, during
this project company deployed me on Annual Shutdown of GASCO Asab for
one week (January 24 – 31, 2007)
1-
Responsibilities:
o
Preparation of Risk
Assessment as per job requirements.
o
Preparation of IVMS/ VMD Reports of Vehicles,( vehicle
analysis device)
o
Prepare Weekly &
Monthly reports as per ADCO requirements
o
Conducted HSE
meeting on fortnightly basis with subcontractor
o
Ensure the Isolation by ADCO
electrical shutdown Activities.
o
Essential arrangements/precaution has been taken to
ensure the safe working at site
o
Ensure Safe working for Scaffolding/ Working at height,
lifting operation, Excavation in live plant & implementation of
safety policy from gross root level to management.
o
Monitor the Civil
Contractor Granite Engineering’s activities as such formwork,
concerting, grouting, Lifting/erection of
pre-cast columns, each height 10-20 Meters.
o
Monitor the Sub
Contractor Universal Voltas HAVAC ( Heat Ventilation and Air
Conditioning) activities
o
Monitor 33 KV HT Cable Pulling in Excavated Trenches,
and cable termination work in control room of ADCO Power Station, the
Hot jobs similar to welding, grinding, usage of power brush, drill
machines, Cutting &flame torch,
Pipes bending machines.
o
Dispose off different
types of wastes
like Garbage, west water, Metallic , Plastic, and cable waste from
site as per procedure of ADCO UAE.
HSE
Engineer (Feb –July 2006)
Worked
as a HSE Engineer at Ras Laffan Olefin, Ethylene Project,
Ras
Laffan Industrial City (RLIC) Qatar for Technip France, with Descon
Engineering
2-
Responsibilities:
o
Preparation of Safe Job Safety Analysis (JSA)and Risk
Assessment as per Work requirements.
o
Conducted STARRT on daily & Tool Box Talk on Weekly
basis (as per Technip procedure)
o
Erection of pre-cast
columns weight of 25-30 ton and length 10-22 Meters, erection of
10-35 dia pipe spools with Tendum lifting 300 ton capacity of
cranes.
o
Essential arrangements/ Safe precaution has been taken
& ensure the Safe Working at height, lifting operation & Safe
driving.
o
Ensure the implementation of safety policy from top to
bottom level.
o
Manage/ Supervise to Civil activities similar to
formwork, concerting, grouting, Lifting/erection of
400 Nos of pre-cast columns, each height 5-20 Meters.
o
Supervise the Hot jobs similar to welding, grinding,
usage of power brush, drill machines, Pipes bending machines and
welding temperature process
o
Dispose off different
types of wastes
like Garbage, west water, Metallic and Plastic from site.
HSE Engineer (Oct 05-February 05,2006)
Worked
as a HSE Engineer at Dolphin Upstream and Compression Facilities
Project,
Ras
Laffan Industrial City (RLIC) Qatar for JGC Middle East FZE with
Descon Engineering
3-
Responsibilities:
o
Preparation of Task Risk Assessment TRA & Safe
Method Statement (SWMS)- Incorporating Job Safety Analysis as per job
requirements.
o
Conducted Safety Meetings on Weekly basis with Site
Manager and Engrs/ Supervisors.
o
Conducted Tool Box talk on daily basis
o
Safely Completion the
Erection of 120 pre-cast columns weight of 25-30 ton and length
15-20 Meters, erection of
10-25 dia pipe spools with Tendum lifting, use of 200 ton
capacity of cranes.
o
Essential arrangements/precaution has been taken to
ensure the safe working at site
o
Working at height, lifting operation & ensure the
implementation of safety policy from top to bottom level.
o
Manage/Supervise to Civil activities similar to
formwork, concerting, grouting, Lifting/erection of
600 Nos of pre-cast columns, each height 5-14 Meters.
o
Safely completion of
Hot jobs similar to welding, grinding, usage of power brush,
drill machines, Pipes bending machines and welding temperature
process.
HSE
Engineer (Feb-July 2005)
Worked as a HSE Engineer at Abu Dhabi Descon works (ADDWORKS),
Al-Ruwais,
Abu Dhabi, UAE, with DESCON Engineering Company Ltd.
4-
Responsibilities:
o
Preparation
of Risk Assessment as per job requirements.
o
Conducted Safety Meetings on daily basis
o
Essential arrangements for the to ensure the safe
working inside of descon workshop
o
Safely completion of Working at height, lifting
operation & ensure the implementation of safety policy from top to
bottom level.
o
Supervise the Hot jobs similar to welding, grinding,
usage of power brush, drill machines,
Pipes bending machines and welding temperature process.
HSE
Engineer (Jan-Feb 06, 2005)
Worked as a HSE Engineer at Shutdown of Abu Dhabi Polymer
Company Limited (BOROUGE),
Al-Ruwais, Abu Dhabi, UAE, with DESCON Engineering Company Ltd.
5-
Responsibilities:
o
Implementation of Work Permit System
o
Preparation of Risk Assessment.
o
Conducted Safety Meetings on daily basis
o
Necessary arrangements for the to ensure the safe
working in vessels, Tanks and big
Columns, working at height up to 105M, Lifting operation &
ensure the implementation of
Safety policy to gross root level as well
o
Supervise the Hot jobs, Electrical activities like,
Temporary power supply to whole plant.
Senior
HSE Engineer (August-December- 2004)
Worked
as a Senior HSE Engineer with Siemens Pakistan at Badin Concession
block of BP Pakistan Exploration & Production Inc. on following
construction projects:
1
Dupheri Gas Compressor Installation
2
Jabo Gas Compressor & Water Injection Pumps Installation
6-
Responsibilities:
o
Implementation of HSE requirements as per procedures and
guidelines provided by client.
o
Preparation of ‘Emergency Rescue / evacuation Plan’
prior to starting the project.
o
Preparation of TRAs (Task risk assessments).
o
Implementation of ‘Permit to work’ system &
Auditing as well.
o
Manage all HSE requirements for lifting operation,
Piping, Scaffolding, Excavation, installation of Equipments etc.
o
Preparation of equipments’ Checklists as per BP
Procedure.
o
Conduct weekly GCMs (Group Communication Meetings)
o
Preparation of incidents/accidents’ investigation
reports.
o
To conduct Fire drills practice.
o
Arrangements of safety training to supervisors,
firewatchers, and new comers employees.
o
Preparation & submission of Safety Inputs to BP
Pakistan on monthly basis.
o
Supervise the Electrical works including cable lying,
termination, testing, commissioning and taken the safety precautions
for these activities.
o
Work Permit authorization testing for employees under
the umbrella of BP’s Golden Safety Rules.
Safety
Officer (June 15 – July 31, 2004)
Worked
as a Safety Officer for Kadanwari Enhancement Project Of OMV Pakistan
at Kadanwari with Siemens Pakistan.
7-
Responsibilities:
o
Implementation & follow up of PTW system at site as
per Procedure of OMV.
o
Conducted the meeting with site management for
discussion regarding preparation of TRA
o
Preparation of Risk Assessment as per job requirements.
o
Inspection of Equipment and preparation of checklist.
o
Corresponding regarding HSE with OMV.
o
Preparation & Submission of weekly & Monthly HSE
reports to client
o
Conducted Safety Tool Box talk prior to start of daily
activities.
o
Inspection/ auditing of site & submitted to client.
HSE
Officer (March 03 – April 16, 2004)
Worked
as a HSE Officer SGS Pakistan, on behalf of Halcrow Pakistan at ENI
Pakistan’s Gas Field for Bhit – 8 wellhead project Supervised and
Safely completed as per requirements of Independent Monitoring
Consultants (IMC).
8-
Responsibilities:
o
All documentation of HSE, like Preparation of HSE
Database, weekly HSE reports
o
Preparation of Risk Assessment as per job requirements.
o
Arrangement of Safety Meetings
o
Collection of Safety observations and action taking.
o
Visual/physically Inspection of equipment & Vehicles
o
Resolved
the environmental concerns
Safety
Officer (Jan 10 – 29, 2004)
Worked
as a Safety Officer with Siemens Pakistan for “Annual Plant Shutdown
& Overhaul” of ICI PTA Limited, Port Qasim, Karachi.
9-
Responsibilities:
o
Implementation of Work Permit System
o
Preparation of Risk Assessment as per job requirements.
o
Submitted the Safety Observations to Manager SHE of PTA
on daily basis
o
Arrangement of Safety Meetings on weekly basis.
o
Conducted Safety Meetings on daily basis
o
Supervise the Electrical activities like, Temporary
power supply to whole plant
o
Cable laying, relay testing, Maintenance of various
analog and digital instruments
o
Ensure the Isolation and taken the safety precautions
for electrical shutdown activities.
Safety
Officer (Mar 2001 – Jan 2004)
Worked as a
Safety Officer with Siemens
Pakistan for BP Pakistan
Exploration & Production Inc. on following projects:
1
Tangri Amine Gas
Plant Installation
2
Zaure Gas Compressor Installations
3
Turk Facility Plant Piping replacements
4
Tanks Online Inspection of 35 Tanks at Khaskheli / Mazari /
Tangri / Laghari /Turk
Bukhari / Golarchi locations.
5
Tanks Cleaning, Sludge Disposal and Offline Inspection of 18
Tanks at Khaskheli /
Mazari
/ Laghari / Turk / Golarchi locations.
10-
Responsibilities:
o
Preparation of ‘Emergency Rescue / evacuation Plan’
prior to starting the project.
o
Preparation of TRAs (Task risk assessments).
o
Implementation of ‘Permit to work’ system.
o
Manage all HSE requirements for lifting operation,
Piping, Scaffolding, Excavation, installation of Equipments.
o
Preparation of Incident/ accident reports
o
Preparation of equipments’ Checklists.
o
Conduct daily GCMs (Group communication meetings)
o
Conduct Fire drills.
o
Arrangements of safety training to supervisors,
firewatchers, and new comers
employees.
o
Preparation & submission of Safety Inputs to BP
Pakistan on monthly basis.
Safety
Officer (Feb
01 – 20 2002)
Worked
as a Safety Officer with Siemens Pakistan for “Annual Shutdown” of
Fauji Jordan Fertilizer Company (FJFC), Karachi.
11-
Responsibilities
o
Supervise HSE related concerns for Lifting of equipment
and bundles of Heat Exchangers.
o
Continuous monitoring the opening of heat exchangers and
taken the all safety precautions.
o
Monitoring the Cleaning of Heat Exchanger tubes,
cleaning with high pressure water jetting Machines.
Safety
Supervisor (Dec 1999 – July 2001)
Worked
as a Safety Supervisor with Marathon Construction Company Limited at
Badin Concession block of BP Pakistan Exploration & Production
Inc.
12-
Responsibilities
o
To supervise HSE aspects as per client policies and
procedures.
o
Preparation of ‘Emergency Rescue / evacuation Plan’
prior to starting the project.
o
Preparation of TRAs (Task risk assessments).
o
Implementation of ‘Permit to work’ system.
o
Manage all HSE requirements for lifting operation,
Piping, Scaffolding, Excavation, installation of Equipments.
o
Preparation of equipments’ Checklists.
o
Conduct daily GCMs (Group communication meetings)
o
Arranged/ Conduct Fire drills.
o
Arrangements of safety training to supervisors,
firewatchers, and new comers
employees.
o
Preparation & submission of Safety Inputs to BP
Pakistan on monthly basis.
Assistant
Electrical Engineer (July 1997 – Nov
1999)
Worked
as an Assistant Electrical Engineer with Mirpur Khas Sugar Mills
Limited
13-
Responsibilities:
o
Maintenance work of Generators, Switch Gear, Motors, and
Transformers.
o
Maintenance of Office and Employees residential colony
of Mill.
o
Installation, Commissioning and operation of 5MW CMER,
Peter Brotherhood four stage Steam Turbine, Steam inlet Pressure 300
Psig and Steam inlet temperature 300 Celsius and HT generator of GEC
ALSTHOM ENGLAND 5MW, 3.3 KV.
Electrical
Engineer (Feb 1995 - May 1997)
Worked
as an Electrical Engineer. at Projects of
IBRD & OECF program on behalf of WAPDA (Water & Power
Development Authority of Pakistan), with M/s LRE (Electrical
Distribution Company) Hyderabad.
14-
Responsibilities
o
Execute the Installation of new Feeders/ lines of
Overhead Transmission & Distribution lines of 11KV/440V at remote
areas of Karachi & rural areas of Sindh Province.
Site
Engineer (Jun 1992 - Dec 1994)
Worked
as a Site Engineer for 220KV, 110 km Transmission & Distribution
line project from Dera Murad Jamali to Sibbi, Baluchistan with M/s
Power Line Construction Company Lahore.
15-
Responsibilities
o
Execute/ supervision of civil work of Foundations,
Erection of 74m height towers & stringing work.
Junior
Engineer (Mar 1990 - Apr 1992)
Worked
as a Junior Engineer with M/s Progressive Planners (Electrical
Engineering Consulting Firm), Karachi.
16-
Responsibilities
o
Calculation work of lighting and cables.
o
Supervision of Electrical Construction jobs for
Commercial Building and Factories.
o
Execute the job consultant point of view.
RELEVANT
PERSONAL INFORMATION
NATIONALITY
: PAKISTANI
MARITAL STATUS :
MARRIED
PASSPORT
# :
AC6135251
......................................................
SAFETY
SS002-08
JAMAL
KHAN KHATTAK
PERSONAL
DATA: Fathers Name: :HABIB
ULLAH KHAN Date of Birth :02/01/1955 Marital
Status : Married Religion : Islam Languages
: known Fluent in English, Arabic, Hindi, Urdu and Pashto. EDUCATIONAL
QUALIFICATION:
Diploma of "Associate Engineer"
from (PAF) Pakistan Air Force in FIRE
FIGHTING PROCEDURES and SAFETY PRACTICES COURSES. Secondary
School Certificate Passed from Board of
Intermediate and Secondary Education Peshawar (Pakistan) with First
Division in Science. CAREER
OBJECTIVES: A challenging and diversified position
where I can utilize my extensive technical background,
skills and field experience operation. To join a quality organization
with competitive that provides opportunities to enhance my 18
years of applied engineering practice in the area of safety and
would like to secure a job making my skills, qualification
and experiences where I shall be among dynamic
intellectuals. My experience in safety engineering is applied across a
wide variety of areas that can help in Asses the particular
accident situation with respect to liability of various parties.
My main objective will be effectiveness with efficiency in discipline.
My interest will always be towards formulating plans and strategies
and implementing them successfully a head competitors. TOTAL
EXPERIENCE:
Having Total 18 years full furnished experience
including the Gulf Region in the field of Safety
in Engineering, Civil, Mechanical Petrochemical Sector
and High Rise Buildings.
EXPERIENCE PROFILE IN FOREIGN:
(STATE OF QATAR):
|
1.
|
Duration
|
Presently
working – April 14, 2007
|
|
|
Position
|
HSE
Engineer & officer
|
|
|
Employer
|
Descon
Engineering LLC, Qatar
|
|
|
Project
|
Pearl
GTL Qatar Gas Shell JK/KBR Project (8005) Ras Laffan – State
of Qatar
|
|
2.
|
Duration
|
Mar
22, 2006 to May 08, 2006
|
|
|
Position
|
HSE
Supervisor
|
|
|
Employer
|
Descon
Engineering LLC Qatar
|
|
|
Project
|
Dolphin
Onshore Facilities project RLIC, Qatar , CTJV (Chiyoda Technip
Joint Venture) Qatar Gas-2 LNG Project Ras Laffan, Qatar and
W-5 workshop, Olefin project Qatar Gas-2
|
|
3.
|
Duration
|
May
20, 2006 to 4 NOV 2006
|
|
|
Position
|
HSES
Manager
|
|
|
Employer
|
Thinet
International Company Doha – Qatar
|
|
|
Project
|
Prestigious
Cultural Village Project phase 2 at West Bay Lagoon -
Under supervision of Maunsell Consultancy Services Ltd. Doha
– Qatar.
|
| 4. |
Duration: |
14
November, 2005 to 20 March, 2006 |
|
Position |
HSES
Manager |
|
Employer
|
Helipolis
Electric & Contracting Company |
|
Project |
Qatar
Govt Electrical Cable Works KINGDOM
OF SAUDI ARABIA (KSA. |
| 5. |
Duration
|
15
Feb1997 to, 23 Mar,1998 |
|
Position |
Health,
Safety, Environment & Security Officer |
|
Employer
|
LITTON
PHILIPP HOLZMANN |
|
Project |
LITTON
PHILIPP HOLZMANN JOINT VENTURE OF LITTON CONSTRUCTION SERVICES
LIMITED AND PHILIPP HOLLZMANN AG, Tabuk Riyadh, (KSA. |
GOVT.
OF AFGHANISTAN: (3rd
March 2004 to 10 Nov,2005)
HSES Manager
in Saita
Afghanistan C.C. Project:
It was involved in
major work of city road project (municipal corporation) of kandahar.
Rehabilitation and improvement work of Panjaran and also access road
project [ANA Regional Brigade Project QALAT (American Corps of
Engineering and addition to it it was involved in construction of
buildings, camps and roads etc.). ABU
DHABI (UAE):-04
Jan: 2000 to 24 Sept: 2000.SAFETY
OFFICER in DESCON ENGINEERING LTD.
Project:
GASCO ENHANCEMENT PROJECT HASBSHAN BUB DIVISION – U A E. 28
sept: 2000 to 8 Aug: 2001.HSE Officer
in DESCON ENGINEERING LTD.Project:(ADCO)
BUB PROJECT HASBSHAN DIVISION UAE.
10 Aug: 2001 to 23 Dec: 2001.HSE
Officer in Descon
Engineering Ltd. Project: GASCO
PLANT SHUTDOWN AT HABSHAN BUB DIVISION U A E. 30
Dec: 2001 to 15 Oct: 2003.HSE Site Inchage
Officer in Descon
Engineering Ltd. Project:
(Borouge) Step-2 Project: Ruwais
Abu Dhabi U.A.E. 17 Oct: 2003 to
9 Jan: 2004.HSE OFFICER in DESCON
ENGINEERING LTD.Project:(Borouge)
T/A Abdudhabi Polymer Company Ltd. Shutdown UAE.
ISLAMIC
REPUBLIC OF PAKISTAN:-
|
1.
|
Duration
|
1980
to 1985
|
|
|
Position
|
NCO
I/C Safety Audit Team in (PAF)
|
|
|
Employer
|
Pakistan
Air force
|
|
|
Project
|
Pakistan
Air force
|
|
2.
|
Duration
|
Feb
12-1988 to June-15-1989
|
|
|
Position
|
HSE
Supervisor
|
|
|
Employer
|
Seimens
Pakistan Engineering (Pvt) Ltd.
|
|
|
Project
|
BOC
Process Plant (Port Bin Qasim) Pakistan
|
|
3.
|
Duration
|
June
16-1989 to Sept 24-1990
|
|
|
Position
|
HSE
Supervisor
|
|
|
Employer
|
Seimens
Pakistan Engineering (Pvt) Ltd.
|
|
|
Project
|
(OGDCL)
Uch Gas Field Turbine Project (BALUCHISTAN) Pakistan.
|
|
4.
|
Duration
|
Sept
25-1990 to Dec-26-1990
|
|
|
Position
|
HSE
OFFICER
|
|
|
Employer
|
Siemens
Pakistan Engineering (Pvt)Ltd
|
|
|
Project
|
SSGC
Sui Gas Field Turbine Project Baluchistan Pak.
|
PROFESSIONAL
TRAINING COURSES AND CERTIFICATION: 1.Got
a Competency Certificate in HSES
SUPERVISION & LEADERSHIP PROGRAM from JGC
(Japan Gas Company) Middle East FZE DOLPHIN ONSHORE
FACILITIES PROJECT, RAS LAFFAN INDUSTRIAL CITY, QATAR.2.Also got
another Certificate of Competency in HSES
INCIDENT/ ACCIDENT INVESTIGATION & REPORTING from JGC
(Japan Gas Company) Middle East FZE DOLPHIN ONSHORE FACILITIES
PROJECT, RAS LAFFAN INDUSTRIAL CITY, QATAR.3. Moreover,
I got H2S/BA Certificate from
JGC (Japan Gas Company) Middle East FZE
DOLPHIN ONSHORE FACILITIES PROJECT, RAS LAFFAN INDUSTRIAL CITY, QATAR.4.
An additional to it, I also got another H2S/
BA Breathing Apparatus Familiarization Course Certificate
from QATARGAS RAS LAFFAN INDUSTRIAL CITY,
QATAR. 5.Certified Trainer
of Training of Trainees in HSES.6. I obtained DIPLOMA
OF "ASSOCIATE ENGINEER" in FIRE FIGHTING AND SAFETY
PRACTICES COURSES from PAKISTAN
AIR FORCE. PROFESSIONAL TRAINING
OF 08 MODULES AND OTHER DIFFERENT JOBS RELATING TO SAFETY CONDUCTED BY
JGC–QATAR: 1.Supervision & Leadership program 2.
Management in HSES 3. General Safety 4. Security control
& Monitoring 5. Environmental control &
Monitoring 6. Occupational health 7. Behavioral
based safety 8. SWMS (Safe work method statement) ADDITIONAL
SAFETY JOB COURSES CONDUCTED BY JGC - QATAR :1 HSES
SUPERVISION & LEADERSHIP. 2. INCIDENT / ACCIDENT INVESTIGATION
& REPORTING 3 SCAFFOLDING SAFETY 4. WORKING AT
HEIGHT. 5. BASIC FIRST AID 6 CRANE SAFETY 7. CONFINED SPACE
ENTRY 8 TRAIN THE TRAINER 9 POWER TOOLS.
10. ELECTRICAL SAFETY 11 PERMIT TO WORK (PTW COMMISSIONING) 12
EXCAVATION SAFETY 13 CONSTRUCTION SAFETY 14.CONSTRUCTION H &
S 15 100 PERCENT TIE OFF 16 LOTO (LOG OUT- TAG OUT) 17 MAN
LIFTING TRAINING 18 MONITORING RIGGING & LIFTING 19
HAZARDOUS MATERIALS SAFETY 20 HAND SAFETY 21. OFFICE SAFETY
& SECURITY 22 HAZARDOUS MATERIALS SAFETY 23
HAZARD AREA SAFETY 24 CHEMICAL SAFETY 25 .QATAR OPERATION
PHASE SYSTEM 26 WELDING, CUTTING AND GRINDING SAFETY (HOT
WORKS) 27. HEAT STRESS 28. THERMAL STRESS 29. HYDRO TESTING HAZARDS 30
WATCH TRAINING 31 . GAS TESTING & MONITORING 32. FIRE WARDEN
TRAINING 33 MSDS (MATERIAL SAFETY DATA
SHEET) 34. RISK ASSESSMENT 35. RADIOGRAPHY TRAINING 36. GAS CYLINDER
SAFETY 37 . MATERIALS HANDLING 38. HAZARDS IDENTIFICATION 39.
EMERGENCY PREPAREDNESS 40. PERMIT TO WORK 41. ENVIRONMENT AWARENESS
42. HEALTH HAZARDS. KEY ACCOUNT
ABILITIES/ RESPONSIBILITIES: 1The purpose of my
position will be to provide with high level of support to all project,
organization on all activities pertaining to HEALTH SAFETY and
ENVIRONMENT POLICY and decision making to ensure the addressing of
HSEQ commitments in compliance with corporate and regulatory
requirements, thereby contributing to eliminate/ reduce the Risk and
Loss exposure with and project / organization concerned.2.Possible
LEADERSHIP & Team development qualities clear verbal & written
communication and belief in high standards of HSE policies. 3.I am
expert in strong communication interpersonal, report writing and
negotiation skill. 4 I can lead and
participate in specialist work groups for Risk and Hazard assessment
in the development and implementation of procedures and work practices
recommendations and documented work practices in order to monitor and
maintain Risk Level to ALARP. 5I will assist fields in preparing
Emergency Response Plans based on the Risk that potentially impact the
business and provide periodic scenario to verify the effectiveness of
such plans. 6. Participation in HSESQ Meetings and other forums to
influence change for continual. 7. I am able for making planning
independently lead & conduct HSESQ Audits / Review including HSESQ
Management System Audit Environmental Management System Audit Planned
Audits etc, and follow up for the implementation of recommendations.
8. Having complete knowledge and expertise on the Environmental impact
Assessment Methodology and procedures and also able to work in the
environmentally sensitive areas..JOB
RESPONSIBILITIES: 1. Be responsible for all safe
working operations being segregating and handling all the official
documents (weekly ) monthly) Also following safety plan. 2 .
Responsible for Preparation of Safety statements. 3. Responsible
for preparation and arrangements of Tool Box meetings with all workers
as well as with the supervisors. 4 Responsible for
preparation of daily site safety reports being submitting project
Manager and consultants. 5 Responsible for
inspection / monitoring and implementation of safety rules and policy
at site.6 Responsible for arranging indoctrination
training for new workers. 7. Responsible for auditing safety
management system as auditor. 8 . Checking emergency response
plans and conducting emergency drills. 9. Conducting
investigation of accidents / incidents. 10. Inspection of Scaffolding
(Erection) / Dismantling plant & Machineries. 11. Enforce,
supervise, & control; implementation of company HSE management
system. 12 .Conduct HSE awareness campaigns in the form of
presentation, safety talks. 13. Conduct in house Training
(Incident & reporting / Risk assessments, HSE Audits, Emergency
Response and various HSE related Topics) as required and frequently.
MAJOR ACCOMPLISHMENTS: A
FORMIDABLE RECORD OF LOST TIME INCIDENTS / ACCIDENTS HAS BEEN ACHIEVED
INDIVIDUALLY IN THE CAREER. APPRECIATION CERTIFICATE FROM MAUNSELL
CONSULTANCY SERVICES LTD. DOHA, QATAR, FOR COMPLETION OF ACCIDENT FREE
PROJECT.
......................................................
SAFETY
SS003-08
AMANULLAH
KHAN GHAZI
Ø
A result oriented professional with 8
years of International exposure in oil & Gas field in HSE
Management.
Ø
Proven track record of Health,
Safety and Environments discipline, Aramco & SABIC standards and
operational policies, planning & implementing effective control
measures in the Safety departments.
Ø
Expertise
in Health, Safety and Environments training programs for workers to
keep focus high energy level and team spirit in the employees.
Ø
Excellent
written, communication, inter personal, liaison and problem solving
skills with the ability to work in multi cultural environment.
Ø
Execute
all meeting in safety departments including tool box meeting and daily
inspection analysis.
Ø
Aware
of OSHA standards and CSM procedure.
Ø
Member of the HSE Committee in Saudi
Aramco projects.
Health,
Safety & Environments
Ø
Developing and implementing procedures, control systems for
maintaining safety hygiene and quality standards.
Ø
Leading efforts for streamlining programmed and generating cost
savings in operational projects.
Ø
Responsible for making tool box meeting and coordinating with in
charges for resolving their concerns/ needs regarding safety.
Ø
Managing the fire fighting and first aid exercise schedules
with constant tie-ups with all project routine and implementing safety
promotional strategies.
Ø
Ensure safe operations and supervision in all aspects
of project management including men, material and environments to
ensure compliance with safe, quality & hygiene standards.
Ø
Co-ordinate with operating staff for upkeep employees safe work
environments and all equipment in perfect working order to produce a
good progress.
Employees
Management/Training
Ø
Conducting
training session and orientations to new employees for safe work of
operations.
Ø
Handling
operational functions like pre-shifts staff briefings, creating the
duty roster of safety departments.
Ø
Imparting
appropriate training on fire fighting, first aid, evacuation drill,
Safe work and Teamwork to rescue in any emergencies.
Ø
Organizing
and conducting practical and theoretical training programs, to enhance
skills and motivational levels.
- Saudi
Arabia Experience (from Jan 2004 till Present)
|
Client
|
Saudi
Aramco
|
|
Contractor
|
Dena
Bilad Marine Services Co. Ltd
|
|
Project
|
Marine
Port Maintenance
|
|
Duration
|
Jan
2004 to Dec 2004
|
|
Position
|
Marine
Equipments Specialist & Safety Engineer
|
I
was attached with Saudi Aramco
in Marine Department for a contract of one year by
SAS General Contracting to
Dena Bilad Marine Services Co. Ltd. I worked as Marine
Equipments Specialist & Safety Engineer, where I was responsible
for the maintenance and safety of all Marine vessels’ equipments
including Main Engines, Diesel Engines, Pumps, Compressor and Life
safety arrangements. I am also having experience of SAP system in
Plant Maintenance transactions and I was responsible for engines spare
parts arrangement and procurements.
|
Client
|
Saudi
petrochemical Co.(SADAF) SABIC
|
|
Contractor
|
SAS
General Contracting
|
|
Project
|
Plant
Maintenance Project
|
|
Duration
|
Jan
2005 to June 2005
|
|
Position
|
Safety
Engineer
|
I was attached with Saudi
Petrochemicals Co. SADAF (SABIC) in Engineering Safety Department
for a period of six months by SAS General Contracting. I have
done Equipment Safety Course
and I was appointed as Safety Engineer for a unit, where I was
responsible for HSE responsibilities of Chlorine Unit. I used to do
the fire fighting and evacuation dill in the plant unit area.
|
Client
|
SAFCO
(SABIC)
|
|
Contractor
|
Udhy
Arabia Ltd.
|
|
Project
|
SAFCO-IV
Project
|
|
Duration
|
Jul
2005 to Jun 2006
|
|
Position
|
Safety
Engineer
|
I was attached with SAFCO-IV project as Safety Engineer, where I was
responsible for following works:
Ø
Prepare, revise/update and implement the Safety, Health and
Environmental programs.
Ø
Organized, supervise and perform
daily, weekly, monthly or any other inspection related to
Safety, Health and Environmental.
Ø
Report to the Project Manager as safety department’s
representative regarding any issue in the absence of Safety Manger.
Ø
Organized, schedule and prepare the agenda of weekly tool box
meeting for the Project staff and all employees.
Ø
Attend regularly scheduled weekly and monthly meeting with the
safety department of company as well with the client.
Ø
Timely reported on any accident/incident related to the
project.
Ø
Provides changing in the safety requirements.
Ø
Provide first aid at the scene of accident/incident.
Ø
Take part in discussion on injury, damage and loss control.
Ø
Inspect the work site on daily basis to report and correct the
unsafe act or condition.
|
Client
|
Saudi
Aramco
|
|
Contractor
|
Snamprogetti
Eni
|
|
Project
|
GTC
Hawaya Project
|
|
Duration
|
Jul
2006 to May 2007
|
|
Position
|
Safety
Engineer
|
I
worked with Modern Arab Construction Co. Ltd for their on going
project under Snamprogetti with Saudi Aramco in GTC Hawaya Projects,
where I was responsible for following works:
Ø
Prepare, revise/update and implement the Safety, Health and
Environmental programs.
Ø
Organized, supervise and perform
daily, weekly, monthly or any other inspection related to
Safety, Health and Environmental.
Ø
Report to the Project Manager as safety department’s
representative regarding any issue in the absence of Safety Manger.
Ø
Organized, schedule and prepare the agenda of weekly tool box
meeting for the Project staff and all employees.
Ø
Attend regularly scheduled weekly and monthly meeting with the
safety department of company as well with the client.
Ø
Timely reported on any accident/incident related to the
project.
Ø
Provides changing in the safety requirements.
Ø
Provide first aid at the scene of accident/incident.
Ø
Take part in discussion on injury, damage and loss control.
Ø
Inspect the work site on daily basis to report and correct the
unsafe act or condition.
|
Client
|
Saudi
Aramco
|
|
Contractor
|
Snamprogetti
Eni.
|
|
Project
|
Khurais
Crud (K.C.C) Project
|
|
Duration
|
Jun2007
to Aug 2007
|
|
Position
|
Safety
Engineer
|
After
completion of Hawaya project I was transferred to Khurais. I worked
with Modern Arab Construction Co. Ltd for their on going project under
Snamprogetti with Saudi Aramco at Khurais Crud Facilities (K.C.C)
Project, where I was responsible for following works:
Ø
Prepare, revise/update and implement the Safety, Health and
Environmental programs.
Ø
Organized, supervise and perform
daily, weekly, monthly or any other inspection related to
Safety, Health and Environmental.
Ø
Report to the Project Manager as safety department’s
representative regarding any issue in the absence of Safety Manger.
Ø
Organized, schedule and prepare the agenda of weekly tool box
meeting for the Project staff and all employees.
Ø
Attend regularly scheduled weekly and monthly meeting with the
safety department of company as well with the client.
Ø
Timely reported on any accident/incident related to the
project.
Ø
Provides changing in the safety requirements.
Ø
Provide first aid at the scene of accident/incident.
Ø
Take part in discussion on injury, damage and loss control.
Ø
Inspect the work site on daily basis to report and correct the
unsafe act or condition.
|
Client
|
Saudi
Aramco
|
|
Contractor
|
Snamprogetti
Eni.
|
|
Project
|
Khurais
Crud (K.C.C) Project
|
|
Duration
|
Sep
2007 till Present
|
|
Position
|
Safety
Manager
|
During the project I was promoted to Safety Manger at Khurais Crud
Facilities (K.C.C) Project, where I was responsible for following
works:
Ø
Managing all over the safety department during the project.
Ø
Responsible for the safety of all men and material of the
company and directly answerable to Project manager in any issue
related safety.
Ø
Prepare, revise/update and implement the Safety, Health and
Environmental programs.
Ø
Organized, supervise and perform
daily, weekly, monthly or any other inspection related to
Safety, Health and Environmental.
Ø
Report to the Project Manager as safety department’s
representative regarding any issue in the absence of Safety Manger.
Ø
Organized, schedule and prepare the agenda of weekly tool box
meeting for the Project staff and all employees.
Ø
Attend regularly scheduled weekly and monthly meeting with the
safety department of company as well with the client.
Ø
Timely reported on any accident/incident related to the
project.
Ø
Provides changing in the safety requirements.
Ø
Provide first aid at the scene of accident/incident.
Ø
Take part in discussion on injury, damage and loss control.
Ø
Inspect the work site on daily basis to report and correct the
unsafe act or condition.
- Home
land Experience as Lieutenant Pakistan Navy (from Jan 2000 to
Oct 2004)
a.
Assistant Engineering Officer of the ship (Jan
2000 to Dec 2001)
After
completion of my B.E (Mech.), I worked as Assistant Engineering
Officer of the ship for two year. I am having experience of
corresponding to the official mails. I was responsible for men &
materials of Engineering Department. I involved in the procurement of
engineering parts. I also worked assistant to the Chief Engineering
officer. I was appointed as Maintenance Officer; I worked on ‘D’
type boiler having a working pressure of 44 Bar. During my period I
was responsible for the maintenance of following equipments and I have
experience on these equipments.
Ø
Twin spool steam turbine.
Ø
Main condenser (Heat exchanger) of the ship.
Ø
Economical evaporator for producing fresh water.
Ø
Low pressure Reciprocating/Centrifuge compressors.
Ø
Different types of pumps.
Ø
Double reduction gearbox system.
b.
NBCDC & Fire Fighting Officer (Jan 2002 to Oct
2003)
I
done all the safety courses in Pakistan Navy so I was appointed as
Nuclear Biological Chemical Damage Control & Fire Fighting Officer
in Dockyard worked for two years as NBCDC & FF officer, where I
was responsible for the following activities:
Ø
Prepare, revise/update and implement the NBCD & Fire
fighting programs.
Ø
Organized, supervise and perform
daily, weekly, monthly or any other inspection related to NBCD
& Fire fighting.
Ø
Report to the Director as department’s representative
regarding any issue in the NBCD & Fire fighting.
Ø
Organized, schedule and prepare the agenda of weekly tool box
meeting for the staff and all employees.
Ø
Attend regularly scheduled weekly and monthly meeting with the
safety department of company as well with the client.
Ø
Timely reported on any accident/incident related to the
project.
Ø
Provides changing in the safety requirements.
Ø
Provide first aid at the scene of accident/incident.
Ø
Take part in discussion on injury, damage and loss control.
Ø
Inspect the work site on daily basis to report and correct the
unsafe act or condition.
Ø
Tagging and labeling of all fire fighting equipments, valves
and pipes.
Ø
Human Resource Management of the workers.
|
1.
|
Jan
2000 to Dec 2001
|
Assistant
Engineering Officer of the ship
|
|
2.
|
Jan
2002 to Oct 2003
|
NBCD
& Fire Fighting Officer
|
|
3.
|
Jan
2004 to Dec 2004
|
Marine
Equipments Specialist & Safety Engineer
|
|
4.
|
Jan
2005 to June 2005
|
Safety
Engineer
|
|
5.
|
July
2005 to May 2007
|
Safety
Engineer
|
|
6.
|
Jun
2007 to Aug 2007
|
Safety
Engineer
|
|
7.
|
Sep
2007 till Present
|
Safety
Manger
|
AWARDS
& MAJOR ACHIEVEMENTS
Ø
Qualified B.E (Mech.) in First Division from NUST.
Ø
Selected for JOSDC course and successfully qualified.
Ø
Awarded Recognition Certificate from Saudi Aramco.
Ø
Awarded Letter of Appreciation from Saudi Aramco.
Ø
Awarded Best Employee of the year 2004 by SAS General
contracting Est.
Ø
Qualified Work Permit Receiver from Saudi Aramco.
Ø
Qualified Work Permit Receiver from Gulf stabilizer
Industries.
Ø
Awarded Best Safety
Engineer of the Quarter from SAFCO-IV (SABIC).
Ø
Awarded letter of appreciation from SNAMPROGETTI Hawaya
project
Ø
B.E (Mech.) from Pakistan Navy Engineering College PNS JAUHAR
(PAKISTAN).
Ø
Engineering Competency Certificate from PNS MOAWIN (PAKISTAN).
Ø
Junior Officer Staff Duty Course from PNS RAHNUMA (PAKISTAN).
Ø
Fire Fighting and Damage Control Course from PNS KARSAZ
(PAKISTAN).
Ø
First Aid course from PNS KARSAZ (PAKISTAN).
Ø
Sea Survival Course from PNS HIMALAYA (PAKISTAN).
Ø
Human Resources Development Course from PNS RAHNUMA (PAKISTAN).
Ø
Instructional Technique (officer) Course from PNS RAHNUMA
(PAKISTAN).
a.
Operating System :Windows XP,
MS office 2000, XP, MS PowerPoint, MS Project & MS Access
b.
Business Software : S A P System
c.
Internet: E-mail, Internet surfing.
Ø
Joined Pakistan Navy as N-Cadet in Feb 1991 and completed F.Sc
Pre-Engineering from Pakistan Navy Junior Cadet College in Feb 1993.
Ø
Commissioned in the rank of Sub Lieutenant (Engineering Branch)
on July 1997.
Ø
Qualified B.E (Mech.) from Pakistan Navy Engineering College
Karachi, affiliated with National University of Science &
Technology (NUST) in July 2000.
Ø
Opted resign on personnel reason on 1st September
2003.
Ø
Material Status
Married
Ø
Nationality
Pakistani
Ø
Driving License
Saudi Valid License
Ø
Language known
Urdu, English, Pushto, Punjabi, Arabic
......................................................
SAFETY
SS004-08
MUHAMMAD
ZAFAR JAMALI
Objectives:-
To
become the management professional working with the organization and
to lead the organization up to its peak.
Personal Information:-Father’s
Name:Yar Muhammad
Jamali
Nationality: Pakistani
Date
Of Birth:
20/08/1966
NIC
NO:41303-5221735-7
Domicile:
Hyderabad, Sindh, Pakistan
. EDUCATIONAL
HISTORY:
-Intermediate:
B.I.S.E. Hyderabad
.Matriculation:
B.I.S.E
Hyderabad
.EXPERIENCE:-
14 Years Safety Officer
.April
1, 2001 to April 1, 2003. Safety Officer/ Permit Man
.Company:
Western
Geco (Schumberger)
. (Crew
4001 District Badin Sindh.) 28 August 1994 to December 2000. Safety
Officer. Company: Asif
Ghee Corporation( Gas
Plant)
13 May , 2003 to date. Safety Supervisor.
Company: Sepal
Builders( Hyderabad)
. JOB
RESPONSIBILITIES:-
To
carry out safety activities and ensure all safety procedures.
To
carry out permits for work permits for GECO
WESTERN Co. in the Badin*
District.
Follow
all governmental and private property holders for issuing permits for
work
. ACHIEVEMENTS:-
Certificate
of Recognition from WESTERN
GECO, CREW-4001 in 2001.
......................................................
SAFETY
SS005-08
TAHIR HUSSAIN KALWAR
Academic
History:-
B.C.S: Shah
Abdul Latif University
Khairpur Mir’s,Pakistan.August 2000 - July 2003.(* 1st
Division*-Computer Science) H.S.C:
Govt:Degree
College
Mirpur Mathelo,Pakistan. August 1997 - July 1999.(*1st
Division* -Science) S.S.C:
Govt:High
SchoolMirpur
Mathelo,Pakistan. August 1995 - July 1997.(*1st Division*
-Science) Technical
Skills:-IT
(Software & Hardware) Expert.(1
0-Years).*Ms
office XP .98.ME (Word,Excell,Power Point) Expert.(10-Years).*Oracle,
SQL (Programming) Good.(3-Years).*C/C++,
Beginner.(01-years).*Internet
Operations & Net working Expert.(08-yEARS). Career
Profile:-*Fazal
& Sons
Engro Chemical Pakistan Ltd (ECPL),
Daharki. Safety
Supervisor
(Plant, Off-Site) Duty
to Monitor all given Projects with Safety.( Safety Talks before do any
job) Civil
Projects:-
(Inside & Outside of the Plant) Soiling, RCC, Sludge Removal,
Lime mixing & Housekeeping of Canal Water, URUT.DCS Room Revamp,
Lay Anti Static Flooring Tiles in IS, Modification in Engg. Manager
Office. Mechanical Projects:-Uplift
of Mechanical Shack at Ammonia II, Removal of SG-671 Foundation /
Pillars. Transportation
Projects:-
Pickup for ENCON Project, New Mini Bus for Station Duty, Bollan
Van for Shift Duty, Toyota-Hiace for Station Duty,2-D Diesel car
Pickup for GT-602 Upgrade Project
.My work
in the (ECPL) is to look after the labors, their needs and try to
fulfill them & also Well known about the Safety rules &
regulation. Jan
2007- Present.*Spectrum
International
Karachi. Online
Click Typist.
Prepare
all the Advertisements for the UK based company and run through
Network/internet in the entire world .Nov 2006 -& Present.
*Fazal
& Sons
Engro Chemical Pakistan Ltd (ECPL),
Daharki.Account Manager. Manage all related account Cash / Ledger
books and prepare all monthly bills, sheets related about projects and
manage payroll of the entire staff. Sep 2005 – Dec 2006.*Democratic
Commission for Human Development
(DCHD),
Lahore. Taluka Coordinator .Women Education Programmed Announced
by (DCHD) in selected area of Mirpur Mathelo, Prepare reports and
submitted to authorities .June 2004-May 2005.
*Pakistan Voluntary Health
&Nutrition Association. (PAVHNA)
Karachi.
Field
Officer (FO)
Supervise
in Primary Schools for School Nutrition Programme. Check and balance
of Milk & Biscuits, Prepare reports & submitted to the
authorities.
Oct -2003-May -2004.
Personal
Information:-
Father’s
Name:-Manzoor
Ahmed Kalwar N.I.C.No:- 45104-4791237-5. Date
of Birth:01.02.1982. Nationality :- Pakistani . Domicile:-District:
Ghotki (Rural).
......................................................
SAFETY
SS006-08
ABDUL
MAJEED
POST
APPLIED FOR:-
Safety
Inspector.
OBJECTIVE:-
A qualified individual with
diverse and dynamic culture and a team player with a positive attitude
and responsible works well in a group as well as an individual
situation.
Personal
data:
-Father.Name:
Tasleem Khan
Date of Birth:
15-02-1980
Marital Status:
Unmarried.
Nationality:
Pakistani.
Domicile:
Distt: Karak (NWFP)
Religion:
Islam
.ACADEMIC
QUALIFICATIONS:-
Passed S.S.C
Examination with 2nd division
.WORK
EXPERIENCE:-
Worked
as a “Safety Inspector” in SAITA AFGHANISTAN C.C Engineering and
Construction for two years.
Worked
with SIEMENS PAKISTAN Engineering (Pvt) Ltd as a “Safety
Inspector” in the project PARCO MCR Muzaffergarh Mehmood Kot
Pakistan for One and half years.
......................................................
SAFETY
SS007-08
ABDUL
SABOOR
POST
APPLIED FOR:-
Safety
Inspector.
OBJECTIVE:-
A qualified individual with diverse and dynamic culture and a
team player with a positive attitude and responsible works well in a
group as well as an individual situation.
Personal
data:
- Father.Name:
Hilal-Ud-Din
Nationality:
Pakistani
. Domicile:Distt:
Kohat (NWFP)
Religion:
Islam
. ACADEMIC
QUALIFICATIONS:
- *Passed
B.A Examination.
TECHNICAL
EDUCATION:-*
Diploma
of Associate Engineer (DAE) Mechanical from Govt.
Poly Technic Institute Kohat 1994.
*Diploma
Course DOC Mechanical Govt Vocational
Institute Kohat 1989
. WORK
EXPERIENCE:-
Worked
in MAGOTTEAUX INTERNATIONAL S.A from 07-032002 to 15-12-2003 as a
“Safety Inspector”.
Worked
as a “Safety Inspector” in HDK ENGINEERS RAWALPINDI from
25-02-2005 up to 11-04-2007.
......................................................
SAFETY
SS008-08
ARIF
ULLAH
POST
APPLIED FOR:-Safety
Inspector.
OBJECTIVE:-
A qualified individual with diverse and dynamic culture and a
team player with a positive attitude and responsible works well in a
group as well as an individual situation.
PERSONAL
DATA:-
Father.Name:
Lal Khan
. Date of Birth:
01-11-1990
. Nationality: Pakistani
. Domicile:
Distt: Bannu (NWFP)
. Religion:
Islam
. Languages Known:
English, Urdu, Pashto
. ACADEMIC
QUALIFICATIONS:
- Passed
S.S.C. Examination
.COMPUTER
SKILLS:- One diploma in Computer Science from T.T.C Karak
.WORK
EXPERIENCE:- I worked in SHAH ZAMAN (PVT) LTD as a
“Safety Inspector” for Two years.
An addition to it I also worked in ERECTION ENGINEERS &
CONTRACTORS PARCO – MCR MUZAFFAR GARH QASBA GUJRAT MEHMOOD KOT
Pakistan as a “Safety Inspector” for two years.
......................................................
SAFETY
SS009-08
WAHID
ULLAH
POST
APPLIED FOR:-Safety
Inspector.OBJECTIVE:-
A qualified individual with
diverse and dynamic culture and a team player with a positive attitude
and responsible works well in a group as well as an individual
situation. Personal data:-Father.Name:
Mir Qalam Khan
.Date of Birth:
03-02-1980
. Nationality:
Pakistani
. Domicile:
Distt: Karak (NWFP)
. Religion
:
Islam
.Languages Known:English,
Urdu, Pashto
.ACADEMIC
QUALIFICATIONS:
-Passed
Intermediate Examination (F.A)
.WORK
EXPERIENCE:-
I worked in Sezai Tukies Feyzi Akkaya Construction
Company as a “Safety Supervisor” for two and half years.
An addition to it I also worked in SIEMENS PAKISTAN ENGINEERING
(Pvt) Ltd in OGDCL Kunar LPG Plant Tando Jamm Sindh Pakistan for one
year.
......................................................
SAFETY
SS010-08
KAUSAR
IJAZ
POST
APPLIED FOR:-Safety
Inspector.
OBJECTIVE:-
A qualified individual with diverse and dynamic culture and a
team player with a positive attitude and responsible works well in a
group as well as an individual situation.
Personal data:-
Father Name:Ajab
Khan
. Date of Birth:
20/03/1975
. N.I.C #
:
14203-2064313-7
. Marital Status:
Married
.Nationality:Pakistani
.Domicile:
Distt: Karak (NWFP)
.Religion:
Islam.
ACADEMIC QUALIFICATIONS:- Passed
Intermediate Examination (F.A) with 2nd
division.WORK EXPERIENCE:- Worked
with PMC-JV as a “Safety Inspector” w.e.f Feb 09 2002 to Jan 03
2004. Worked with Shah Zaman (Pvt) Ltd as a “ Safety Inspector”
w.e.f April 02 2004 to Feb 20 2005.
......................................................
SAFETY
SS011-08
MANSOOR
JAMAL
POST
APPLIED FOR:-
Safety
Officer.OBJECTIVE:-
A qualified individual with
diverse and dynamic culture and a team player with a positive attitude
and responsible works well in a group as well as an individual
situation.
PERSONAL
DATA:-
Father
Name:
Jamal Khan
.Date
of Birth:
08-04-1983
.Marital
Status:
Unmarried
.Nationality:
Pakistani
.Domicile:
Distt: Karak (NWFP)
.Religion:
Islam
.ACADEMIC
QUALIFICATIONS:-
*Diploma
of Associate Engineer
.*F.Sc
Passed
.WORK
EXPERIENCE:-
Worked
with DESCON ENGINEERING (PVT) LTD as a “Safety Officer” for one
year in the project PARCO MCR Muzaffargarh Pakistan.
Worked
with
Erection
Engineers & Contricators Parco-Mcr Qasba Gujrat Distt:
Muzaffargarh (Pakitan (Pvt) Ltd
as a “
Safety Officer”for two years.
......................................................
SAFETY
SS012-08
MOHAMMAD
KHALIL
POST
APPLIED FOR:-Safety
Inspector.
OBJECTIVE:-
A qualified individual
with diverse and dynamic culture and a team player with a positive
attitude and responsible works well in a group as well as an
individual situation.
PERSONAL
DATA:-
Father.Name:Ali
Bad Shah
.Date
of Birth:
01-03-1969
.Marital
Status :
Married
. Nationality:
Pakistani
Domicile:
Distt: Karak (NWFP)
. Religion:
Islam
. ACADEMIC
QUALIFICATIONS:-Secondary
School Certificate Passed
.WORK
EXPERIENCE:-
Worked
with PMC-JV as a “Safety Inspector” w.e.f June 08 2002 to Jul 10
2004
.
Worked with ERECTION
ENGINEERS & CONTRICATORS PARCO-MCR QASBA GUJRAT DISTT:
MUZAFFARGARH (PAKITAN (Pvt) Ltd as a “ Safety Inspector” w.e.f JAN
15 2007 UPTO DATE.
......................................................
SAFETY
SS013-08
NAIK
MOHAMMAD
POST
APPLIED FOR:-Safety
Inspector
.OBJECTIVE:-
A qualified individual with diverse and dynamic culture and a team
player with a positive attitude and responsible works well in a group
as well as an individual situation.PERSONAL
DATA:-Father Name:
Jan Mohammad
.Nationality: Pakistani
.Domicile:
Distt: Karak (NWFP)
.Religion
:
Islam
.ACADEMIC
QUALIFICATIONS:
- Passed
S.S.C. Examination
.WORK
EXPERIENCE:-
Worked in SAITHA
AFGHANISTAN C.C CONSTRUCTION as a “Safety Inspector” from
03-03-2004 to 10-11-2005.
Worked as a “Safety Inspector” in SKB ENGINEERING &
CONSTRUCTION (PVT) LTD from 08-06-2002 upto 10-07-2003.
.....................................................
SAFETY
SS014-08
RASHID
ULLAH
POST
APPLIED FOR:-
Safety
Inspector.OBJECTIVE:
- A qualified
individual with diverse and dynamic culture and a team player with a
positive attitude and responsible works well in a group as well as an
individual situation. PERSONAL
DATA:- Father
Name: Lal
Khan
.Date of Birth:
16-02-1984
.Nationality: Pakistani
.Domicile:
Distt: Bannu (NWFP)
.Religion:
Islam
.Languages Known:English,
Urdu, Pashto.ACADEMIC QUALIFICATIONS:- Passed
Intermediate Examination (F.A). COMPUTER
SKILLS:- *Typing speed 30wpm. *Ms. Office
.WORK
EXPERIENCE:- I
worked in Sezai Tukies Feyzi Akkaya Construction
Company as a “Safety Inspector” for one and half years.An
addition to it I also worked in SIEMENS PAKISTAN ENGINEERING (Pvt) Ltd
in PARCO – MCR MUZAFFAR GARH QASBA GUJRAT MEHMOOD KOT Pakistan as a
“Safety Inspector” for two years.
.....................................................
SAFETY
SS015-08
ZAHID
SAEED
POST
APPLIED FOR:-
Safety
Officer.OBJECTIVE:-
I am
seeking a challenging and career-oriented job in a leading company to
show my skills in Safety. EDUCATION:-
January 2002 – January
2006:
BCS (Bachelor
of Computer Science 4 years honors (CGPA 3.67/4.0) IBMS Agriculture
University Peshawar.
Sep
1999 to Aug 2001: Intermediate
(Pre-Engineering) “A” Grade 713/1100 Islamia College Peshawar.
1998
– 1999: S.S.C
(Science) “A” grade 613/850 Islamia Collegiate School Peshawar.
Course:-
Safety
Course,MSCE (Microsoft
Certified System Engineer),
Hardware
and Ms Office.
LANGUAGES
KNOWN:-
English,Urdu,Pashto.
PERSONAL
DATA:-
Father.
Name
:
Arshad Saeed
.Date
of Birth:
April 08 1983
. Nationality:
Pakistani
Domicile:
Distt: Karak (NWFP)
Religion:
Islam
.WORK
EXPERIENCE:-
I
worked in Sezai Tukies Feyzi Akkaya
Construction Company as a
“Safety Officer” for two and half
years.
An addition to it I
also worked in TEKSER INTERNATIONAL (TURKEY) in
for one year
.Worked
in DESCON ENGINEERING (PVT) LTD as a
“Safety Officer” in the project of PARCO
– MCR Muzaffargarh Mehmood Kot Pakistan for one.
.....................................................
Click
View for more CV's
|